Re: File #19-100605-00-PC, PREAPPLICATION CONFERENCE SUMMARY
Costco Tire Center Addition, 35100 Enchanted Pkwy South, Federal Way (Parcel 219260-0180)
Dear Mr. Galliway:
Thank you for participating in the preapplication conference with the City of Federal Way's Development
Review Committee (DRC) held March 7, 2019. We hope that the information discussed at that meeting was
helpful in understanding the general requirements for your project as submitted.
This letter summarizes comments given to you at the meeting by the members of the DRC. The members
who reviewed your project and provided comments include staff from the city's Planning and Building
Divisions, Public Works Department, and representatives from Lakehaven Water and Sewer District and
South King Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information
handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In
preparing your formal application, please refer to the complete FWRC and other relevant codes for all
additional requirements that may apply to your project.
The key contact for your project is Associate Planner Leila Willoughby -Oakes at 253-835-2644, or
lrila.willc�ui�l�w-aakcscit�nfteclt raly.cr�m. For specific technical questions about your project, please
contact the appropriate DRC representative as listed below. Otherwise, any general questions about the
preapplication and permitting process can be referred to your key contact.
PROJECT DESCRIPTION
The applicant proposes to construct 5,200 square foot (+/-) Costco Tire Center addition to the front of the
existing building and additional retail space on the west elevation (related city file 18-104024-00-PC).
MAJOR ISSUES
Outlined below is a summary of the major issues of your project based on the plans and information submitted
for preapplication review. These issues can change due to modifications and revisions in the plans. The major
issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the
comments made by all departments in the following section of this letter.
Mr. Ed Galliway
Page 2of12
March 19, 2019
• Planning Division
1. Process II Site Plan Review approval is required before building permit submittal.
2. FWRC 19.115, "Community Design Guidelines," shall apply to the proposal, including all site
improvements per F VRC 19.30.090(3).
3. Provide one additional building design requirement (facade modulation or screening) on the addition
pursuant to FWRC 19.115.060(2), on all areas longer than 60 feet (i.e., Type I landscape screening,
canopies along at least 50 percent of the fagade with a six-foot projection covering 50 percent of the
fagade, or a pedestrian plaza at least 200 square feet).
4. Please provide additional articulation and accessory elements to the building additions. The proposal
is visible from several rights -of -ways.
5. All pedestrian pathways shall be delineated by separate paved routes using a variation in paved
texture and color. Approved methods of delineation include: stone, brick or granite pavers; exposed
aggregate; or stamped and colored concrete. Paint striping on asphalt is not an encouraged form of
delineation.
6. The applicant shall submit a parking analysis. The analysis shall detail hour the proposal will comply
with the minimum requirements if restriping/removing spaces, as well as how the whole site
complies with the parking minimums of other commercial pads if applicant is using stall sizes. Please
include a description of how Costco will accommodate parking demands during any restriping (i.e.,
night work, adjusted hours etc.).
• Public Works Development Services Division
7. Flow control and stormwater treatment will be required as outlined in the King County Surfaee Water
Design Manual (KCSWDNI) and the Federal Way Addendum to that manual. Treatment requirements
will apply to the entire subject site as directed by FWRC 19.30.120, while flow control requirements
will apply to those surfaces specified in the KCSWDM. Frontage improvements must also meet
current stormwater requirements.
8. WSDOT intends to begin an overlay project on 16,h Avenue South on May 1, 2019. After the overlay
is complete, there will be a five�year. moratorium on open cutting the road. Please arrange for utility
installation prior to start of the WSDOT project.
• Public Works Traffic Division
9. Due to permitting volumes, traffic comments will be sent under separate cover.
10. Find the concurrency application and right-of-way modification handouts enclosed. Both
applications shall be submitted specifically for the project proposed, i.e. if the Costco fueling station
application is submitted separately, it must have separate concurrency and right-of-way modification
requests from subject application.
17- I IIUGOS 00 P(:
l)o ID: 79775
Mr. Ed Galliway
Page 3 of 12
March 19, 2019
9 Building Division
11. Prior to construction, a cominercial building permit application is required. Land use approval shall
be completed prior to building permit submittal. Incomplete building permit applications will not be
accepted by the Permit Center. The applicant will received a custom checklist with the director's land
use decision.
DEPARTMENT COMMENTS
Outlined below are the comments made by the representatives of each department present at the
preapplication conference. Each section should be read thoroughly. If you have questions, please contact the
representative listed for that section.
