Loading...
12-101420A�kCITY OF Federal Way June 11, 2012 Sunny Ausink Pacific Telecom Services, PTS 111 South Jackson Street, Suite 200 Seattle, WA 98104 CITY HALL FILE 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com RE: File #12-101420-00-UP; PROCESS III— `PROJECT APPROVAL' AT&T Mobility SS40 — Aquatic Center, 650 SW Campus Drive, Federal Way Dear Ms. Ausink: The Community and Economic Development Department has completed administrative land use review of the proposed Personal Wireless Service Facility (PWSF) improvements located at 650 SW Campus Drive, Federal Way. The applicant proposes to modify the PWSF by adding three new LTE antennas to the existing 105-foot BPA transmission tower. Associated upgrades to equipment cabinets within existing ground lease area are also included. The proposed modification is part of AT&T's network implementation plan to provide 4G LTE coverage in the Federal Way area to better serve customers. The Process III Master Land Use (MLU) application submitted March 30, 2012, is hereby approved based on the enclosed findings of fact, incorporated into this decision in full, and the following conclusions based on those facts: 1. The proposal is consistent with the comprehensive plan; 2. The proposal is consistent with all applicable provisions of Federal Way Revised Code (FWRC); 3. The proposal is consistent with the public health, safety, and welfare; 4. The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal; 5. The proposed access to the subject property is at the optimal location and configuration; and 6. Traffic safety impacts for all modes of transportation, both on and off site, are adequately mitigated. The remainder of this letter outlines the land use review process required for this particular site improvement; summarizes the State Environmental Policy Act (SEPA) process; and provides other procedural information. This land use decision does not authorize initiation of construction activities. REVIEW PROCESSES REQUIRED Pursuant to FWRC 19.15.030(3), improvements and/or additions to an existing developed site that are not exempt from SEPA shall be processed under Use Process III. The Director of Community and Economic Development will make the initial land use decision based on written comments and information gathered during site plan review. Any appeals of the decision will be decided by the Hearing Examiner after a public hearing. SEPA PROCESS The City of Federal Way issued a Determination of Nonsignificance (DNS) on May 21, 2012, pursuant to Washington Administrative Code 197-11-350. Following review of the environmental checklist, the city Ms. Ausink June 11, 2011 Page 2 determined the proposal would not have a probable significant adverse impact on the environment, and an Environmental Impact Statement would not be required, and no SEPA based mitigation was necessary. CONDITIONS OF APPROVAL The following condition of approval is a component of this land use decision: • Prior to any site work, the applicant shall obtain an electrical permit from the city's Department of Community and Economic Development. For further information regarding electrical permits, please contact the department's permit center at 253-835-2607. REQUESTS FOR CHANGE OF VALUATION Any affected property owners may request a change in valuation for property tax purposes, not withstanding any program of revaluation. APPROVAL DURATION Unless modified or appealed, the Process III decision is valid for five years from the date of issuance of the decision. Time extensions to the decision may be requested prior to the lapse of approval following the provisions listed in FWRC 19.15.110. APPEALS The effective date of issuance is three calendar days following the date of this letter, or June 14, 2012. Pursuant to FWRC 19.65.120, this land use decision may be appealed by any person who submitted written comments or any person who has specifically requested a copy of the decision. Any appeal must be in the form of a letter delivered to the Community and Economic Development Department with the established fee and within 14 days after the effective date of issuance of this decision, or June 28, 2012. The appeal letter must contain a clear reference to the matter being appealed and a statement of the factual findings and conclusion of the Director disputed by the person filing the appeal. The Federal Way Hearing Examiner will hear any appeals of the Process III decision. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. If you have any questions regarding this decision, please contact Becky Chapin, Assistant Planner, at 253-835- 2641 or rebecca.chapin@cityoffederalway.com. Sincerely, Isaac Conlen Planning Manager for Patrick Doherty, Director enc: Exhibit `A' Statement of Findings and Conclusions Approved Plan Set c: email to: sausink@ptswa.com Becky Chapin, Assistant Planner 12-101420 Doc LD 61362 FILE CITY OF A Federal Way Exhibit A Findings for Project Approval Federal Way Revised Code (FWRC) Chapter 19.65 `Process III Project Approval' AT&T Mobility SS40 — Aquatic Center, File 12-101420-00-UP The Planning Division hereby presents the following analysis to the Director of Community and Economic Development pursuant to content requirements of the Process III written decision as set forth in Federal Way Revised Code (FWRC) 19.65.100(4). 1. Proposal — The applicant proposes to modify an existing Personal Wireless Service Facility (PWSF) by adding three new LTE antennas to the existing 105-foot BPA transmission tower. Associated upgrades to equipment cabinets within existing ground lease area are also included. The proposed modification is part of AT&T's network implementation plan to provide 4G LTE coverage in the Federal Way area to better serve customers. 2. Site Conditions — The PWSF is located on an existing 105-foot transmission tower along the BPA trail and the ground equipment is to be located in an existing fenced area at 650 SW Campus Drive, Federal Way. 3. Comprehensive Plan and Zoning — The City's Comprehensive Plan designation is Single Family, High Density and the zoning is Single Family Residential (RS7.2). PWSFs are permitted in the RS zone pursuant to FWRC 19.200.190. 4. Review Process — The replacement and addition of antennas to the existing PWSF is not exempt from State Environmental Policy Act (SEPA) review and is subject to Process III `Project Approval' review. 5. State Environmental Policy Act (SEPA) — The proposal is not exempt from environmental review pursuant to Washington Administrative Code 197-11-800(25)(a)(iii). The city utilized the Optional DNS process as allowed by SEPA Rules. A combined Notice of Application and Optional Determination of Nonsignificance was issued April 27, 2012. No comments were received during the integrated comment period. The city's Responsible Official issued a Determination of Nonsignificance May 21, 2012. The threshold determination appeal period ended June 4, 2012, with no appeals submitted to the Federal Way City Clerk. 6. Public Notice — Pursuant to Process III and SEPA regulations, a Notice of Land Use Application and Optional DNS were published in the Federal Way Mirror, posted at two locations at the subject site, and displayed on the designated city notice boards on April 27, 2012. Notices were also mailed to property owners within 300 feet of the subject property. No comments were received on the land use application or SEPA DNS notice. 7. Prioritized Locations — The applicant proposes to locate the PWSF on "Structures located in the BPA trail," which is the first priority location of the five prescribed in FWRC 19.255.010(4). The addition of three LTE antennas should provide the full benefit of service to the area. 8. PWSF Development Standards — PWSFs located on existing structures shall meet development standards prescribed in FWRC 19.255.020(1). The following are staff responses to each criterion: a. (ii) The PWSF exceeds the minor facility thresholds for number of antennas and size, but creates no more adverse impacts than a minor facility. Based on site photos and detailed drawings, the proposed addition will be installed in the same manner as the previously approved antennas and the visual impact will be unchanged. b. The combined antennas will not exceed 15 feet above the existing structure. The tower is 105 feet tall; the new antenna will be placed at the same height as the existing array; no additional height is proposed. C. This section does not apply as the proposed PWSF is not in a right-of-way. d. The proposed antennas will be painted to match existing tower. The impacts to surrounding uses will be no greater than the existing facility. e. The proposed size and number of the PWSF is necessary to meet coverage objectives as depicted in the project narrative provided by applicant. f. The proposed ground equipment will be added to an existing area. The footprint of the facility will not be enlarged and will meet the setback requirements. 9. Screening Standards — PWSFs are required to be screened using best available technology and design. The proposed antennas will be screened and painted to match the existing antennas. These measures appropriately mitigate visual impacts of the facility, cause no adverse cumulative effects, and meet aesthetic standards set forth in FWRC 19.255.020(1)(d). 10. Electronics Equipment Standards — Applicant proposes to upgrade the existing equipment enclosure with ancillary equipment. Proposed upgrades will occur within enclosure and no material expansions or changes to the architectural design of the enclosure are proposed. Therefore, these changes are exempt from PWSF standards set forth in FWRC Chapter 19.255 and are permitted outright with no further regulatory action required pursuant to FWRC 19.255.010(3)(g). 11. Security Screening — The PWSF includes existing structure and ground vault; no new fencing or expansion of existing fencing is proposed. 12. -Cumulative Effects — The city must consider the cumulative visual effects of the PWSF mounted on an existing structure in determining whether additional permits may be granted so as to riot adversely affect the visual character of the city. Based on the plans and photo -simulations of the proposed modifications, the PWSF will not adversely affect the visual character of the city. The additional antennas will be camouflaged through best available technology and design and will have less of an impact than creating a new PWSF site. 13. Conditions of Approval — The following conditions of approval shall be a component of the Process III land use decision: Prior to any site work, the applicant shall obtain an electrical permit from the city's Department of Community and Economic Development. 14. Process III Decision Criteria — Based on the above findings, staff has determined the proposal is consistent with applicable site plan approval criteria required for Process III `Project Approval' pursuant to the following FWRC 19.65.100(2) items. Staff responses (italicized) follow each criterion: a. It is consistent with the comprehensive plan; The proposal is consistent with the following FWCP goals and policies: PUGI — Work with private utility companies to allow them to provide full and timely service that meets the needs of the city's residents and businesses, both present and fitture. Findings for Project Approval Page 2 AT&T Mobility SS40 — Aquatic Center File 12-101420-00-UP/Doc Ln- 61356 PUG2 — Work with private utility companies to allow them to provide service in a way that balances cost-effectiveness with environmental protection, aesthetic impact, public safety, and public health. PUP17 — The city should require that site specific utility facilities such as antennas and substations be reasonably and appropriately sited and screened to mitigate adverse aesthetic impacts. b. It is consistent with all applicable provisions of this title; The site plan has been reviewed under FWRC Title 19, "Zoning and Development Code, " with specific attention to the following divisions and/or chapters: Division I, Administration; Chapter 19.65, Process III Project Approval; Chapter 19.200, Single Family Residential (RS); and Chapter 19.255, Personal Wireless Service Facilities. c. It is consistent with the public health, safety, and welfare; No adverse impacts are anticipated as a result of the proposal. The PWSF has received approval from Lakehaven Utility District. The Process III ML U application has been reviewed under SEPA, FWCP, and applicable provisions of the FWRC. d. The streets and utilities in the area of the subject property are adequate to serve the anticipated demand from the proposal; The city's Traffic Division has determined the PWSF will not require concurrency review and will not adversely affect the current level ofservice. The Lakehaven Utility District has determined no sewer or water improvements are required for the PWSF. e. The proposed access to the subject property is at the optimal location and configuration; The facility is an existing site and no changes are proposed to the access points to the facility. f. Traffic safety impacts for all modes of transportation, both on or offsite, are adequately mitt igated. As the facility is unmanned, this criterion ,is not applicable. These findings shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. Prepared by: Becky Chapin, Assistant Planner Findings for Project Approval AT&T Mobility SS40 — Aquatic Center Date: June 8, 2012 Page 3 File 12-101420-00-UP/Doc. I.D. 61356 CITY OF I Federal Way NOTICE OF LAND USE APPLICATION AND NOTICE OF OPTIONAL DETERMINATION OF NONSIGNIFICANCE (DNS) Project Name: AT&T Mobility SSO4 — Aquatic Center Project Description: Applicant proposes to modify an existing Personal Wireless Service Facility (PWSF) by adding three new LTE antennas to the existing 105-foot BPA transmission tower. Associated upgrades to equipment cabinets within existing ground lease area are also included. Applicant: Sunny Ausink, Pacific Telecom Services, on behalf of AT&T, 111 South Jackson Street #200, Seattle, WA 98104 Project Location: 650 SW Campus Drive, Federal Way Date Application Received: March 30, 2012 Date Determined Complete: April 24, 2012 Date of Notice of Application: April 27, 2012 Comment Due Date: May 14, 2012 Environmental Review: Based upon review of a completed environmental checklist and other information on file with the City, it is likely that the City of Federal Way will determine that the project will not have a probable significant adverse impact on the environment and expects to issue a Determination of Nonsignificance (DNS) for this project. The optional DNS process in WAC 197-11-355 is being used. This may be your only opportunity to comment on the environmental impacts of the proposed project. The proposal may include mitigation measures under applicable codes, and the review process may incorporate or require mitigation measures regardless of whether an environmental impact statement (EIS) is prepared. A copy of the subsequent threshold determination for the specific proposal may be obtained upon request. Agencies, tribes, and the public are encouraged to review and comment on the proposed project and its probable environmental impacts. Comments must be submitted by the date noted above. Permits Required by This Application: Master Land Use Process III (File #12-101420-UP) and State Environmental Policy Act Threshold Determination (File #12-101421-SE) Other Permits Known at this Time and Not Included in This Application: Electrical Permit Existing Environmental Documents: Environmental Checklist Relevant Environmental Documents Are Available at the Address Below: Yes Development Regulations to Be Used for Project Review Known at this Time: Federal Way Revised Code Title 14, `Environmental Policy' and Title 19 `Zoning and Development Code.' Public Comment & Appeals: Any person may submit written comments on the land use application or the environmental impacts of the proposal to the Director of Community and Economic Development by 5:00 p.m. on May 14, 2012. Only persons who submit written comments to the Director (address below) or specifically request a copy of the decision, may appeal the decision. However, any interested party may appeal the environmental threshold determination. Details of appeal procedures for the requested land use decision will be included with the written decision. Issuance of Final Environmental Determination: The final Determination of Nonsignificance may be issued without a second comment period, unless timely comments identify probable significant adverse impacts that were not considered by the Notice of Optional Determination of Nonsignificance. A copy of the Determination of Nonsignificance may be obtained upon request. Availability of File: The official project file is available for public review at the Department of Community and Economic Development, 33325 8`s Avenue South, Federal Way, WA 98003-6325. Staff Contact: Becky Chapin, Assistant Planner, 253-835-2641 Published in the Federal Way Mirror on April 27, 2012 Doc. LD. 60879 Q H LLu FMM 06 C cc C: 30 co ca w cu LL w r/ / � n N U ca N N ref aQ _ � X (II OP...< a) LL 0 Qcu O 3 "O U a) � 0. O a) — C p E m w O U) L-� O O -C U) r CO) U �•X �� a) � 0'a) _ N a)(O +' � L d> cu Q D X U W .S Q ca C �U m (D LL C) C) O 0 0 L O O 0 LO o a cc O C CO)U ca (/)S-- a) F— L C � -0 C (B O O =3 C p O () = C =�c .co) O Ne O E N ca ..0 cu �' •V c6 L ma(D� U Z D)LL cu 111 S Jackson St, 2,1 Floor eatUlie, WA 389 010 4 REt.1:1V 00 28 March 2012 MA� City of Federal Way Department of Community Development Services CITY ®F FED 33325 8th Avenue South ER� )�` Federal Way, WA 98003-6325 CDS RE: Process III Application Narrative — AT&T site modification — SS40 Aquatic Center (BPA transmission tower) — site address: 650 SW Campus Drive Dear Sir or Madam, Enclosed please find an the Master Land Use Application and eight (8) sets of drawings for a proposed AT&T modification to an existing wireless site located at 650 SW Campus Drive. The proposed modification consists of adding (3) new LTE antennas and ancillary equipment to the existing 105' tall BPA transmission tower. No height increase proposed. Proposed modifications do not change the use of the existing tower. There is no reduction, material change or adverse impact to landscaping, parking, utilities, approved architectural design, or environmentally critical areas as defined by FWRC 19.145. ANALYSIS OF STEALTH SCREENING FOR PROPOSED FACILITY PER FWRC 19.225.020(4). The modification will not result in a change in visual impact, and is part of a technology upgrade being performed on AT&T/New Cingular Wireless's network, in order to improve service to its customers and strengthen reliability and capacity in its network. No height increase is proposed. Pursuant to FWRC 19.255.020(20, PWSFs shall be screened or camouflaged through employing the best available technology and design. As proposed, the antennas are not overtly obtrusive. The proposed antennas will be painted to match the existing. The proposed equipment additions are exempt and no review is required as there are no material area expansion of the equipment area. Per the pre -application conference summary (#12-100538-00-PC), the submitted site plans do not need to depict existing landscaping around the existing enclosures. This is an existing wireless telecommunications facility located at the address referenced above. AT&T proposes to amend the facility to keep up with the demand while continuing to offer customers in the area quality service and access to greater and more advanced wireless services. The proposed change would add 4G technology to the site and would expand AT&T's 4G network footprint into and the immediate surrounding area. This proposed change would improve the on -street and in -car availability of 4G services (voice and data support for iPhone 4G phones for example) and would add in -building 4G services in the immediate vicinity of the site. Our current volume and payload data on this site shows a high amount of 3G data traffic. The new 4G technology will improve the overall internet/data experience of the customers in the area. This will mean faster data rate and higher efficiency. The proposed modification is part of an integrated network and if it is located too far or too close to an adjacent facility the network will not work. z The location of the site was picked because it is an existing facility. The proposed modification is part of AT&T's network implementation plan to provide 4G LTE coverage in the Federal Way area. The proposed installation of the antennas/ancillary equipment is intended to operate using the existing base equipment and infrastructure at the established site. Installing LTE in another location would require 111 S Jackson St, 2nd Floor Seattle, WA 98104 (206) 342 9000 building a completely new site, thus doubling the presence of wireless facilities within the same quarter mile area. There are no alternative sites that would provide the needed height to allow for the proper functioning of the equipment. There are no multifamily, commercial, or industrial structures tall enough to meet the required height coverage for this site. Alternative sites that would provide the needed height coverage would mean that AT&T would need to propose a new wireless tower or utilization of a city light pole and locate its antennas on it or locate on a new multifamily structure and increase its height — these proposals would aesthetically be more detrimental to the neighborhood. A new facility would not be less intrusive than what is being proposed. The proposed location not only will provide the needed coverage for AT&T it will also lead to fewer adverse impacts on adjacent land uses. Here, collocating the replacing the antennas contains the impacts of the additional antennas to a single location, thus impacting fewer properties. In addition, utilizing the existing equipment lease area and ground equipment further reduces impacts to other properties in the area by avoiding duplicate ground installations at multiple locations, eliminating the need for extensive trenching between the existing ground equipment and alternative locations. In addition, the proposed facility is a passive use; there are no activities that will produce airborne emissions, odor, vibration, heat, glare, or noxious/toxic materials. The site will operate continually, 24 hours a day for seven days a week. The site will be unmanned, requiring only frequent visits by maintenance personnel, typically once a month. Due to the limited amount of traffic generated by the proposal, no off -site street improvements are required for this application. The facility will not require water or wastewater facilities or contribute to erosion due to storm water run-off. The construction valuation is $15,000 The above statements are true and complete to the best of my knowledge. I understand City of Federal Way is relying on them to make its decision. Enclosed with this narrative you will find: Master Land Use Application • Applicable Fees • SEPA Checklist • (8) copies of the site plan folded • (8) copies of existing/proposed elevations folded • Color & Materials Indicators (photos) Please let me know if you require further information to process this application. Please feel free contact me with any questions you may have or if you need additional items from me at (206)446-0448 or via email at sausink@ptswa.com. Sin rely, Sunny A si Land Us ner 3 Pacific Telecom Services sausink(a)ptswa.com (206)446-0448 CITY OF Federal Way April 26, 2012 Sunny Ausink Pacific Telecom Services, PTS I I I South Jackson Street, #200 Seattle, WA 98104 CFTY HALL W ila� 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalvvay.com RE: File #12-101420-00-UP; NOTICE OF COMPLETE APPLICATION AT&T Mobility SS40 — Aquatic Center, 650 SW Campus Drive, Federal Way Dear Ms. Ausink: On March 30, 2012, the City of Federal Way's Department of Community and Economic Development received your Process III Land Use application to modify the existing Personal Wireless Service Facility (PWSF) by adding three new LTE antennas to the existing 105-foot BPA transmission tower. The proposal also includes associated upgrades to the ground equipment in the lease area. The Comprehensive Plan designation is Single -Family - High Density, and the zoning designation for the subject site is Single -Family Residential (RS7.2). Pursuant to the development application submittal requirements established in Federal Way Revised Code (FWRC) 19.65, the City has 28 days to determine whether your application is complete. NOTICE OF COMPLETE APPLICATION Please consider this letter as a Notice of Complete Application. Pursuant to the FWRC, the application is deemed complete as of April 24, 2012, based on a review of your submittal relative to those requirements as set out in the Development Requirements checklist. The submittal requirements are not intended to determine if an application conforms to the City of Federal Way codes; they are used only to determine if all required materials have been submitted. Having met the submittal requirements, a Notice of Application and Optional Environmental Determination of Nonsignificance (DNS) will be published in the Federal Way Mirror and posted at the subject property and on the City's official notice boards within 14 days of this letter. Notification will also be mailed to persons receiving property tax statements for property within 300 feet of the subject property. CLOSING A 120-day time line for reviewing the Process III application has started as of this date. The City has 120 days from the date that an application is deemed complete to take action on the application. However, the 120-day time line can be stopped at any time that the City requests additional information. You will be informed of the status of the 120-day time line when you are notified in writing that additional information is needed. If you have any questions regarding this letter or your development project, please contact me at 253-835-2641 or rebecca.chapin@cityoffederalway.com. Sincerely, Becky P C1 in Assistant in enc: NOA/DNS Doc. I D. 60869 SS40 AQUATIC CENTER 650 SW CAMPUS DRIVE FEDERAL WAY, WA 98003 AT&T 'lobility 16221 NE 72nd Way Redmond, WA 98052 becky Todd - Phone: (206) 342-6388 View #: 1 GoodmanNetworks at&t D.live,ed. November 28, 2011 The illustration above is a representation of the proposed project based on information provided by the client. Actual construction may vary dependent on approved construction plans and therefore PTS (Pacific Telecom Services) is not responsible for any post production design changes. Monotree disclaimer: (In the event that the proposed installation includes a monotree) The proposed installation is an artistic representation of a tree, and not intended to be an exact reproduction of an actual living tree. The final installation will have cables, cable ports, and various attachments, such as antennas, nuts, and bolts. While every effort will be made to disguise these components, they will not be readily apparent to the casual observer or passerby. However, upon close scrutiny, the true nature of the installation will be apparent. E REV: Prepared by: CJL Pacific Telecom Services, LLC LA] 3199 C Airport Loop Drive, Costa Mesa, CA 92626-3414 SS40 AQUATIC CENTER 650 SW CAMPUS DRIVE FEDERAL WAY, WA 98003 ti �ei �yi'��T• 1'1►' C AT&T Mobility 16221 NE 72nd Way Redmond, WA 98052 becky Todd - Phone: (206) 342-6388 View #: 2 )oodman Networks at&t November 28, 2011 The illustration above is a representation of the proposed project based on information provided by the client. Actual construction may vary dependent on approved construction plans and therefore PTS (Pacific Telecom Services) is not responsible for any post production design changes. Monotree disclaimer: (In the event that the proposed installation includes a monotree) The proposed installation is an artistic representation of a tree, and not intended to be an exact reproduction of an actual living tree. The final installation will have cables, cable ports, and various attachments, such as antennas, nuts, and bolts. While everyeffortwill be made to disguise these components, they will not be readily apparentto the casual observer or passerby. However, upon close scrutiny, the true nature of the installation will be apparent. REV: Prepared by: CJL pacific Telecom Services, LLC 3199 C Airport loop Drive, Costa Mesa, CA 92626-3414 r, Y` g� 1.2TH WAY SW a�EN= f p AJ o ppo oo Alli a fl ro 1 __ 0 rso En o 00 i 3Sh, ,p��gr E' N , ys 13s W* + r +� i 4•A. 'r iR P 3 d a"f .E- B T tt ®Qtt0 l l I 1 I m o4��ofYY.3xsa� ; � g m£R Fr: ; �>3.g m °5a, GRL=a�SRa Ka =_RRr > _ o� # 6 � A AQUATIC CENTER v, �� 3 F i SS40 `� 58 F•Fi = r�-h 1!pN 660 SW CAMPUS DRIVE k L .� 7� FEDERAL WAY, WA 90003 Il`` i S Print Map Page Page 1 of 1 11 Parcel Map and Data 11 4005 9043 9008 0030 7R-B 4047 *T-' 00 40 aa4s � 0580 070 0590 also 06M 0640 10 02M 0520 04M 0300 y 0450 fP 0320 0440 '1 0340 Jykst 0700 4PM0936king tuurity v35v 0110 a m 1921049051 1 Panther Lake r 4004 PW GAM ilg ow� 0111111111111111111311 Parcel Number 1921049051 Site Address 650 SW CAMPUS ❑R Zip code 98023 Taxpayer KING COUNTY -PARKS 3 information included on this map has been compiled by King County staff From a iety of sources and is subject to change without notice. King County makes no resentations or warranties, express or implied, as to accuracy, completeness, eiiness, or rights to the use of such information. King County shall not be liable for any feral, special, indirect, incidental, or consequential damages including, but not limited lost revenues or lost profits resulting from the use or misuse of the information stained on this map. Any sale of this map or information on this map Is prohibited ;ept by written permission of Kin Countv." King Count I GIS Center I News I Services I Comments I Search By visiting this and other King County web pages, you expressly agree to be bound by terms and conditions of the site. The details. http://www5.kingeounty.gov/parcelviewer/Print—Process.asp 3/29/2012 41k CIT Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South Federal Way, WA 98003-6325 MAR a 0 2012 253-835-2607; Fax 253-835-2609 LJ www.cityoffederalway.com OV VEDFRAL WAN ENVIRON NTAUCHECKLIST PURPOSE OF CHECKLIST The State Environmental Policy Act (SEPA), Revised Code of Washington (RCW) Chapter 43.21C, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. INSTRUCTIONS FOR APPLICANTS This environmental checklist asks you to describe some basic information about our proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." Complete answers to questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. USE OF CHECKLIST FOR NON -PROJECT PROPOSALS Complete this checklist for non -project proposals, even though questions may be answered "does not apply." In addition, complete the Supplemental Sheet for Non -Project Actions. For non -project actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. Bulletin #050 —January 1, 2011 Page 1 of 18 k:\Handouts\Environmental Checklist A. BACKGROUND 1. Name of proposed project, if applicable: AT&T MOBILITY SS40 AQUATIC CENTER 2. Name of applicant: AT&T MOBILITY 16221 NE 72ND WAY, RTC 3 REDMOND, WA 98052 3. Address and phone number of applicant and contact person: SUNNYAUSINK/PACIFIC TELECOM SERVICES 111 S. JACKSON STREET, 2ND FLOOR SEATTLE, WA 98104 5AU51NK@PTSWA.COM 206-446-0448 4. Date checklist prepared: MARCH 29, 2012 5. Agency requesting checklist: CITY OF FEDERAL WAY 6. Proposed timing or schedule (including phasing, if applicable): CONSTRUCTION WILL BEGIN UPON RECEIPT OF APPLICABLE PERMITS. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. YES, POSSIBLE UPGRADE OR ANTENNAS REPLACEMENT IF NEED BE. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. NONE KNOWN 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 0, M70114704[e1UTJ/►1 Bulletin #050 —January 1, 2011 Page 2 of 18 k:\Handouts\Environmental Checklist 10. List any government approvals or permits that will be needed for your proposal, if known. CITY OF FEDERAL WAY — SEPA DNS, PROCESS III LAND USE APPROVAL AND ELECTRICAL PERMIT. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. AT&T proposes to modify an existing wireless facility on existing BPA transmission tower by adding (3) LTE antennas and ancillary equipment. No height increase proposed. No expansion to the ground lease area. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Site address is located at 650 SW Campus Drive, APN#1921049051. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (circle one): flat, rolling, hilly, steep slopes, mountainous, other. GENERALLY FLAT b. What is the steepest slope on the site (approximate percent slope)? LESS THAN 1% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, mulch)? If you know the classification of agricultural soils, specify them and note any prime farmland. MAINLY CLAY Bulletin #050 — January 1, 2011 Page 3 of 18 k:\Handouts\Environmental Checklist d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. NONE KNOWN e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. THERE WILL BE NO FILLING OR GRADING TO THIS SITE. THIS IS AN EXISTING FACILITY, NO GROUND DISTURBANCE PROPOSED. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. EROSION COULD ONLY OCCUE FROM HEAVY MACHINERY MOVING ABOUTTHE SITE DURING THE CONSTRUCTION. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? NOT APPLICABLE. NO GROUND DISTURBANCE PROPOSED. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. BEST MANAGEMENT PRACTICES WILL BE USED DURING CONSTRUCTION. ' 2. AIR i. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. MINIMAL EMISSIONS WOULD RESULT FROM THE PROPOSAL. ANY POSSIBLE EMISSIONS WILL BE FROM VEHICLES ENTERING AND LEAVING SITE DURING CONSTRUCTION. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. NONE. Bulletin #050 —January 1, 2011 Page 4 of 18 k:\Handouts\Environmental Checklist c. Proposed measures to reduce or control emissions or other impacts to air, if any. NOT APPLICABLE 3. WATER a. Surface. 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. NONE 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. NO 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. NONE PROPOSED 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. NONE PROPOSED 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. NO 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. Bulletin #050 —January 1, 2011 Page 5 of 18 k:\Handouts\Environmental Checklist NOT APPLICABLE b. Ground. 1) Will ground water be withdrawn, or will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. MM 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. NOT APPLICABLE C. Water Runoff (including stormwater) 1) Describe the source of runoff (including stormwater) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. NOT APPLICABLE 2) Could waste materials enter ground or surface waters? If so, generally describe. NOT APPLICABLE d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any. NONE PROPOSED Bulletin #050 — January 1, 2011 Page 6 of 18 k:\Handouts\Environmental Checklist 4. PLANTS a. Check or circle types of vegetation found on the site. _x_ deciduous tree: alder, maple, aspen, other _evergreen tree: fir, cedar, pine, other shrubs _x_ grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other water plant: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? THIS IS EXISTING, NO VEGETATION WILL BE REMOVED OR ALTERED. c. List threatened or endangered species known to be on or near the site. NONE KNOWN d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any. NONE PROPOSED, THIS IS AN EXISTING WIRELESS FACILITY. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site. birds: hawk, heron, eagle, songbirds, other mammals: deer, bear, elk, beaver, other fish: bass, salmon, trout, herring, shellfish, other Bulletin 4050 —January 1, 2011 Page 7 of 18 k:\Handouts\Environmental Checklist b. List any threatened or endangered species known to be on or near the site. NONE KNOWN c. Is the site part of a migration route? If so, explain. 110 d. Proposed measures to preserve or enhance wildlife, if any. NONE PROPOSED 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. THE PROJECT WILL REQUIRE ACCESS TO EXISTING ELECTRICAL POWER AND TELEPHONE b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. PROJECT WILL NOT AFFECT THE POTENTIAL USE OF SOLAR ENERGY BY ADJACENT PROPERTIES. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any. NONE 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and Bulletin #050 —January 1, 2011 Page 8 of 18 kAHandouts\Environmental Checklist explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. NONE 1) Describe special emergency services that might be required. THIS IS UNSTAFFED WIRELESS FACILITY, NO EMERGENCY SERVICES REQUIRED. 2) Proposed measures to reduce or control environmental health hazards, if any. NONE PROPOSED. b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment operation, other)? NONE 2) What types and levels of noise would be created by or associated with the project on a short- term or long-term basis (for example: traffic, construction operation, other)? Indicate what hours noise would come from the site. THE ONLY NOISE WILL BE FROM THE EXISTING RADIO EQUIPMENT WHICH IS COMPARABLE TO THE SOUND OF AN AIR CONDITIONER. 3) Proposed measures to reduce or control noise impacts, if any. NONE NEEDED 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? Existing AT&T facility in an RS9.6 Residential Zone Bulletin #050 — January 1, 2011 Page 9 of 18 k:\Handouts\Environmental Checklist b. Has the site been used for agriculture? If so, describe. NO c. Describe any structures on the site. Existing AT&T facility on existing BPA transmission tower. d. Will any structures be demolished? If so, what? NO e. What is the current zoning classification of the site? RS7.2 f. What is the current comprehensive plan designation of the site? Residential g. If applicable, what is the current shoreline master program designation of the site? NOT KNOWN h. Has any part of the site been classified as an environmentally critical area? If so, specify. NONE i. Approximately how many people would reside or work in the completed project? Bulletin #050 — January 1, 2011 Page 10 of 18 k:\Handouts\Environmental Checklist NONE, THIS IS AN UNSTAFFED WIRELESS TELECOMMUNICATIONS FACILITY. j. Approximately how many people would the completed project displace? NONE k. Proposed measures to avoid or reduce displacement impacts, if any. NO MEASURES PROPOSED I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any. None proposed. 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. NONE, THIS IS AN UNSTAFFED WIRELESS TELECOMMUNICATIONS FACILITY. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. NOT APPLICABLE c. Proposed measures to reduce or control housing impacts, if any. 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal Bulletin #050 —January 1, 2011 Page i l of 18 k:\Handouts\Environmental Checklist exterior building material(s) proposed? Existing BPA transmission tower at 105' tall. b. What views in the immediate vicinity would be altered or obstructed? NO VIEWS WILL BE IMPACTED c. Proposed measures to reduce or control aesthetic impacts, if any. None Proposed 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? NONE b. Could light or glare from the finished project be a safety hazard or interfere with views? ►us] c. What existing off -site sources of light or glare may affect your proposal? 10U6 d. Proposed measures to reduce or control light and glare impacts, if any. NONE PROPOSED Bulletin #050 —January 1, 2011 Page 12 of 18 k:\landouts\Environmental Checklist 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? NONE IDENTIFIED b. Would the proposed displace any existing recreational uses? If so, describe. NO c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any. NOT APPLICABLE 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, nation, state, or local preservation registers known to be on or next to the site? If so, generally describe. TES b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. NONE c. Proposed measures to reduce or control impacts, if any. NONE PROPOSED Bulletin #050 —January 1, 2011 Page 13 of 18 k:\Handouts\Environmental Checklist 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. NO PUBLIC TRANSPORTATION WILL BE NEEDED FOR THIS UNMANNED WIRELESS TELECOMMUNICATION FACILITY. b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? NOT APPLICABLE — SITE WILL NOT REQUIRE PUBLIC ACCESS. c. How many parking spaces would the completed project have? How many would the project eliminate? THE SITE WILL NOT ELIMINATE ANY PARKING STALLS. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). f01[91►L e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. NONE f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. THE SITE WILL REQUIRE APPROXIMATELY ONE (1) VISIT PER MONTH BY A TECHNICIAN FOR SITE MAINTENANCE PURPOSES. Bulletin #050 — January 1, 2011 Page 14 of 18 k:\Handouts\Environmental Checklist g. Proposed measures to reduce or control transportation impacts, if any. NONE 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. NOT APPLICABLE b. Proposed measures to reduce or control direct impacts on public services, if any. NOT APPLICABLE 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other (please list) ELECTRICTY & TELEPHONE IS AVAILABLE AT SITE b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. ELECTRICITY & TELEPHONE WILL BE NEEDED. Bulletin #050 —January 1, 2011 Page 15 of 18 k:\Handouts\Environmental Checklist C. SIGNATURE The above answers are a relying on them to a its d SIGNATURE: DATE SUBMITTED: 03-29\2012 ete to the best of my kno iedg_e. I understand that the lead agency is Bulletin #050 — January 1, 2011 Page 16 of 18 k:\Handouts\Environmental Checklist D. SUPPLEMENTAL SHEET FOR NON -PROJECT ACTIONS Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the proposal, of the types of activities likely to result from the proposal, and if they are likely to affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? NOT APPLICABLE Proposed measures to avoid or reduce such increases: NONE PROPOSED How would the proposal be likely to affect plants, animals, fish, or marine life? NOT APPLICABLE Proposed measures to protect or conserve plants, animals, fish, or marine life. NONE PROPOSED How would the proposal be likely to deplete energy of natural resources? NOT APPLICABLE Proposed measures to protect or conserve energy and natural resources: NONE PROPOSED How would the proposal be likely to use or affect environmentally critical areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, Bulletin #050 —January 1, 2011 Page 17 of 18 k:\Handouts\Environmental Checklist threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? NOT APPLICABLE Proposed measures to protect such resources or to avoid or reduce impacts: NOT APPLICABLE 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans. NOT APPLICABLE Proposed measures to avoid or reduce shoreline and land use impacts: NONE PROPOSED How would the proposal be likely to increase demands on transportation or public service and utilities? NONE PROPOSED Proposed measures to reduce of respond to such demands: NOT APPLICABLE 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. NOT APPLICABLE Bulletin #050 — January 1, 2011 Page 18 of 18 k:\Handouts\Environmental Checklist �11ei COCBa YM 'AIM 1vtl303J ) �J C — �itl0 9Cd HYC MS 099 u co> v t AriD T a• ::� 1 t = y?nx=�vx3^oGosz i i g3�`=i3 ! l 1 H i IIa�Qo NO 0 0 A 411F DEPARTMENT OF COMMIINrff DEVELOPMENT SERVICES ~ 33325 8�' Avenue South PO Box 9718 CITY OF Federal Way WA 98063-9718 Federal Wa 253-835-2607; Fax 253-835-2609 Y www.cityoffederalway_com RECEIVED PWSF DEVELOPMENT REQUIREMENTSR 3 0 20112 ElPROCESS I (ADMINISTRATIVE) El PROCESS IV (HEARING EXAMINEE E or�►�.)W�'Y i�`PROCESS III (PROJECT APPROVAL) Narne: — 5,540 / 40 Y-A-Fic C Project Description: _ hdDdlfcnot� `-D WI Kav5s f • File No(s): • This form is to be used by an applicant as a guide in determining what constitutes a complete application and must be submitted with complete application. s All checked items must be submitted to constitute a complete application. • Applicant will be notified of a complete application within 28 days. o A complete application does not imply compliance or conformance with applicable codes. v Additional fees may be required for consultant review of critical areas, studies, mapping, materials, inspections, and/or reviews. Required Submitted IN ❑ A. Master Land Use Application, with owner's signature 1 ❑ B. Application fees �] ❑ C. Copy of entire underlying plat or King County Assessor's parcel map 1 ❑ D. Vicinity map on separate 8'h x 11 sheet ❑ ❑ E. Two copies of current title report (no more than 90 days old) for subject property Pf-r Pm - ❑ ❑ F. Current letters of water and sewer availability (only required for vacant property) ❑ ❑ G. Site photographs from each compass point (north, east, south, & west) referenced on the site plan Bulletin #046 — June 7, 2010 Page 1 of 5 k:\Handouts\PWSF Requirements General Plan Standards Six complete and folded sets of drawings (folded to 9x12 inches). ■ Minimum plan sheet size shall be 24x36 inches. • Plans must be drawn at an engineering scale that allows the entire plan to fit on one sheet. ■ Minimum scale is 1 to 20 unless otherwise authorized. • All information is to be legible. • Plans shall be prepared by a certified professional (licensed in the state of Washington) unless otherwise authorized. Required Submitted ❑ ❑ H. Topographic survey (may be required for Process III or Process IV applications as determined by the Planning Division) • Project name, plan date, and/or revision date(s) ■ Name, phone number, and license stamp of preparer • North arrow and bar scale • Site area • Property lines, utilities, easements, sidewalks, street edges, existing structures, parking, and site improvements (i.e. drainage systems with pipe sizes, invert and rim elevations, etc) • Structures and driveways within 150 feet of subject site (on both sides of street) • Minimum two foot contours for slopes less than 20 percent and five foot contours for slopes 20 percent or greater. Datum shall be King County Aerial Survey or NGVD-29 ■ Delineate slopes greater than 40 percent grade on or within 25 feet of the site • Delineate streams, ponds, wetlands, natural drainage courses, and other surface water features on or within 200 feet of site per Federal Way Revised Code (FWRC) Title 14, Chapter 30, "Critical Areas" • Identify significant trees defined by FWRC 19.125.080 ❑ I. Site plan • Project name, plan date, and/or revision date(s) • Name and phone number of owner/agent • Name, phone number, and license stamp of preparer • North arrow and bar scale • Vicinity map • Site area • Total parking stall count • Total gross floor area of all proposed floors or levels • Location and dimensions of existing/proposed structures, property lines, sidewalks, easements, parking layout, street edges, mechanical equipment, trash enclosures, outdoor uses, storage areas, fencing, rockeries, and retaining walls • Existing streams, ponds, wetlands, natural drainage courses, and other surface water features on or within 200 feet of site per FWRC Title 14, Chapter 30, "Critical Areas" Bulletin #046 — June 7, 2010 Page 2 of 5 k:\Handouts\PWSF Requirements Reuuired Submitted ■ Location of significant trees as defined by FWRC 19.125.080 • Existing and proposed utilities including: utility poles and boxes, water, storm sewer, sanitary sewer, and fire hydrants • Structures and driveways within 150 feet of subject site (on both sides of street) • IBC construction type for all proposed structures J. Preliminary drainage and grading plan • Project name, plan date, and/or revision date(s) • Name, phone number, and license stamp of preparer • North arrow and bar scale • Preliminary storm drainage system in accordance with the 2009 King County Surface Water Design Manual (KCSWDM), as amended by Federal Way • Preliminary grading plan with finished contours —minimum two foot contours for slopes less than 20 percent and five foot contours for slopes 20 percent or greater. Datum shall be King County Aerial Survey or NGVD-29 • Approximate cut & fill quantities of site earthwork • Total existing and proposed impervious surface area • Existing and proposed utilities including: utility poles and boxes, water, storm sewer, sanitary sewer, and fire hydrants 0 El K. Preliminary landscape plan • Project name, plan date, and/or revision date(s) • Name, phone number, and license stamp of preparer • North arrow and bar scale ■ Specific location, type, size, and number of significant trees to remain and to be removed • Plant schedule with the scientific name, common name, size, spacing, and quantity of each • Specific location and square footage calculations of drought tolerant landscaping (document that a minimum 25 percent is provided per FWRC 19.125.040(6) • Irrigation plan for lawn areas • Screening of outdoor facilities such as: trash/recycling enclosures, outdoor storage, and ground based mechanical equipment • Building wall area landscaping per FWRC 19.125.040 • Identify location and dimensions of existing and proposed vegetation, as well as landscape types (i.e.,1. II, III, or IV) • Specific placement of the PWSF and ground equipment on the site L. Building elevations • Project name, plan date, and/or revision date(s) • Name, phone number, and license stamp of preparer ■ Bar scale ■ Statement of architectural design intent, finish materials, and colors for all proposed structures • Front, rear, and side (labeled as north, south, east, and west) building elevations of proposed structures • Exterior wall openings • Exterior materials and colors board • Roof -top and ground based mechanical equipment screen details • Building height calculation Bulletin #046 — June 7, 2010 Page 3 of 5 k:\Handouts\PWSF Requirements Reouired Submitted ❑ M. State Environmental Policy Act (SEPA) Checklist • Six copies of the completed, signed, and dated SEPA checklist • SEPA application fee Special Studies and Additional Information ❑ Analysis of stealth screening or camouflage for proposed facility (FWRC 19.255.020[41) ❑ ❑ Preliminary technical information report addressing relevance of the 8 Core and 5 Special Requirements of the KCSWDM ❑ ❑ Geotechnical study ❑ ❑ Wetland delineation report ❑ ❑ Wetland mitigation plan ❑ ❑ Stream delineation and classification report ❑ ❑ Other information relating to design and siting of proposed development (including site cross sections) ❑ Specific information to determine compliance with city goals, policies, and regulations. For Process III and Process IV, written response to decision criteria for required ❑ ❑ land use review process Notice Requirements Process III— For applications that are located within, or are, 300 feet from properties zoned SE, RS, or RM, provide one set of self-addressed, stamped business sized envelopes (with City of Federal Way return address) of persons ❑ receiving property tax statements for all properties within 300 feet of the boundary of the subject property. Include a separate list of the addresses with their parcel numbers and an assessor's map showing the 300-foot boundary. Process IV — Provide two sets of self-addressed, stamped business sized envelopes (with City of Federal Way return address) of persons receiving property tax ❑ ❑ statements for all properties within 300 feet of the boundary of the subject property. Include a separate list of the addresses with their parcel numbers and an assessor's map showing the 300-foot boundary. SEPA — Provide one set of self-addressed, stamped business sized envelopes (with City of Federal Way return address) of persons receiving property tax statements for ❑ ❑ all properties within 300 feet of the boundary of the subject property. Include a separate list of the addresses with their parcel numbers and an assessor's map showing the 300-foot boundary. Important: Please do not submit metered envelopes. The Federal Way Post Office may refuse such envelopes. In addition, you are highly encouraged to use the Forever stamps. Bulletin #046 — June 7, 2010 Page 4 of 5 k:\Handouts\PWSF Requirements Required Submitted PWSF — Specific Application Requirements ❑ A diagram or map showing the primary viewshed of the proposed facility. (FWRC 19.255.050[1][a]) j ❑ Photosimulations of the proposed facility from affected properties and public rights - of -way at varying distances. (FWRC 19.255.050[1][b]) ❑ ❑ A coverage chart of the proposed PWSF at the requested height. (FWRC 19.255.050[1][d]) ❑ ❑ Written explanation of the need for that facility at that height and in that location. (FWRC 19.255.050[1][d]) Analysis of the feasibility of locating the proposed PWSF in each of the higher priority locations as identified in FWRC 19.255.010(4), and documentation of why ❑ ❑ locating the PWSF in each higher priority location and/or zone is not being proposed—FWRC 19.255.050(a)(d�—this documentation shall include analysis of the applicant's technical and network location re uirements. An inventory of other PWSF sites operated by the applicant or other providers ❑ ❑ within a one mile radius of the proposed PWSF location, including specific information about location, height, and design of each facility. (FWRC 19.255.050[l][e]) If the PWSF electronic equipment cabinet is proposed to be located above ground regardless of the proposed location, whether on private or public property or within ❑ ❑ public right-of-way, an explanation of why it is impracticable to locate the cabinet underground or any higher priority location not being proposed. _ (FWRC 19.255.020[5][a] and 19.255.050[l][g]) If the PWSF electronic equipment cabinet is proposed to be located in a public ❑ F1 right-of-way, an explanation of why it is impracticable to locate the equipment cabinet on adjacent property outside the public right-of-way. (FWRC 19.255.050[l][h]) ❑ ❑ Documentation of efforts to collocate on existing facilities. (FWRC 19.255.050[1][i]) A signed statement indicating that the applicant agrees to allow for the potential collocation of additional PWSF equipment by other providers on the applicant's structure or within the same site location —if an applicant contends that future ❑ ❑ collocation is not possible on their site, they must submit a technical study documenting why (FWRC 19.255.060[2])--collocation requirements shall not apply to PWSFs located on existing structures in appropriate public right-of-way within residential zones, nei boyhood business zones, and professional office zones. The City may require, at the applicant's expense, any additional information, mapping, studies, materials, inspections, or review that are reasonably necessary to ❑ ❑ implement the FWRC, and to require that such information, studies, mapping, materials, inspections, and reviews be reviewed by a qualified professional under contract to the City, also at the applicant's expense. (FWRC 19.255.050[ilb]) Minimum Submittal Requirements for Temporary PWSFs ❑ ❑ Documentation of previously permitted facility. (FWRC 19.255.050[2][a]) Site plan showing proposed location of temporary facility in relationship to the location of the previously permitted facility and property boundaries, including dimensions from the property lines and height of proposed facility. (FWRC 19.255.050[2][b]) ❑ ❑ Photographs of the proposed facility. (FWRC 19.255.050[2][c]) Bulletin #046 —June 7, 2010 Page 5 of 5 k:\Handouts\PWSF Requirements RECEIVED MAR a ® 201.2 ASTER LAND USE APPLICATION CITY CIF FEDERAL �1VA IIE:PARTNIENI'0ECONINILr11TY DE.VELGEMENTSERVICES CITY OF r� 33325 8"' Avenue South �+ PO Box 9718 Federal Way Federal Way Fax 98835-9718 2609 253-835-2607; flax 253-835-2609 �v� n�,c itvn f Fcdi: ra I tiv�. co=n APPLICATION No(s) �a. 0 � � ��-(O(4a l -oe -SE Date 03-28-2012 Project>iame SS40 AQUATIC CENTER Property Address/Location 650 SW CAMPUS DRIVE Parcel Number(s) 192.104-9003-08 (CIS) Project Description AT&T MOBILITY - MODIFICATION TO EXISTING SITE BY UPRGRADING WITH LTE ANTENNAS AND ADDING ANCILLARY EQUIPMENT PER PLANS Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment _ Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director=s Approval) Process 11 (Site Plan Review) X Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) _Process VI X SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Shoo Subdivision Subdivision Variance: CotmnerciaUResidential Required Information RS7.2 Zoning Designation Comprehensive Plan Designation Value of Existing Improvements $15,000 Value of Proposed Improvements International Building Code (IBC): U. S-2 Occupancy Type IIB Constriction Type Applicant Natne: AT&T MOBILITY Address: 16221 NE 72ND WAY, RTC 3 City/State: REDMOND. WA Zip: 98052 Phone: Fax: Email: Signature: Agent (if different than Applicant) Name: SUNNY AUSINK/ PTS Address: 111 S. JACKSON STREET#200 City/State: SEATTLE, WA Zip: 98104 Phone: 206-446-0448 Fax: 206-903-8513 Email: S K@PTSWA.COM Signature: Owner Name: CITY OF FEDERAL WAY Address: 33530 1ST WAY SOUTH CitylState: FEDERAL WAY, WA 98003 Zip: Phone: Fax: Email: Signature: SEE ATTACHED CONSENT LETTER BulleLin #003 — August 18, 2004 Page I of I k:\Handouts\Master Land Use Application RECEIVED VIA CERTIFIED U.S. MAIL: 7005 0390 0005 1658 4845 `L RETURN RECEIPT REQUESTED MAR 3 0 November 21, 2011 CITY OF FEDERAL WIi1 . City of Federal Way r n r, Attn: City Attorney 33325 8th Avenue South Federal Way, WA 98003 F-4) �U�1 RE: AT&T Communications Facility located at: 650 Southwest Campus Drive, Federal A Way, xt, AT&T LTE ID: SS40 Aquatic Center Dear Sir or Madam: Reference is made to the original Lease Agreement, dated August 6, 2001 and the First Amendment to Lease Agreement For New Cingular Wireless PCS, LLC, dated 7anuary 31, 2007 ("Lease", by and between The City of Federal Way Washington, a Washington municipal corporation ("City") and New Cingular Wireless PCS, LLC, a Delaware limited liability company e7ei anf ). AT&T proposes to modify its existing unstaffed telecommunication facility by removing (3) existing H-Frame antenna mounts and relocating (6) existing antennas, (2) per sector, to a new H-Frame antenna mount (3) total, (1) per sector, with the addition of (3) LTE panel antennas and (3) TMAs, plus addition of (6) RRH units, (6) diplexers mounted to a new H-frame within the existing AT&T vault (2) per LTE panel antenna, (1) GPS antenna mounted to an existing H-Frame and (1) LTE equipment rack located within the existing AT&T equipment vault. AT&T will obtain all necessary permitting prior to beginning any work. Pursuant to section 8, ("Improvements:"} "Tenant may update or replace the Equipment from time to time provided that the replacement facilities are not greater in number or size or different in type, color or shape or height than the existing facilities and that any change in their location on the Premises is approved in writing by City. Subject to the foregoing, Tenant may change the Equipment configuration specified in Exhibit B with the prior written approval of City. Tenant shall submit to City a written request for any such change and any supplemental materials as may be requested, for City's evaluation and approval. City shall have thirty (30) days after receipt of all requested materials in which to respond to such request and unless City so notifies Tenant to the contrary such approval shall be deemed granted..." and hereby submits the request for the City's consent. We anticipate this work being performed within the next 30 to 90 days and the work in question will take approximately 2 to 3 days. Should you want or require additional information, please send notification to my attention via email at tbattstone@owa_com. By executing below, you acknowledge your consent to the proposed modification. Please sign and send back to me at my e-mail above or in the self addressed stamped envelope for your convenience. If you have any questions, please contact me at (206) 406-8112. Thank you for your time. Landlord Consent Provided by: Sincerely, Name: M&A%J&Z zier Title: "I> cr tV. cez�ar 'Geri Battstone Site Acquisition Signature: Pacific Telecom Services, LLC Authorized AT&T Wireless Representative Date: ■ 41k CIT Federal Way APPLICATION NO(S) Project Name SS67 FEDERAL WAY EAST Property Address/Location Parcel Number(s) MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www. c i tyof fcd era lway.co_m 2101 SOUTH 324TH STREET — APN#162104-9037 APN#162104-9037 Date 03-28-2012 Project Description AT&T MOBILITY - MODIFICATION TO EXISTING SITE BY UPRGRADING WITH LTE ANTENNAS AND ADDING ANCILLARY EQUIPMENT PER PLANS PI.F.ASF, PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) x Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI x SEPA w/Proj ect SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information RM3600 Zoning Designation Comprehensive Plan Designation Value of Existing Improvements $15,000 Value of Proposed Improvements International Building Code (IBC): IIB Occupancy Type S-2 Construction Type Applicant Name: AT&T MOBILITY Address: 16221 NE 72ND WAY, RTC 3 City/State: REDMOND, WA Zip: 98052 Phone: Fax: Email: Signature: Agent (if different than Applicant) Name: SUNNY AUSINK/ PTS Address: 111 S. JACKSON STREET#200 City/State: SEATTLE, WA Zip: 98104 Phone: 206-446-0448 Fax: 206-903-8513 Email: IN PTSWA.COM Signature: Owner Name: BELMORE HOLDING,LTD Address: 1571 BELLEVUE AVE. SUITE 210 City/State: WEST VANCOUVER, BC Zip: Phone: 604-922-4161 Fax: Email: Signature: PLEASE SEE ATTACHED LEASE Bulletin #003 — August 18, 2004 Page 1 of 1 k:\Handouts\ivlaster Land Use Application �k CITY Federal o. Way APPLICATION NO(S) Project Name SS40 AQUATIC CENTER Property Address/Location Parcel Number(s) Project Description PLEASE PRINT 650 SW CAMPUS DRIVE 192104-9003-08 MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607; Fax 253-835-2609 www.cilyoffederalway.com Date 03-28-2012 AT&T MOBILITY - MODIFICATION TO EXISTING SITE BY UPRGRADING WITH LTE ANTENNAS AND ADDING ANCILLARY EQUIPMENT PER PLANS Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director=s Approval) Process II (Site Plan Review) X Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI X SEPAw/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information RS7.2 Zoning Designation Comprehensive Plan Designation Value of Existing Improvements $15,000 Value of Proposed Improvements International Building Code (IBC): U, S-2 Occupancy Type IIB Construction Type Applicant Name: AT&T MOBILITY Address: 16221 NE 72ND WAY, RTC 3 City/State: REDMOND, WA Zip: 98052 Phone: Fax: Email: Signature: Agent (if different than Applicant) Name: SUNNY AUSINK/ PTS Address: 111 S. JACKSON STREET#200 City/State: SEATTLE, WA Zip: 98104 Phone: 206-446-0448 Fax: 206-903-8513 Email: S I K@PTSWA.COM Signature: Owner Name: CITY OF FEDERAL WAY Address: 33530 1ST WAY SOUTH City/State: FEDERAL WAY, WA 98003 Zip: Phone: Fax: Email: Signature: SEE ATTACHED CONSENT LETTER Bulletin #003 — August 18, 2004 Page 1 of 1 k:\Handouts\Master Land Use Application VIA CERTIFIED U.S. MAIL: 7005 0390 0005 1658 4845 RETURN RECEIPT REQUESTED at&t November 21, 2011 City of Federal Way Attn: City Attorney NO f, 33325 8th Avenue South Federal Way, WA 98003 iNH ?U f ! 'E 7Y,,qq ems, W RE: AT&T Communications Facility located at: 650 Southwest Campus Drive, Federal Way,1�4)�,�3 } AT&T LTE ID: SS40 Aquatic Center Dear Sir or Madam: Reference is made to the original Lease Agreement, dated August 6, 2001 and the First Amendment to Lease Agreement for New Cingular Wireless PCS, LLC, dated January 31, 2007 ("Lease!), by and between The City of Federal Way Washington, a Washington municipal corporation ("City') and New Cingular Wireless PCS, LLC, a Delaware limited liability company ("Tenant'). AT&T proposes to modify its existing unstaffed telecommunication facility by removing (3) existing H-Frame antenna mounts and relocating (6) existing antennas, (2) per sector, to a new H-Frame antenna mount (3) total, (1) per sector, with the addition of (3) LTE panel antennas and (3) TMAs, phis addition of (6) RRH units, (6) diplexers mounted to a new H-frame within the existing AT&T vault (2) per LTE panel antenna, (1) GPS antenna mounted to an existing H-Frame and (1) LTE equipment rack located within the existing AT&T equipment vault. AT&T will obtain all necessary permitting prior to beginning any work. Pursuant to section 8, ("Improvements:") "Tenant may update or replace the Equipment from time to time provided that the replacement facilities are not greater in number or size or different in type, color or shape or height than the existing facilities and that any change in their location on the Premises is approved in writing by City. Subject to the foregoing, Tenant may change the Equipment configuration specified in Exhibit B with the prior written approval of City. Tenant shall submit to City a written request for any such change and any supplemental materials as may be requested, for City's evaluation and approval. City shall have thirty (30) days after receipt of all requested materials in which to respond to such request and unless City so notifies Tenant to the contrary such approval shall be deemed granted..." and hereby submits the request for the City's consent. We anticipate this work being performed within the next 30 to 90 days and the work in question will take approximately 2 to 3 days. Should you want or require additional information, please send notification to my attention via email at tbattstoneOptswa.com. By executing below, you acknowledge your consent to the proposed modification. Please sign and send back to me at my e-mail above or in the self addressed stamped envelope for your convenience. If you have any questions, please contact me at (206) 406-8112. Thank you for your time. Sincerely, Teri Banstone Site Acquisition Pacific Telecom Services, LLC Authorized AT&T Wireless Representative Landlord Consent Provided by: Name: Mpgul a t� S ■ d �..,� Title: V, re- C— Signature: Date: ■ Ole N � a m 0 0- 3 0 -1 c- c. (� PS (D — n- 0 CCD 'C a 13 a G a r T m y v Ngo r a(D � D m i 00 cf) oc rn w N cp cil 1 mWF mN= adz C m�;o �w0 r(A) Dim ��Zv [0 �=Z�m n w y� y� 23 � - H m w _ p N 40 0 � N � ! w O w m -i PRESORTEDFIRST CLASS ffia-4 0 V 0 Z�cc�"m 0 p R� r-i:6 c — 0 wmc 0 O _ 0 MDZ Z � M.m w iIOnom m zz m U o o unr►ren 9 t� —I 09 z —G C mUl m O M m D mj iz 0 m v�� rn m -44 N N CITY OF Federal Way CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 ted on recycled paper :J3;iL5 tith Avenue South Federal Way, WA 98003-6325 IREGBE DR4TFi EG+BETTY 926 SW 4PL FEDERA WAY WA 98023 l �� a --..� r•rrnrvcsn:s•F. !° ` 02 1ivLLI1 `" 4 000.4280238 APP 2 ; 201 r � Y MAILED FR0110 ZIP CGDE 08 _ ? RECEIVED BY COMMUNITY DEVELOPMENT DEPARTMENT 1321710180 MAY .01 2012 NIXIE 990 DE I Csc9 041MO/12 RETURN TO SENDER NOT DELIVERAMLE AS ADDRESSED UNABLE TO FORWARD RECEIVED. BY COMMUNITY DEVELOPMENT DEPARTMENT HARRIS 3 8247T WAY SWAPR 3 0 2U'1C FEDERAL WAY, WA 98023 REviLy1)° N TO S;EQNDER 1-1ARRIS' DOMBY MOVED LEFT NO ADDRESS UNABLE TO FORWARD RMTURN TO SENDER DE R 1i,i„i„i,}I,I,iI,,,,,I1,;ilIII ,ii,,,if] ,l,l,,,l,l,l,l,},,,li MOIR JOHN+CONNIE N 3146 W CALHOUN BLVD #2 MINNEAPOLIS MN 55416 a-m � -- --- .. _ . �i- j,,�i_IS ED ;=R,w '•:,i ZIP. r,Jr_— aE 4. .23 RECEIVED BY COMMUNITY DEVELOPMENT DEPARTMENT MAY 04 2012 NIXIE 553 DE 1 00 05"()2r12- RETURN TO SENDER NOT 13ELIVERABLE AS ADDRESSED .iPA3i = T�= ^4 BC: 98003632525 *03U78-02-834-02-30 nted on recycled paper rj. 0'9 IId711IiiiSIll,tiltd311II1t�lifiillf8111i1i41il�l,l]}SPs_I�?il� . , At all new services & grounding trenches, provide "WARNING" tape at 12" below grade. CALL BEFORE YOU DIG" 1-800-424-5555 UTILITY NOTIFICATION CENTER OF WASHINGTON STATE PROJECT DESCRIPTION: AT&T PROPOSES TO MODIFY AN EXISTING UNSTAFFED TELECOMMUNICATIONS FACILITY BY REMOVING (3) EXISTING H-FRAME ANTENNA MOUNTS AND RELOCATING (6) EXISTING ANTENNAS (2) PER SECTOR TO A NEW 6'-0- H-FRAME ANTENNA MOUNT (3) TOTAL (1) PER SECTOR WITH THE ADDITION OF (3) LTE PANEL ANTENNAS AND (3) TMAS. PLUS ADDITION OF (6) RRH UNITS, (6) DIPLEXERS MOUNTED TO A NEW H-FRAME WITHIN THE EXISTING AT&T EQUIPMENT VAULT (2) PER LTE PANEL ANTENNA, (1) GPS ANTENNA MOUNTED TO AN EXISTING H-FRAME AND (1) LTE EQUIPMENT RACK LOCATED WITHIN THE EXISTING AT&T EQUIPMENT VAULT. APPLICANT: PROPERTY OWNER: AT&T MOBILITY CITY OF FEDERAL WAY RTC BUILDING 3 33530 1ST WAY SOUTH 16221 NE 72ND WAY FEDERAL WAY, WA 98003 REDMOND, WA 98052 CONTACT: JOY KNIGHTON INFORMATION: -CODE ZONING CLASSIFICATION: R535.0 TOWER OWNER: BUILDING CODE: 200,L),IBC BPA CONSTRUCTION TYPE: IIB PO BOX 61409 JURISDICTION: CITY OF FEDERAL WAY PHONE: (360) 619-6328 CURRENT USE: TELECOMMUNICATIONS FACILITY IEAM LEAD: PROPOSED USE: TELECOMMUNICATIONS FACILITY WESTOWER 7525 SE 24TH STREET, SUITE 500 SITE LOCATION: ON NAD 83): MERCER ISLAND, WA 98040 _�BASEIIDI TOP OF STRUCTURE AGL: 105'-0" SITE ACQUI51TION: BASE OF STRUCTURE AMSL: 369.00$ PACIFIC TELECOM SERVICES, LI_C 111 SOUTH JACKSON STREET, 2ND FLOOR P��K�����, ' -'-'''-'-` PACIFIC TELECOM SERVICES, LLC 111 SOUTH JACKSON STREET, 2ND FLOOR SE}QTLE, WA 98104 CONTACT: SUNNYAUS|NK PH: (206) 342-6390 WESTOWER 7535 SE 24TH STREET, SUITE 500 MERCER ISLAND, WA 98040 CONTACT: KE[[H EU0ELL PH: /435\ 753-3458 WOM 1. PARKING REQUIREMENTS ARE UNCHANGED. RF ENGINEER: 2' TRAFFIC IS UNAFFECTED' VVESTDWER 7525 BE 24TH STREET, SUITE 500 MERCER ISLAND, WA 88040 CONTACT: M|CHELLE BRAASCH PR-r"""ECT TEAM PROJECT ARCHITEC R|CHARD B. HALL AIA PACIFIC TELECOM SERVICES, LLC 111 SOUTH JACKSON STREET, 2ND FLOOR SE/gTLE' WA 98104 CONTACT: CHR|S VV|CKLANDER PH: /2342-8306 EMAIL: CVV!CKLANDER@PT3WA.COM PROJECT CONSULTANT PACIFIC TELECOM SERVICES, LLC 111 SOUTH JACKSON STREET 2ND FLOOR SEATTLE, WA 88104 CONTACT KATE KENNEY PH: /206\ 909-9454 VVESTOWER 7525 SE 24TH STREET, SUITE 500 MERCER ISLAND, WA 98040 PH: (206) 819-4727 &M - 650 SW CAMPUS R', FEDERAL WAY, WA VICINITY / �� K� U |��U U D /�/ . �~_~�^ .� = " MAP °' "" m^^ START FROM REGIONAL OFFICE DEPART NE 72ND WAY TOWARD 164TH AVE NE 475 FT TURN RIGHT ONTO 164TH AVE NE, AND THEN IMMEDIATELY TURN RIGHT ONTO brAR CREEK PKWY 0.4 MI TURN LEFT ONTO LEARY WAY NE 0.1 MI ROAD NAME CHANCES TO NE LEARY WAY 0.2 MI TAKE RAMP RIGHT FOR WA-520 WEST TOWARD SEATTLE 5.0 MI TAKE RAMP RIGHT FOR 1-405 SOUTH TOWARD RENTON 15.0 MI ROAD NAME CHANGES TO WA-518 WEST 0.1 MI TAKE RAMP RIGHT FOR 1-5 SOUTH TOWARDPORTLAND 12.5 MI AT EXIT 142B, TAKE RAMP RIGHT AND FOLLOW SIGNS FOR WA- 18 WEST 0.7 MI ROAD NAME CHANGES TO SW CAMPUS DR 0.7 MI ARRIVE AT 650 SW CAMPUS DR, FEDERAL WAY, WA 98023 ON THE RIGHT APPROVAL DATE SIGNATURE APPROVAL DATE SIGNATURE RF ENGINEER: LANDLORD: RF MANAGER: SITE ACQUISITION, OPPS MANAGER: ZONING AGENT: CONSTR MANAGER: PROJECT MANAGM, NSB MANAGER: CONSTR MANAGER: EQUIP ENGINEER: REVIEWERS SHALL CLEARLY PLACE INITIALS ADJACENT TO EACH REDLINE NOTE AS DRAWINGS ARE BEING REVIEWED THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED, THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. DR-AWING INDEX SHEET]DESCRIPTION LEGAL DESCR-IPTION POR OF NE 1/4 OF SD SEC LY SELY OF SELY LN & ITS NELY & SWLY PROLONGATIONS OF TR B OF RIDGE DIV 5 T-1 TITLE SHEET G-1 GENERAL NOTES & SYMBOLS WLY OF CAMPUS VIEW DIV 3 & DIV 4 & LESS POR LY A-1 OVERALL SITE PLAN CAMPUS VIEW DIV #3 TH N 48-36-26 W 400 FT TH N A-3 EXISTING ENLARGED COMPOUND PLAN 84-07-21 W 313.99 FT TH S 08­15 W 485 FF TO SW A-4 PROPOSED ENLARGED COMPOUND PLAN CAMPUS DR & TERM OF SD LN & LESS POR OF SD NE A-5 EXISTING SOUTHWEST ELEVATION DR WITH SWLY EXTN OF LN SD TR B OF THE RIDGE EXISTING STORM DRAINAGE CHANNEL TH ALG SD TOP OF TRANS LN ESMT LY WLY OF' SW CAMPUS DR IN NE 1/4 E-1 GROUNDING SCHEMATIC PLAN OF SD SEC TOW NWLY 262.5 FT OF SD BONN TRANS LN E-2 GROUNDING DETAILS ESMT-L4 WITHIN SE 1/4 OF NW 1/4 SID SEC TOW NWLY 262.5 FT OF SD BONN TRANS LN ESMT IN NE 1/4 OF SW 1/4 OF SD SEC A/C AIR CONDITIONING HORZ HORIZONTAL PLYWD PLYWOOD AGL ABOVE GROUND LEVEL HR HOUR PROJ PROJECT APPROX APPROXIMATELY HT HEIGHT PROP PROPERTY HVAC HEATING PT PRESSURE TREATED BLDG BUILDING VENTILATION BLK BLOCKING AIR CONDITIONING REQ REQUIRED RM ROOM CLG CEILING ID INSIDE DIAMETER RO ROUGH OPENING CLR CLEAR IN INCH CONC CONCRETE INFO INFORMATION SHT SHEET CONST CONSTRUCTION INSUL INSULATION Sim SIMILAR CONT CONTINUOUS INT INTERIOR SPEC SPECIFICATION IBC INTERNATIONAL SF SQUARE FOOT DBL DOUBLE BUILDING CODE SS STAINLESS STEEL DIA DIAMETER STL STEEL DN DOWN STD STUD DET DETAIL MAX MAXIMUM SUSP SUSPENDED DWG DRAWING MECH MECHANICAL MTL METAL THRU THROUGH EA EACH MFR MANUFACTURE TNNG TINNED ELEC ELECTRICAL MIN MINIMUM EQ EQUAL MISC MISCELLANEOUS UNO UNLESS NOTED OTHERWISE EQUIP EQUIPMENT EXT EXTERIOR NA NOT APPLICABLE VERT VERTICAL NIC NOT IN CONTRACT VIF VERIFY IN FIELD FIN FINISH NTS NOT TO SCALE FLUOR FLOURESCENT W/ WITH FLR FLOOR 0C ON CENTER W/o WITHOUT FT FOOT OD OUTSIDE DIAMETER WP WATER PROOF GA GAUGE GALV GALVANIZED GC GENERAL CONTRACTOR GRND GROUND GYP BD GYPSUM WALL BOARD -ut&t Your world. Delivered. PACIFIC TELECOM SERVICES, LLC REVISIONS NO. DATE DESCRIPTION INITIAL 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE TITLE SHEET M A' CITY ������ GENERAL NOTES: 1. THE CONTRACTOR SHALL NOTIFY TOWER NETWORK CARRIER OF ANY ERRORS, OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE DISCOVERED 22. ALL EXISTING CONSTRUCTION, EQUIPMENT, AND FINISHES NOTED TO BE IN PLANS, DOCUMENTS, NOTES, OR SPECIFICATIONS PRIOR TO STARTING REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL CONSTRUCTION INCLUDING, BUT NOT LIMITED BY, DEMOLITION. THE BE REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY ERROR, OMISSION, OR INCONSISTENCY A. PROPERTY NOTED TO BE RETURNED TO THE OWNER. AFTER THE START OF CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF B. PROPERTY NOTED TO BE REMOVED BY THE OWNER. TOWER NETWORK CARRIER CONSTRUCTION PROJECT. MANAGER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. 23• THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING INSPECTORS THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE APPROVED BY TOWER NETWORK CARRIER CONSTRUCTION SHALL PROVIDE THE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, MATERIALS, AND FINISHES USED THROUGHOUT PROJECT MANAGER. THE PROJECT. TRADE STANDARDS AND/OR PUBLISHED MANUFACTURERS SPECIFICATIONS MEETING 2. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT OR EXCEEDING DESIGN REQUIREMENTS SHALL BE USED FOR INSTALLATION. THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT. CONTRACTORS 24. WHEN REQUIRED STORAGE OF MATERIALS OCCURS, THEY SHALL BE EVENLY DISTRIBUTED OVER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR HAVING BEEN ROUGH FRAMED FLOORS OR ROOFS SO AS NOT TO EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. TEMPORARY AWARDED THIS PROJECT SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT DOCUMENTS SHORING AND/OR BRACING IS TO BE PROVIDED WHERE THE STRUCTURE HAS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE NOT ATTAINED THE DESIGN STRENGTH FOR THE CONDITIONS PRESENT. ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS, OMISSIONS, OR DISCREPANCIES 25. PRIOR TO THE POURING OF ANY NEW SLAB OVER AN EXISTING SLAB THE SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER VERBALLY CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, CHASES, AND EQUIPMENT AND IN WRITING. WHICH ARE TO BE IMPLEMENTED INTO THE NEW WORK. ALL 3. FOR COLLOCATION SITES: CONTACT TOWER OWNER REPRESENTATIVE FOR ITEMS DESIGNATED TO BE ABANDONED SHALL BE NOTED AND DISCUSSED WITH THE OWNER AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT PARTICIPATION IN BID WALK. MANAGER AS PART OF THE AS -BUILT DRAWING PACKAGE. 4. NOT USED 26. SEAL ALL PENETRATIONS THROUGH FIRE -RATED AREAS WITH U.L. LISTED OR FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THIS FACILITY AND 5. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN OR PROJECT SITE. THE CONSTRUCTION AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS 27. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS NOTIFIED PRIOR TO ANY GRADING, CONSTRUCTION, AND ANY OTHER PROJECT EFFORT AS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND MANDATED BY THE GOVERNING AGENCY. IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS. THE BIDDER SHALL BEAR THE RESPONSIBILITY 28. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF OF NOTIFYING (IN WRITING) THE ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR OMISSIONS PRIOR NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT OF DURING CONSTRUCTION. DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, UNLESS DIRECTED 29. T,I E PROJECT " �{,`i4fE� _ O , �.�� �L�WPLETED, SHALL COMPLY WITH LOCAL SECURITY OTHERWISE. CODES AND TITLE-24 ENERGY CONSERVATION REQUIREMENTS. (TITLE-24 6. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE. TOWER NETWORK WHEN APPLICABLE) CARRIER IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING FROM THIS PRACTICE 30. ALL GLASS AND GLAZING IS TO COMPLY WITH CHAPTER 54 OF THE U.S. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS. CONSUMER SAFETY COMMISSION - SAFETY STANDARDS FOR ARCHITECTURAL 7. OWNER, CONTRACTOR, AND TOWER NETWORK CARRIER CONSTRUCTION GLAZING RE U MATERIALS (42 FR 1428, CFR PART 1201) AND LOCAL SECURITY Q EMENTS. PROJECT MANAGER SHALL MEET JOINTLY TO VERIFY ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION, 31. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING 8. THE GENERAL CONTRACTOR SHALL RECEIV E WRITTEN AUTHORIZATION TO IMPROVEMENTS, EASEMENTS, PAVING, CURBING, ETC. DURING CONSTR UCTION. UPON COMPLETION PROCEED WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT OF WORK, CONTRACTOR SH L REPAIR ANY DAMA GE THAT MAY HAVE OCCURRED DUE TO CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. CONSTRUCTI ON ON OR ABOUT THE PROPERTY. 9. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED HOURS TO AVOID DISTURBING NORMAL BUSINESS. 32. CONTRACTOR SHALL. KEEP GENERA GENERAL WORK AREA CLEAN AND HAZARD FREE DURING CONS,rRUC`TION AND DISPOSE OF ALL DIRT, DEBRIS, AND RUBBISH, 10. THE CONTRACTOR SHALL PROVIDE TOWER NETWORK CARRIER PROPER INSURANCE CON"ERACa TOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY OR PREMISES. SITE CERTIFICATES NAMING TOWER NETWORK CARRIER AS ADDITIONAL INSURED, AND TOWER NETWORK CARRIER PROOF SHALL BE LEFT IN CLEAN CONDITION ANDFREE FROM PAINT SPOTS, DUST, OR SMUDGES OF A NY NATURE. OF LICENSE(S) AND PE & PD INSURANCE. 11. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN 33. NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH IN FORM ; TEXTURE, FINISH, AND IN MATERIALS THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL, BE SOLELY EXCEPT AS NOTED IN THE PLANS AND SPECIFICATIONS. RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK .UNDER THE CONTRACT. 34 FFIE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, AND/OR SLEEVES REQUIRED FOR THE INSTALLATION OF FIXTURES 12. THE CONTRACTOR SHALL INSTALL ALL E UIP Q MENT AND MATERIALS MECHANCCAI I:QUIPMLAT, PLUMBING, HARDWARE, AND FINISH ITEMS TO INSURE A PROPER ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED AND COMPLETE JOB. OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECL'DENCE. 35. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A PROJECT LEVEL, 13, ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL STRAIGHT, AND TRUE ACCORDING TO THE PLANS. THE CONTRACTOR SHALL COMPARE I•ME LINES AND LEVELS BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES R REGULATIONS, AND ORDINANCES. OF THE EXISTING CONDITIONS WITH SHOWN THOSE N ON III1�� PLANS PRIOR TO THE START OF CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLYNETWORK ALL LAWS, `ORDINANCES, RULES, REGULATIONS AND ANY CONSTRUCTION. f A! I TOWER CARRIER SHALL BE NOTIFIED OF ANY ERRORS OMISSIONS, OR LAWFULWITH ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND M m � INCONSISTENCIES NC.,CJN..�f.,,�ll�Nt�(L.�a PRIOR 'TO ANY CONSTRUCTION. LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF THE WORK. 36. THE CONTRACTOR I `" S TO PROVIDE PROTECTION FOR ADJOINING PROPERTIES FROM PHYSICAL. FIARM, NOISE, DUST, DIRT, AND FIRE AS REQUIRED BY THE GOVERNING AGENCIES, 14. NOT USED 15. A COPY OF GOVERNING AGENCY IS APPROVED PLANS S rtIAI.I.. BE KEPT IN 37, WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS AND/OR REVISIONS AVAILABLE AS REQUIRED A PLACE SPECIFIED BY THE GOVERNING AGENCY AND Y B LAW, SI°IAII I�3L"° BY RESPONSIBLE FOR RECORD THE GOVERNING AGENCY RECORDING THE RESULTS. AVAILABLE FOR INSPECTION AT AI..I,, TIMES. THE ORIGINAL PERMIT" SET' PLANS ARE NOT 'TO BE USED THE WORKMEN. HE CONSTRUCTION SETS SH 38. THE CONTRACTOR 'iS RESPONSIBLE FOR THE STORAGE REFLECT THE SAME INFORMATION AS GOVERNING AGENCY APPROVED PLANS. THE CONTRACTOR OF ALL MATERIALS AND SHALL NOT DO SO ON PUBLIC PROPERTY WITHOUT A PERMIT TO DO SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD CONDITION, COMPLETE WITH ALL SO FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. REVISIONS, ADDENDA, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES UNDER THE DIRECT CARE OF THE SUPERINTENDENT. 39• GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM THE CONTRACTOR SHALL SUPPLY TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. WITH .REQUIREMENTS TO BE USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY SHOWN OTHERWISE. A COPY OF ALL REVISIONS, ADDENDA, AND/OR CHANGE ORDERS AT THE CONCLUSION OF THE WORK AS A PART OF THE AS -BUILT DRAWING RECORDS. 40. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR 16. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES OWN CUTTING, FITTING, PATCHING, ETC., SO AS TO BE RECEIVED PROPERLY BY THE WORK OF OTHER TRADES. ARE NOT TO BE ALTERED BY THIS CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. 41. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT PREMISES AND SHALL BE LEFT IN A CLEAN (BROOM FINISH) CONDITION AT 17. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL, MECHANICAL, AND PLUMBING PLANS ALL TIMES BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION OF THE WORK. AND CROSS CHECK THEIR DETAILS, NOTES, DIMENSIONS, AND ALL REQUIREMENTS PRIOR TO THE START OF ANY WORK. 42. TOWER NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, FIXTURES 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF AND/OR ANY EQUIPMENT NAMED BY A TRADE OR MANUFACTURER. GUARANTEE OR WARRANTY THAT MAY BE IN EFFECT IS DONE THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS UNTIL THE JOB IS COMPLETE. SO THROUGH THE COMPANY OR MANUFACTURER PROVIDING THE PRODUCT, FIXTURE, AND/OR EQUIPMENT ONLY: UNLESS SPECIFIC RESPONSIBILITY IS ALSO PROVIDED BY THE 19. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING CONTRACTOR/SUBCONTRACTOR IN WRITTEN FORM. UTILITIES WHETHER OR NOT SHOWN ON THE PLANS, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR, OR SUBCONTRACTOR 43. CAUTION! CALL BEFORE YOU DIG! BURIED UTILITIES EXIST IN THE AREA AS SPECIFIED IN THE AGREEMENT BETWEEN SUBCONTRACTOR AND CONTRACTOR, SHALL BEAR AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT THE ONE -CALL UTILITY THE EXPENSES OF REPAIR AND/OR REPLACEMENT OF UTILITIES OR OTHER LOCATE SERVICE A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION. 1-800-227-2600. PROPERTY DAMAGE BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. 44. CONTRACTOR TO REPLACE AND/OR REROUTE ANY EXISTING UNDERGROUND 20. THE REFERENCES ON THE DRAWINGS ARE FOR CONVENIENCE ONLY AND UTILITIES ENCOUNTERED DURING TRENCHING AND GENERAL CONSTRUCTION. SHALL NOT LIMIT THE APPLICATION OF ANY DRAWING OR DETAIL. 45. WHEN APPLICABLE, CONTRACTOR IS RESPONSIBLE TO CALL, COORDINATE AND 21. ALL DIMENSIONS ON THE PLANS ARE TO FACE OF STUD (F.O.S.) UNLESS MAKE ARRANGEMENTS FOR ROW AND/ OR PRIVATE PROPERTY LOCATE MODIFICATION CONSTRUCTION; BASED ON NOTED OTHERWISE (U.N.O.). SPECIFIC SITE REQUIREMENTS. 46. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION. 47. CONTRACTORS TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND SUBMIT TO TOWER NETWORK CARRIER ALONG WITH REDLINED CONSTRUCTION SET. 48. CONTRACTOR SHALL DOCUMENT ALL CHANGES MADE IN THE FIELD BY MARKING UP (REDLINING) THE APPROVED CONSTRUCTION SET AND SUBMITTING THE REDLINED ALONG WITH PHOTOGRAPHS PER NETWORK CARRIER REQUIREMENTS. 49. GENERAL CONTRACTOR IS TO WITH POWER COMPANY AS R INSTALLATION COORDINATION REPRESENTATIVE, PROJECT 0 50. ANY SUBSTITUTIONS OF MATI°. APPROVED BY TOWER NETWO 51. THE GENERAL CONTRACTOR �, ALL FAULTY, INFERIOR, AND/+ AND/OR FAULTY WORKMANSH COMPETE AND ACCEPTED UN( IN THE CONTRACT BETWEEN `I (EXCEPTION) THE ROOFING S( AGREEMENT FOR ALL WORK [ TO MAINTAIN THE ROOFING IN TWO (2) YEARS STARTING AF1 THE PROJECT, UNLESS OTHI�k OWNER AND THE CONTRACT01', 52. THE CONTRACTOR SHALL PRO OF THE OWNER'S EMPLOYEES, CONSTRUCTION OF THE PROJI 53. THE CONTRACTOR SHALL BE: I AND/OR FEES WITH RESPECT BUILDING PERMIT APPLICATION REPRESENTATIVE. CONTRACTO PAYMENT FOR SAID DOCUMEN] 54. NOT USED DORDINATE ALL POWER INSTALLATION JIRED. CONTRACTOR TO REPORT POWER LUTION(S) TO NETWORK CARRIER STRUCTION MANAGER AND ARCHITECT. ,LS AND/OR EQUIPMENT, MUST BE CARRIER CONSTRUCTION MANAGER. LL BE RESPONSIBLE FOR AND SHALL REMEDY IMPROPER MATERIALS, DAMAGED GOODS, FOR ONE (1) YEAR AFTER THE PROJECT IS THIS CONTRACT; UNLESS NOTED OTHERWISE OWNER AND THE CONTRACTOR. ;ONTRACTOR SHALL FURNISH A MAINTENANCE JE, COSIGNED BY THE GENERAL CONTRACTOR, WATERTIGHT CONDITION FOR A PERIOD OF THE DATE OF SUBSTANTIAL COMPLETION OF SE WRITTEN IN THE CONTRACT BETWEEN THE ►E ADEQUATE PROTECTION FOR THE SAFETY VORKMEN, AND ALL TIMES DURING THE )UIRED TO PAY FOR ALL NECESSARY PERMITS ) THE WORK TO COMPLETE THE PROJECT. SHALL BE FILED BY THE OWNER OR HIS SHALL OBTAIN PERMIT AND MAKE FINAL 55. TOWER NETWORK CARRIER WILL" ILL REVIEW AND APPROVE SHOP DRAWINGS AND SAMPLES FOR CONFORMANCE: WITH DESIGN CONCEPT. TOWER NETWORK CARRIER PROJECT APPROVAL OF A SEPARATE ITEM SH.AL:L. NOT INCLUDE APPROVAL OF AN ASSEMBLY IN, WHICH THE ITEM FUNCTIONS. 56. ALL ANTENNAS MOUNTED ON ROOF SUPPORT FRAMES TO BE PROVIDED BY TOWER NETWORK CARRIER COMMUNICATIONS. 57. CONTRACTOR TO PROVIDE TRI;NH AS REQUIRED TO INSTALL BOTH ELECTRICAL AND TELEPHONE UNDERGROUND CONDUITS (#40 PVC) PER S.C.E. WORKORDER. BACKFILL WITH CLEAN SAND AND COMPACT TO THE SATISFACTION OF THE DISTRK.'JS' INSPECTOR. REPLACE FINISH GRADE WITH MATCHING MATERIALS (GRASS, ASPHALT, CONCRETE, ETC.) 58. CONTRACTOR TO PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES FOR SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM HEAVY EQUIPMENT UTILIZED DURING CONSTRUCTION. 59. CONTRACTOR TO PATCH AND REPAIR ALL GROUND SURFACES WITHIN THE CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM SURFACE AND MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. 60. CONTRACTOR TO REPLACE LANDSCAPE VEGETATION THAT WAS DAMAGED DUE TO CONSTRUCTION, AND TO MODIFY REMAINING IRRIGATION LINES TO OPERATING CONDITION, PROVIDING FULL COVERAGE TO IMPACTED AREAS. 61. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS OCCUR, THE GENERAL CONTRACTOR SMALL COORDINATE WITH BUILDING OWNER AND BUILDING ROOFING CONTRACTOR OF RECORD FOR INSTALLATION, PATCH, REPAIR OR ANY AUGMENTATION TO THE ROOF, AND HAVE THE WORK GUARANTEED UNDER THE ROOFING CONTRACTOR'S WARRANTY FOR MOISTURE PENETRATION OR AND OTHER FUTURE BREACH OF ROOFING INTEGRITY. 62. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS WITHIN CONCEALED (SHROUDED) SUPPORT FRAMES OR TRIPODS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE FRP DESIGNER/FABRICATOR TO ENSURE THAT THE FINAL FRP SHROUD IS SIMULATING (IN` APPEARANCE) DESIGNATED EXISTING EXTERIOR BUILDING FACADE MATERIALS, TEXTURES, AND COLORS. THE CONTRACTOR SHALL FURTHERMORE ENSURE THE USE OF COUNTERSUNK FASTENERS IN ALL FRP CONSTRUCTION. WHEN PHOTOSIMULATIONS ARE PROVIDED, THE CONTRACTOR SHALL ENSURE THAT FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN PHOTOSIMULATION. SHOP DRAWINGS SHALL BE PROVIDED TO THE GENERAL CONTRACTOR, CONSTRUCTION COORDINATOR, AND ARCHITECT PRIOR TO FABRICATION AND CONSTRUCTION. 63. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE ANCHORING TO A CONCRETE ROOF SLAB IS PAC"I{;?ED, CONTRACTORS SHALLCONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING CONSTRUCTION COORDINATOR AND ARCHITECT THE PRESENCE` OF POST TENSION TENDONS WITHIN THE ROOF SLAB - RESULTING FROM AN UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING "AS -BUILT DRAWING SET" -- HAVING INDICATED AN ORIGINAL DESIGN SOLUTION OF REINFORCED CONCRETE W/ EMBEDDED STEEL REPAR. IN THE EVENT POST TENSION SLAB SOLUTION IS PRESENT, CONTRACTOR SHALL INCLUDE PROVISIONS FOR X-RAY PROCEDURES (INCLUDED IN BID) FOR ALL PENETRATION AREAS WHERE ANCHORING OCCURS. 64. GENERAL & SUB CONTRACTORS SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR ALL CABLE TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS (WHERE APPLICABLE). PLASTIC ZIP TIES SHALL NOT BE PERMITTED FOR USE ON TOWER NETWORK CARRIER PROJECTS. RECOMMENDED MANUFACTURE SHALL BE: PANDUIT CORP. METAL LOCKING TIES MODEL NO. MLT4S-CP UNDER SERIES-304 (OR EQUAL). PANDUIT PRODUCT DISTRIBUTED BY TRIARC. 65. NOT USED. THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION � . , I�, I�'� � _ DOCI AEI �S PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED SYMBOLS: } GRID REFERENCE x I DETAIL REFERENCE ELEVATION REFERENCE SECTION REFERENCE CENTERLINE PROPERTY/LEASE LINE MATCH LINE WORK ' POINT -- - ----- --- GROUND CONDUCTOR TELEPHONE CONDUIT --- ------- I- _----_._____ ELECTRICAL CONDUIT COAXIAL` CABLE I _......_.._. OVERHEAD SERVICE CONDUCTORS GROUT OR PLASTER (E) BRICK (E) MASONRY CONCRETE EARTH' ,_��4' '%` < « GRAVEL PLYWOOD I , SAND WOOD CONTINUOUS J WOOD BLOCKING STEEL t I' NEW -) EXISTING NEW ANTENNA EXISTING ANTENNA GROUND ROD GROUND BUS BAR MECHANICAL GRND. CONN, CADWELD ' GROUND` ACCESS WELL. } ELECTRIC BOX TELEPHONE BOX LIGHT POLE 0 FND. MONUMENT SPOT ELEVATION " SET POINT REVISION cAt&t Your world. Delivered. II'ACIFIC TELECOM SERVICES, LLC RICHAR w, B. HA4 STATE OF WAS F IG ' ON EXPIRATION DATE OF THE LICENSE: 08/20/13 C�e > 0 C� 00 C Q Q C) Q CD Iy Lo Li Q0 � W LL. SHEET TITLE GENERAL NOTES & SYMBOLS SHEET NUMBER G-1 A-ISTING TREE AREA' 7u ` EXISTING ,v,ks, BUILDING 7 EXISTING BUILDING AT&T PROPOSES TO MODIFY AN EXISTING UNSTAFFED TELECOM M U IN icATiONS FACILITY BY REMOVING (3) EXISTING H—FRAME ANTENNA MOUNTS AND RELOCATING (6) EXISTING ANTENNAS (2) PER SECTOR TO A NEW 6'-0- H—FRAME ANTENNA MOUNT �3� TOTAL (1) PER SECTOR WITH THE ADDITION OF (3) LTE PANEL ANTENNAS AND 3 TMAS. PLUS ADDITION OF (6) RRH UNITS, (6) DIPLEXERS MOUNTED TO A NEW H—FRAME WITHIN THE EXISTING AT&T EQUIPMENT VAULT (2) PER LTE PANEL ANTENNA, (1) GPS ANTENNA MOUNTED TO AN EXISTING H—FRAME AND (1) LTE EQUIPMENT RACK LOCATED WITHIN THE EXISTING AT&T EQUIPMENT VAULT-- & /loor z EXISTING BUILDING ` TREE AREA7 � � / ZEEX|STING � GRASSED AREA EXI, TIN TREE AR THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE, ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED M. NG North mbe determined by site survey (if possible). SUBJECT BOUNDARY LINE RIGHT—OF—WAY CENTERLINE RIGHT—OF—WAY LINE ADJACENT BOUNDARY LINE SECTIONAL BREAKDOWN LINE »: OVERHEAD POWER LINE «� BURIED POWER LINE BURIED GAS LINE un/ OFIT OVERHEAD TELEPHONE LINE ue BURIED TELEPHONE LINE W W W W BURIED WATER LINE SS SS SS BURIED SANITARY SEWER S» SD SD BURIED STORM DRAIN DITCH LINE/FLOW LINE ROCK RETAINING WALL VEGETATION LINE WOOD FENCE TRANSFORMER -9- FIRE HYDRANT LIGHT STANDARD N GATE VALVE POWER VAULT EB WATER METER UTILITY BOX FlRE STAND PIPE u//u// P 0 L E iJ CATCH BASIN, TYPE / �-- POLE WIRE @ CATCH BASIN, TYPE || W GAS VALVE �1 SIGN rOl GAS METER �l « BOLLARD [�l TELEPHONE VAULT o MAIL BOX o ' TELEPHONE RISER SP01" 1-LEVA7|UN PROPOSED AT&T ANTENNA MOUNT, LTE ANTENNAS AND ALL MOUNTING HARDWARE, TO BE PAINTED TO MATCH EXISTING 'SITE CONDITIONS PARCEL NUMBER (S): 192104-9003-08 LEGAL DESCRIPTION: 459.69 FT TO TOP OF' BANK OF EXISTING STORM DRAINAGE CHANNEL ESMT LY WLY OF SW CAMPUS DR IN NE 1/4 OF SD SEC TGW NWLY 262.5 FT OF SD BONN TRANS LN ESMT—L4 WITHIN SE 1/4 OF NW VICINITY MAP OVER-ALL SITE PLAN Iff XSIG BIDN at&t Your world. Delivered PACIFIC TELECOM SERVICES, REVISIONS NO. DATE DESCRIPTION INITIAL 0 110/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE OVERALL SITE PLAN EXISTING ROAD ' EXISTING GRASSED AREA EXISTING UTILITY R/W z EXISTING OVERHEAD EXISTING ROAD (XIST<'� ING E GRASSED AREA < < < E F F E "`^� ��a a < 1&2 1&2 POWER LINES -3 �A-4ca `�~�. / �a a 11,E -rAE7rt7 TELECOMMUNICATIONS FACILITY AT&T PROPOSES TO MODIFY AN EXISTINGVINO IJ BY REMOVING (3) EXISTING H-FRAME ANTENNA MOUNTS AND RELOCATING (6) EXISTING ANTENNAS (2) PER SECTOR TO A NEW 6'-0- H-FRAME ANTENNA MOUNT �3� TOTAL (1) PER SECTOR WITH THE ADDITION OF (3) LTE PANEL ANTENNAS AND 3 TMA'S. PLUS ADDITION OF (6) RRH UNITS, (6) DIPLEXERS MOUNTED TO A NEW H-FRAME WITHIN THE EXISTING AT&T EQUIPMENT VAULT (2) PER LTE PANEL ANTENNA, (1) GPS ANTENNA MOUNTED TO AN EXISTING H-FRAME AND (1) LTE EQUIPMENT RACK LOCATED WITHIN THE EXISTING AT&T EQUIPMENT VAULT EXISTING 1015'-0" BPA TOWSW'� 0 24"x36" SCALE: 1" = 30'-0 11"X17" SCALE: 1" = 60' -0» 30' 150" 30' THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED a \-2�1 IC7 North to be determined by site survey (if possible). SITE PLAN I I at&t Your world. Delivere; EXPIRATION DATE OF THE LICENSE 08/20/13 REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE I SITE PLAN I SHEET NUMBER A-2- EXISTING AT&T ACCESS HATCH TO U.G. VAULT EXISTING ROAD EXISTING GROUND VAULT I M, 4'-0" WIDE INA MOUNT TO 4D REPLACED ANTENNA TYP. OF-3, R) TO REMAIN EXISTING AT&T GSM CABINETS '(TYP. OF 2) EXISTING PDU CABINET - EXISTING AT&T BATTERY BAY (TYP. OF 2) EXISTING AT&T CABLE PORTS EXISTING EQUIPME �V:)' I North to be determined by site survey (if possible). 24"x36" SCALE: 1/4" = 1'_0" 24"x36" SCALE: 1/2" = 1'-0' 11"x17" SCALE: 1/8" = V-0" 4' 3' 2' 1 0" 40 EXISTING ENLARGEDCOMPOUND PLAN 2 1 ,,x 17" SCALE: 1/4" = 1'-0"... 2' 11 Otl 2' THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. 'S IS, .J w 4" M EXISTING ACCESS HATCH WITH ACCESS LADDER EXISTING AT&T UMTS CABINETS EXISTING NORTEL EQUIPMENTS TO BE REMOVED North to be determined by site survey (if possible). EXISTING ENLAR-GED EOUIPMENT PLAN I EXPIRATION DATE OF THE LICENSE: 08/20/13 Li 0 > 0 00 0') U) < :D n < _j V) < 0 Li U-) aco Iii LL_ REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE EXISTING ENLARGED COMPOUND PLAN I & EQUIPMENT PLAN I SHEET NUMBER 4 PROPOSED AT&T LTE PANEL ANTENNA MOUNTED F� TO PROPOSED 6'--0" WIDE H-FRAME ANTENNA MOUNT (TYP. OF 3, (1) PER SECTOR) RELOCATED EXISTING AT&T UMTS PANEL ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED AT PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT RELOCATED EXISTING AT&T GSM PANEL ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED AT PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT \ \\\\\` PROPOSED 1--5/8' COAX 5 CABLES (6) TOTAL, ROUTED WITHIN (2) PROPOSED 6" U. F- CONDUITS, ROUTED ADJACEN' To EXISTING U.G. CONDUITS PROPOSED AT&T (2) 6" DIA. CONDUIT STUB -UPS AT BPA TOWER LEG EXISTING AT&T 4" CONDUIT STUB -UPS (12 TOTAL-(4) SPARE) AT BASE OF EXISTING / BPA TOWER LEG - EXISTING 105'-0" BPA TOWER NOTE: PROPOSED AT&T ANTENNA MOUNT, LTE ANTENNAS AND ALL MOUNTING HARDWARE, TO BE PAINTED TO MATCH EXISTING SITE CONDITIONS PROPOSED AT&T GPS ANTENNA MOUNTED TO AN F_ EXISTING UTILITY RACK EXISTING AT&T ACCESS HATCH TO U.G. VAULT PROPOSED 1-5/8' COAX CABLES (6) TOTAL, ROUTED WITHIN (2) PROPOSED 6" U.G. CONDUITS, ROUTED ADJACENT TO EXISTING U.G. CONDUITS EXISTING ROAD EXISTING GROUND VAULT EXISTING OVERHEAD POWER LINES r----- PROPOSED AT&T 6'-0" 3 WIDE ANTENNA H-FRAME A-7 MOUNT (3) TOTAL, (1) PER SECTOR ,- - EXISTING AT&T ANTENNA FLUSH MOUNT (TYP. OF 3, (1) PER SECTOR) TO REMAIN PROPOSED AT&T TMA'S (3) TOTAL (1) PER LTE ANTENNA 7 F- EXISTING AT&T GSM CABINETS (TYP. OF 2) EXISTING PDU CABINET EXISTING AT&T BATTERY BAY (TYP. OF 2) EXISTING AT&T CABLE PORTS,---7,,,,, �i r � , EXISTING AT&T 15 EQUIPMENT RACKS z�� rQ) P, 1-5/8' COAX (6) TOTAL EXISTING OVERHEAD POWER LINES North to be determined by site survey (if possible). 24"x36" SCALE: 1/4" = 1'-0" 24"x36" SCALE: 1/2" = 1'_0" 11"x17" SCALE: 1/8" = 1'-0" 4' 3' 2' 1' 0" 4' PfWPCOSED ENLARGED COMPOUND PLAN 2 11"x17' SCALE: 1/4" = 1'-0" THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. 2' 1 1 0 )s 21 r � �S' 0 0 EXISTING ACCESS HATCH WITH ACCESS LADDER - I1 EXISTING AT&T UMTS CABINETS PROPOSED AT&T LTE EQUIPMENT PROPOSED 1 INDOOR EQUIPMENT — PROPOSED AT&T 70OMHz RRH UNITS MOUNTED NEW H-FRAME P ■ P SECTOR) PROPOSED UNIT MOUNTED SECTOR)PER UNIT MOUNTED • OF SECTOR)PER North to be determined by site survey (if possible), *�HOMES at&t Your t • Delivered. <"�a A n, A -4- ... PACIFIC TELECOM SERVICES, LLC 882 EGISTERED A "°HITECT RICHARD HALL STATE OF WASHIiIIIi EXPIRATION DATE OF THE LICENSE: 08/20/13 7 0 00 �vl Q Q rz C / c W LL REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE PROPOSED ENLARGED COMPOUND PLAN & EQUIPMENT PLAN 1u°�' � r� PACIFIC TELECOM SERVICES, LLC 8828 EGISTERED ARPHITEC RICHARD B-'HA r STATE OF WASHINGTON EXPIRATION DATE OF THE LICENSE: 08120/13 W O 5 00 C)' 0") f/7 Q Q U) _J Q 0 LY_ If)W Q0 d W L� REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE EXISTING SOUTHWEST ELEVATION SHEET NUMBER MR NOTE: PROPOSED AT&T ANTENNA MOUNT, LTE ANTENNAS AND ALL MOUNTING HARDWARE, TO BE PAINTED TO MATCH EXISTING SITE CONDITIONS EXISTING AT&T ACCESS HATCH WITH ACCESS LADDER - - 6 PROPOSED AT&T GPS F_ ANTENNA MOUNTED AT EXISTING UTILITY RACK EXISTING AT&T GPS ANTENNA MOUNTED AT EXISTING UTILITY RACK EXISTING BOLLARD (TYP) PROPOSED AT&T LTE 1 EQUIPMENT MOUNTED A-7 INSIDE AN EXISTING VAULT ON A PROPOSED INDOOR EQUIPMENT RACK EXISTING AT&T EQUIPMENT RACKS ----� EXISTING AT&T GSM CABINETS (TYP. OF 2) RELOCATED EXISTING AT&T GSM PANEL ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED TO PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT RELOCATED EXISTING AT&T UMTS PANEL ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED TO PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT 4 PROPOSED AT&T LTE PANEL ANTENNA MOUNTED TO PROPOSED 6'-0" WIDE F H-FRAME (TYP. OF 3, (1) PER SECTOR) 3 PROPOSED AT&T 6'-0" WIDE ANTENNA H-FRAME MOUNT (3) TOTAL, (1) PER SECTOR ---- EXISTING 105'-0" BPA TOWER-M.,..... PROPOSED 1-5/8' COAX CABLES (6) TOTAL, ROUTED ADJACENT TO EXISTING COAX CABLE ROUTE w (� EXISTING GROUND VAU LT ��--- EXISTING AT&T PREFABRICATED EQUIPMENT VAULT PROPOSED AT&TEXISTING AT&T BATTERY I\--jr-rh I 70OMHz RRH 3 ---- - UNITS MOUNTED AT EQUIPMENT BAY (TYP. OF 2) (II !i 11 VAULT WALL (TYP. OF 3, (1) F- PER SECTOR) [ PROPOSED AT&T AWS RRH 2 UNIT MOUNTED AT EQUIPMENT VAULT WALL (TYP. OF 3, (1) F- ��` PER SECTOR) 24"x36" SCALE: 3/16" = 1'-0" _ 1 1 "x17" SCALE: 3/32" = 1'-0" 42 04' THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO OARR�ER SERVi ES i'S SfIRiCTLY PROHI KITED. w 0 F_ m m Z M- 0 < w z `� I `� 0 Z z F_ LLJ z F_ F_x ¢ ¢ mw U- 0 C] Ch N 0 0 O n F_ (V 0 m 1 w cn n CL h a- W u_ 0 0 F cn Hui z F_ z w 0 w v < 0 EXISTING TREES ! . M nuiw�murnrrrr PACIFIC ` TELECOM SERVICES, LLC 88.2t , REGISTERED ARCHITECT " RIICHARD Ba,F HAL. +' STATE OF WASHING - EXPIRATION DATE OF THE LICENSE: 08/20/13 on > Q Iy 00 © C') V) n �< Q C l� 3�: V) < a Iy 0 w d QD LLI LL REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE PROPOSED SOUTHWEST ELEVATION 1 9/ 16" !W1 rc2", ginis SECTION B / A� 3'-3" I e 3$-3" ELEVATION GENERAL NOTES: 1. MATERIALS AND FABRICATION SHALL CONFORM TO PG&E ENGINEERING STANDARD SPEC NO. 30, LATEST REVISION. 2. PIPES SHALL BE 2" 0 STANDARD (SCHEDULE 40, 2 3/8 O.D.) GALVANIZED. ANGLES AND PLATES SHALL BE ASTM A36. 3. BOLTS SHALL BE 1 /2" 0 A325 WITH HEAVY HEX NUTS, GALVANIZED AND HOLES SHALL BE 9/16"0. 4. ALL STEEL SHALL BE GALVANIZED AFTER FABRICATION. 5. FIELD DRILLED HOLES AND DAMAGED AREAS SHALL BE RETOUGHED WITH PG&E NO. 56 ZINC PRIMER OR APPROVED EQUAL. RRU AWS /T.✓n nr z\ I L2x2x3/16"x3'-6" LONG, TYP. PIPE 2" 0 S1 (2 3/8" OD LENGTH VAR SECTION A ANTENNA H--FRAME DETAILS 24"x36" SCALE: 1 "=1-0" [ 3 11„x17„ 5,f;Al F- 1 /9„=1,-O„ F .TRUT U—BOLTW ` p PIPE, M • PIPE -MOUNTED UNISTRUT PER UFACTURER, TYP 70OMHz (TYP OF 3) RRH AND DIPLEXE UNIT H-FRAME MOUNTING 24"x36" SCALE: 3/4" = 1'-0" 2 11"x17" SCALE: 3 8" = 1'-0" THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED TOP CONNECTION IS NOT REQUIRED WHERE TOTAL EQUIPMENT WEIGHT IS LESS THAN 800 LBS DC POWER ®-- [EMPTY] DC/DC CONVERTER - - -. RAYCAP SURGE -- -- ALU/BBU (9926)-- -- FIBER CABLE ENCLOSURE FUTURE ALU/BBU TELCO V CABINET LAYOUT DIAGRAM STANDARD 19"/23" INDOOR RACK (VERIFY) 1 /2" DIA HILTI KWIK BOLT TZ W/ 2" MIN. EMBED INTO CONCRETE ROOF/FLOOR. USE 1/2"DIA X 6" LONG LAG CREWS INTO WOOD ROOF/FLOOR MEMBERS/BLOCKING SEE DETAIL 4, THIS SHEET SEE DETAIL 2, THIS SHEET SEE DETAIL 3, THIS SHEET MAKE: MID ATLANTIC PRODUCTS INC.I MODEL: RL10-45 HEIGHT: 84.00" TOP WIDTH: 5.50" FRONT WIDTH: EXTERIOR 19.62" INTERIOR 17.79" SIDE WIDTH: 3.00" LEG WIDTH: 6.00" EA. SIDE WEIGHT: 40 LBS MAX CAPACITY: 1600 LBS LTE E UIPMET RACK DETAILS 24"x36" SCALE: NOT TO SCALE 1 1 ",,1 -7„ CY'AI C. t`InT Tn CnAI C- at&t Your r • Delivered.!! ITS PACIFIC TELECOM SERVICES, LLC REGISTERED IT RIGHARD B. HA STATE OF WASHIN ON EXPIRATION DATE OF THE LICENSE: 08120/13 L1J 0 > 00 t� C3) �< < d d 0 LIJ In n cc> LaJ REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE EQUIPMENT DETAILS SHEET NUMBER A-7 PROPOSED COAXCONFIGURATION AND SCHEDULE SECTOR ALPHA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT RET TMA NUMBER OF COAX COAX COAX LENGTH DIPLEXED GSM 850 85" 74'-0" 1 KATHREIN 742-264 8° 0° TBD NONE 2 7/8" 120'-0" YES GSM 1900 74 -0 4° 0° TBD ETB19G8-12UB 2 7/8 160, -0,1G8-G9) UMTS 850 85° 74'-0" 1 KATHREIN 742-264. 8° 01 TBD NONE 2 7/8" 160'-0" YES (U8-U9 ) UMTS 1900 74 -0„ 4" 01 TBD LGP 21401 2 7/8 160 -0„ LTE 85° 73'-2" 1 KMW 10, 2° TBD TTAW-07BP1 11-001 2 1-5/8" 160'-0" L7 SECTOR BETA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX COAX COAX LENGTH DIPLEXED GSM 850 225° 74'-0" 1 KATHREIN 742-264 7° 0' TBD NONE 2 7/8" 120'-0" YES G8-G9) GSM 1900 , „ 74 -0 3° 0° TBD ETB19G8-12UB 2 7/8 >} 156 -0 UMTS 850 225° 74'-0" 1 KATHREIN 742-264 7" 0° TBD NONE 2 7/8" 156'-0" YES U8-U9 ( ) UMTS 1900 , „ 74 -0 3° 0° TBD LGP 21401 2 „ 7/8 156 -0 LTE 215' 73'-2" 1 KMW - - - 0° 0° TBD TTAW-07BP1 1 1-001 2 1-5/8" 156'-0" L7 SECTOR GAMMA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT RET TMA NUMBER OF COAX COAX COAX LENGTH DIPLEXED GSM 850 315° 74'-0" 1 KATHREIN 742-264 7° 0° TBD NONE 2 7/8" 120'-0" YES (G8-G9) GSM 1900 74'-0„ 3° 01 TBD ETB19G8-12UB 2 7/8" 156'-0" UMTS 850 315° 74'-0" 1 KATHREIN 742-264 7° 0° TBD NONE 2 7/8" 156'-0" YES ( ) UMTS 1900 74 -O„ 3° 01 TBD LGP 21401 2 7/8„ 156'U8-U9 -0 LTE 315" 73'-2" 1 KMW 7° 2° TBD TTAW-07BP1 1 1-001 2 1-5/8" 156'-0" L7 EXISTING COAX CONFIGURATION AND SCHEDULE SECTOR ALPHA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT RET TMA NUMBER OF COAX COAX COAX LENGTH DIPLEXED GSM 850 85° 74'-0" 1 KATHREIN 742-264 8° 0° TBD NONE 2 7/8" 120'-0" YES (G8-G9) GSM 1900 74'-0" 4° 0° TBD ETB19G8-12UB 2 7/8" 160'-0" UMTS 850 85` 74'-0" 1 KATHREIN 742-264 8' 0" TBD NONE 2 7/8" 160'-0" YES (U8-U9) UMTS 1900 74'-0" 4° 0" TBD LGP 21401 2 7/8" 160'-0" SECTOR BETA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT TMA NUMBER OF COAX COAX COAX LENGTH DIPLEXED GSM 850 225° 74'-0" 1 KATHREIN 742-264 7° 01 TBD NONE 2 7/8" 120'-0" YES (G8-G9 ) GSM 1900 74 -0 3° 9TBD ETB19G8-12UB 2 7/8 156R -0tf UMTS 850 225° 74'-0" 1 KATHREIN 742-264 7° 01 TBD NONE 2 7/8" 156'-0" YES U8-U9 ( ) UMTS 1900 74 -O„ 3' 01 TBD LGP 21401 2 7/8„ 156 -0>� SECTOR GAMMA AZIMUTH RADCENTER NUMBER OF ANTENNAS VENDOR MODEL ELEC. TILT MECH. TILT RET TMA NUMBER OF COAX COAX � COAX LENGTH DIPLEXED GSM 850 315° 74'-O» 1 KATHREIN 742-264 7° 0° TBD NONE 2 7/8„ 120'-0" YES (G8-G9) GSM 1900 74'-0" 3° 01 TBD ETB19G8-12UB 2 7/8" 156,-0,, UMTS 850 315° 74'-O" 1 KATHREIN 742-264 7" 0° TBD NONE 2 7/8" YES U8-U9 ( ) UMTS UMTS 1900 , „ 74 -0 3° 0° TBD LGP 21401 2 :� 7/8 , „ 156 -0 NOTES: * DO NOT USE COAX LENGTHS FOR CUT LENGTHS: ESTIMATES ONLY * CONFIRM THAT GENERAL CONTRACTOR IS USING LATEST VERSION OF RFDS. PROPOSED AT&T LTE PANEL ANTENNA MOUNTED TO PROPOSED 6'-0" WIDE H-FRAME (TYP. OF 3, (1) PER SECTOR) S t� RELOCATED EXISTING AT&T UMTS PANEL �} � EXISTING AT&T UMTS PANEL ANTENNA (TYP. OF 3, (1) PER, ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED TO PROPOSED EXISTING AT&TECTOR) M MOUNTED AT EXISTING 6'-0" WIDE H-FRAME ANTENNA MOUNT �'i,> yJ PANEL ANTENNA (TYP OF 3, () ANTENNA MOUNT TO BE RELOCATED PER SECTOR) MOUNTED TO PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT 0 RELOCATED EXISTING AT&T GSM PANEL EXISTING AT&T GSM PANEL ANTENNA .'s, ANTENNA (TYP. OF 3, (1) PER (TYP. OF 3, (1) PER SECTOR) SECTOR) MOUNTED AT PROPOSED MOUNTED AT EXISTING ANTENNA 6'-0" WIDE H-FRAME ANTENNA MOUNT MOUNT TO BE RELOCATED j SECTOR "ALPHA' --RELOCATED EXISTING AT&T GSM AT&T 85° AZIMUTH PANEL ANTENNA (TYP. OF 3, (1) ° PER SECTOR) MOUNTED TO � / PROPOSED 6'-0" WIDE H-FRAME \'\—EXISTING '- ANTENNA MOUNT a 0 AT&T UMTS PANEL "ALPHA" ANTENNA (TYP. OF 3, (1) PER PROPOSED AT&T TMA'S (3) SECTOR $6° AZIMUTH SECTOR) MOUNTED AT EXISTING TOTAL (1) PER LTE ANTENNA p;TBtT ANTENNA MOUNT TO BE RELOCATED EXISTING AT&T GSM PANEL ANTENNA (1) PER PROPOSED AT&T LTE PANEL ANTENNA MOUNTED AT EXISTING ANTENNA MOUNTED TO PROPOSED 6'-0" WIDE MOUNT TO BE RELOCATED H-FRAME (TYP. OF 3, (1) PER SECTOR), EXISTING AT&T UMTS PANEL PROPOSED AT&T 6'-0" WIDE PROPOSED AT&T LTE PANEL ANTENNA ANTENNA (TYP. OF 3, (1) PER ANTENNA H-FRAME MOUNT MOUNTED TO PROPOSED 6'-0" WIDE SECTOR) MOUNTED AT EXISTING (3) TOTAL, (1) PER SECTOR H-FRAME ANTENNA MOUNT (TYP. OF ANTENNA MOUNT TO BE RELOCATED 3, (1) PER SECTOR) RELOCATED EXISTING AT&T UMTS EXISTING AT&T 4'-0" WIDE PANEL ANTENNA (TYP. OF 3, (1) PER PROPOSED AT&T TMA'S (3) TOTAL H-FRAME ANTENNA MOUNT TO SECTOR) MOUNTED TO PROPOSED (1) PER LTE ANTENNA BE REMOVED AND REPLACED 6'-0" WIDE H-FRAME ANTENNA MOUNT EXISTING AT&T GSM PANEL ANTENNA (TYP. OF 3, (1) PER rO��J SECTOR) MOUNTED AT EXISTING RELOCATED EXISTING AT&T GSM PANEL 4 ° p � ANTENNA MOUNT TO BE RELOCATED ANTENNA (TYP. OF 3, (1) PER SECTOR) MOUNTED TO PROPOSED 6'-0" WIDE H-FRAME ANTENNA MOUNT North to be determined by site survey (if possible). North to be determined by site survey (if possible). 24"x36" SCALE: 1 /2" = 1'-0" PROPOSED ANTENNA CONFIGURATION 24"x36" SCALE: 1 /2" = V-0" EXISTING ANTENNA CONFIGURATION 11"x17" SCALE: 1/4" = V-0" 2' 1' 0" 2' 11"07" SCALE: 1/4" = 1'-0" 2' 1' 0" 2' at&t Your world. Delivered. PACIFIC TELECOM SERVICES, LLC REGISTERED ' A ' HITTT R1CHAR6,Ja.,,_KA L r` STATE OF WASHINGTON EXPIRATION DATE OF THE LICENSE: 08/20/13 r� 00 V7 Q U < O LAJ ry In 0 I w L� REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE ANTENNA CONFIGURATIONS SHEET NUMBER i THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. MECHANICAL SPECIFICATIONS: DIPLEX FILTER FOR 0 MHZ AND AWS/PCS WITH DC AUTO SENSE MODEL NUMBER: CM1007-DBPXBC DIMENSIONS: 4.92%8.96"x3.27" (125x227.5x83mm) WEIGHT 6.5 Ibs 3.0 K AT&T GPS ANTENNA BACKFILL (SAND OR NATIVE FINISHED GRADE OR PAVING. 1 7/8" O.D. PIPE SOIL) PER ASTM STANDARDS MATCH SLOPE AND THICKNESS OF EXISTING CONDITIONS UNDISTURBED SOIL 6.7>, o 4.92" 3.27" iv SITE PRO 1 PIPE TO PIPE CLAMP SET_ E v j=�) COMPACTED 1 (PART# ACP08K) : _ _^BACKFILL WITH --�� SATISFACTORY NATIVE OR IMPORTED SOIL Nk .� UTILITY WARNING TAPE co 0)_-__ --_ �� (I � � -�I -Ill- NOTES: 1. LOCATION OF ANTENNA MUST HAVE CLEAR VIEW OF 6"0 CONDUIT CANNOT � � ��- HAVE � --s �, -, � ��� 6"� CONDUIT SOUTHERN SKY AND l.iF'ti°dN HAVE Al�i��l SLO'�. KA E� © EXCEEDING 25% OF THE SURFACE AREA OF A HEMISPHERE AROUND THE GPS ANTENNA. 6" MIN. (TYP.) 4" MIN TO SECONDARY ELECTRIC 2. ALL GPS ANTENNA LOCATIONS MUST BE ABLE TO RECEIVE CLEAR SIGNALS FROM A MINIMUM OF 12" MIN TO PRIMARY ELECTRIC 5.4" FOUR (4) SATELLITES. VERIFY WITH HANDHELD GPS NOTE: . BEFORE FINAL LOCATION OF CPS ANTENNA. SEPARATION DIMENSION TO BE VERIFIED WITH LOCAL UTILITY COMPANY REQUIREMENTS. IDLE E DETAIL 4LTE TIVIA DETAIL CPS MOUNTING DETAIL U. C. CONDUIT TRENCH DETAIL 24"x36" SCALE: 3" = 1'-0" 24»x36" SCALE: 3"=1'-0" 24»x36» SCALE: 1 "=1'-0" , „ >, „ , >, „ >, „ 24"x36" SCALE: NOT TO SCALE 5 1 1 'x 17 SCALE: 1 1 2 = 1 '-0 1 1 x 17 SCALE: 6 =1 -O 1 1 'x 1 % `3 AI k:: 1 2 =1 ? 1 1 "x 17" SCALE: NOT TO SCALE NOTE: NOTE: RRH'S TO BE MOUNTED PER RRH'S TO BE MOUNTED PER MANUFACTURE SPECIFICATOINS MANUFACTURE SPECIFICATOINS MECLIANIC4 ISI i DOWN I I _1 i ce : cry r BRACKETmm 11.8 5.9, FRONT 1 SOLAR 1I�:I1:,EICFIt.:. oar SHIELD-- TOP MANUFACTURER: KMW COMMUNICATIONS MODEL: AM-X-CD-16-65-OOT-RET (72") WEIGHT: 48.5 LBS DIMENSIONS: 1 1.8" X 5.9" X 72.0" 12.2" FREQUENCY: REFER TO RF DATA SHEET bQ 11.8 11.8 RRH MOUNTING BRACKETSot i I; I ci r - 0 4 G � f Ep t 7i it I cv 0 MANUFACTURER: ALCATEL-LUCENT TOP BOTTOM MODEL: 9442 RRH 70OMHz_15.5 (Lower Band) I � ISO VIEW RE CONNECTOR, TYP - HEIGHT: 21 _. WIDTH: 12.2"�� I�fiII REMOTE ELECTRICAL_ 1,I (x I Ct " DEPTH: 10.8„ DOWNTILT ACTUATOR, GYP WEIGHT: 51 LBS ' I MANUFACTURER: ALCATEL-LUCENT I� I I MODEL: 9442 RRH AWS �c► e „ HEIGHT: 24.4 FRONT WIDTH: 10.6" DEPTH: 6.7" WEIGHT: 43 LBS FRONT SIDE KMW ANTENNA SPECIFICATIONS RRH 70OMHZ DETAIL RRH AWS DETAIL NOT USED „ , » „4 „ „ » , „[3 ,> , " » „ 1 1 x36 ' SCALE: 3/4 =1 '-0 1 1 x 17 SCALE: i 1 /2 =1 -0 24 x36' SCALE: 1 1 /2 =1:-0:: 24 x36 SCALE: NOT TO SCALE 1 1 "x 17" SCALE:: 3 8"=1 ' -O» 1 1 "x 17" SCALE: 3 4"=1 ' -O" >, >, "= - 1 1 "x17" SCALE: NOT TO SCALE THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. MECHANICAL SPECIFICATIONS: TMA TWIN DUAL BAND AWS MODEL NUMBER: TTAW-07BP111-001 DIMENSIONS: 9.9"x6.7"x5.4" (250x169x139mm) WEIGHT <18 Ibs (8 Kg) at&t Your r, • Deliveref PACIFIC TELECOM SERVICES, LLC EGISTERED r A HITECT„ ICHARU P. HA STATE OF WASIII`CG ON EXPIRATION DATE OF THE LICENSE: 08/20/13 > 000 00 U? Q CL <1 J- U � Q U ry Ltd W c.Q W L.� REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE RF DETAILS SHEET NUMBER l • Your o• Delivered.i +war 1AiAlAAIIIII��111A� I i"ACIFIC TELECOM SERVICES, LLC 8828 REGISTERED ARCHITECT Ft[CHAR D'B-HALL STATE OF WASHINGTON EXPIRATION DATE OF THE LICENSE: 08120(13 w a 0000 U) ,<C 7 < d V SS a � � w QO w L� REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE SCHEMATIC GROUNDING PLAN SHEET NUMBER NOT USED NOT USED 24"x36" SCALE: NOT TO SCALE 1 NOT USED NOT USE D 1 1 "x 17" SCALE: NOT TO SCALE 24"x36" SCALE: NOT TO SCALE t 24"x36" SCALE: NOT TO SCALE13 :� �� 1 1 "x 17" SCALE: NOT TO SCALE 11 x 17 SCALE: NOT TO SCALE 24 x36 SCALE: NOT TO SCALE 12 11"x17" SCALE: NOT TO SCALE - NEW COAXIAL GROUND KITS W/ LONG BARREL NOTE: COAT ALL MECHANICAL CONNECTIONS COMPRESSION DOUBLE LUGS, ATTACH TO WITH "NOOX" OR APPROVED EQUAL GROUND BAR & INSTALL BY ANTENNA CONTRACTOR (CADWELD TYPE-GL) 0 NEW 4"x 24"x 1 /4" thk COPPER GROUND BAR. INSTALLED BY GENERAL CONTRACTOR 00000 0 000000000000 ac 00 0 a O O a a a O a a Oaa a aa0000 000000 Loj UNDER CONDITIONS WHF:;N GROUNDING IS 24" ca 0 ELECTRICALLY BONDED DIRECTLY TO METAL TOWER/MONOPOLE STRUCTURE, BASE OF FIELD VERIFY TOWER BUS BARS SHALL BE REMOVED W/ (2) #6 AWS GROUND LEADS BEING CAL} WELDED DIRECTLY TO THE TOW[R AND - CONTINUING TO BURIED GROUND CLING WITHIN � ~~ � #2 SOLID BARE TINNED COPPER NOT U S I D NOT USED UNDERGROUND TRENCH WIRE CADWELD (TYPE-GL) GROUND EAR 24"x36" SCALE: NOT TO SCALE 24"x36 SCALE: NOT TO SCALE 1 1 "x 17" SCALE: NOT "I 0 SCALE 1 1 "x 17" SCALE: NOT TO SCALE 24 Yx36» ? SCALE: NOT TO SCALE TO ANTENNAS #6 AWG FROM ANTENNA 11 x17 SCALE: NOT TO SCALE CABLE GROUND KIT - 04(TYPICALLY) ANTENNA CABLE 12" TO 24" COPPER GROUND _ cs RX2 TX1 f RX1 WEATHERPROOFING BAR ON WALL, ICE BRIDGE, FLOOR OR - - KIT (TER ON ANTENNA TOWER WEATHERPROOFING KIT COAX JUMPER EXISTING ISOLATORS _._.._ r.. __..u.w " .._____ _..__..�..". ,�t SEE NOTE 3 (TYP.) GROUND KIT (TYP.) ( ) SHALL BE REMOVED WHEN GROUND BAR � O a a CAE�L E GRC�tJNI� KI'I" n..,...v- ,,.- .,w ,,..., , _ .,, .,. ,rr..,.,, ., .r., .,. CONNECTOR IS ELECTRICALLY WEATHERPROOFING #6AWG BONDED TO METALU0 /�#6 AWG STRANDED COPPER KIT (TYP.) SEE NOTE 2 TOWER/MONOPOLE �=/ GROUND WIRE (GROUNDED TOCOPPER ANTENNA GROUND STRUCTUREGROUND BAR). SEE. NOTE 1 & 2 - ".- �„.•-�. BAR, WITH INSULATORS. BONDED DIRECTLY TO TOP OF ._. � CABLE CONNECTOR *TWO HOLE LUG, OR LIGHT POLE OR UTILITY POLE EXOTHERMIC WELD TO BE NOTES: ANTENNA CABLE "► 1. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECT GROUND WIRE TO BTS EQUIPMENT (TYP.) USED WITH #2 AWG BCW TO `�--GROUND CONDUCTOR SHALL DOWN TO GROUND BAR. BUILDING SERVICE GROUND OR GROUND RING BE ELIMINATED WHEN GROUND BAR IS 2. GROUNDING KIT :SHALL BE TYPE AND PART NUMBER AS SUPPLIED OR RECOMMENDED NOTES: TO GROUND RING NOTE: ELECTRICALLY BONDED TO BY CABLE MANUFACTURER. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECT GROUND WIRE METAL TOWER/LIGHT POLE DOWN TO ANTENNA GROUND BAR. GROUND BARS AT BOTTOM OF TOWERS/LIGHT POLES STRUCTURE 3. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT, COLD SHRINK SHALL NOT BE USED. SHALL ONLY USE EXOTHERMIC WELDS. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT. COLD SHRINK SHALL NOT BE USED. NOT USED GROUND WIRE INSTALLATION CABLE GROUND KIT 24"x36" SCALE: NOT TO SCALEF » » CONNECTION 6GROUND CABLE CONNECTION 24 x36 SCALE: NOT TO SCALE 24"x36" SCALE: NOT TO SCALE 24"x36 SCALE: NOT TO SCALE 11"x17" SCALE: NOT TO SCALE 11 "x17" SCALE: NOT TO SCALE 11x17 SCALE: NOT TO SCALE 11 N17 SCALE: NOT TO SCALE TYPE TA TYPE VN TYPE NC TYPE SS TYPE VV TYPE VS TYPE VB TYPE PT Q b F14 44 TYPE GI TYPE GY TYPE GR TYPE GL NOT USE NOT USED CADWELD GROUNDING CO 43NNECTIONS NOT USED 1 1 N17" SCALE. NOT TO SCALE 24"x36" SCALE: NOT TO SCALE 24"x36" SCALE: NOT TO SCALE , 1 1 "x 17" SCALE: NOT TO SCALE 1 1 "x 17" SCALE: NOT TO SCALE 11 11 x 17 SCALE: NOT TO SCALE 24 ,x36 SCALE: NOT TO SCALE THE INFORMATION CONTAINED !N THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. 11 x17 SCALE: NOTTO, SCALE at&t Your world. Delivered.:, ,4 PACIFIC TELECOM SERVICES, LLC EGISTERED ARCHITECT RICHARD E1,...1 L STATE OF WASHINGTON EXPIRATION DATE OF THE LICENSE: 08/20/13 > 0 ry 00 to n, < d U7 Q ry L0 W Q0 a W L� REVISIONS NO. DATE DESCRIPTION INITIAL A 10/15/2011 ISSUED FOR PCD REVIEW JA 0 10/20/2011 ISSUED FOR FINAL CONSTRUCTION RC 1 03/22/2012 REVISED FOR FINAL CONSTRUCTION NL NOT FOR CONSTRUCTION UNLESS LABELED AS CONSTRUCTION SET SHEET TITLE GROUNDING DETAILS SHEET NUMBER E-2