COMMUNITY DEVELOPMENT — PLANNING DIVISION
Leila Willoughby -Oakes, 253-835-2644, leila.willoughby-oakes@cityoffederalway.com
1. Zoning !)esr ncrtiarr uncl Lunn! Use —The subject property is located in a Commercial Enterprise (Cr) zoning
district. Bulk retail isa. permitted use within the CE zoning. district subject to the requirements ofFWRC
19.240.060.
a. Setbkcks — 20 feet (front); 0 feet (side/rear)
b. iVlaximum I leight — 40 feet Above Average Building Elevation (AABE)
c. Parking — One parking space for every 300 square feet of gross floor area.
Aleeting f "0110W-Up: Parking is calculated based on the gross floor area of the subject property. The new
parking lot configuration may not snake the entire subject property rion-confonrung. Shared parking
agreement requircments with abutting properties can be found in FWRC 19.130,120, "Shared facilities."
d. Lot Coveru_ge — No Maximum
2. Land Use Application —
Use Process 11 — As proposed, the development requires a Process II Master Land Use Application. A Use
Process II is an administrative land use review conducted by city staff with a final decision by the
Community Development Director, Process II applications do not require public notice. They are
deemed complete on acceptance by the Permit Center based on the minimum submittal requirements.
Please see the enclosed submittal checklist for this proposal. Permit reviews are based upon application
completeness, current volumes at the city, and the timing of resubinittals by the applicant.
3. State Environmental Police Act (SEPA) Environmental Review — As submitted, the site plan will not require
environmental review. The proposal does not exceed SEPA exemptions set forth in WAC 197-11-800(2),
and the cityadopted flexible thresholds in FWRC 14.15.030.
4. Crideal Areas —For proposals located within a wellhead capture zone, please submit a completed
hazardous materials inventory checklist with your land use application.
Doc ID: 78775
19-100605 00 PC:
Mr. Ed Galliway
Page 4of12
March 19, 2019
5. Land Use Review Timeframes — The city makes every effort to issue land use decisions within 120 days of a
complete application. However, the review timeframe is suspended at any time that additional
information is requested by the city. The applicant must submit requested information within a 180-day
timeframe, unless an extension is granted pursuant to FWRC 19.15.050(2).
6. Community Design Guidelines — Review of the proposal under the city's design guidelines, FWRC Chapter
19.115, is required for the project and will occur in conjunction with the Process II decision. The
principal applicable guidelines for the project are noted below. However, this does not necessarily include
all applicable guidelines and project designers must consult the guidelines in their entirety in preparing an
application. The application must include a written narrative identifying how the proposal complies with
the applicable design guidelines, as detailed.
a. FbY C 19.115.050, "Site Design"— Refer to all sections of this chapter for site design standards.
Key sections include:
i. (1) General Criteria (b), (c), (d), (e), (0, and (g)
L (2) Surface parking lots (a), (b), (c), and (e)
iii. (4) Pedestrian Circulation and Public Spaces (a), (b), (c), (e) and (f)
iv. (5) Landscaping
v. (6) Commercial services (a) and (b)
vi. (7) Miscellaneous (a)
b. F[PRC 19.115.060, `BuildipgDesign"— Key design requirements of this section apply to the project
as follows.
i. (2) All building facades that are both longer than 60 feet and are visible from either a right-
of-way or residential use must incorporate a minimum of two out of four design options
intended to break up the mass of large buildings. These design options include fagade
modulation, landscaping, canopy or arcade, and associated pedestrian plazas.
1 (3) Building facades shall also include methods of artiadlation and accessory elements; For example
display windows, window openings with visible trim material, vertical trellis, artwork,
decorative masonry or metal patterns or grillwork, relief, material variations, etc.
9uetAno 4iOcwIAHost
Figure 10 — FWRC 19.115.060(3)
19-iO MWD 00 PC Doc ID: 78775
a
Mr. Ed Galliway
Page 5 of 12
March 19, 2019
AcCassary Elements
Figure 11 — FWRC 19.115.060(3)
MeetingFolloav-Up: The applicant shall revise or add to their proposal to meet 1WRC 19.115.060,
"Building Design" requirements. Although the site is deemed a non -conforming development,
VWRC 19.30.090(2), "Exceptions" do not govern the application of Chapter FW1tC 19.115,
"Community Design Guidelines," which includes parking lot circulation, building design,
pedestrian orientation, and accessory elements as outlined below.
c. .11WIRC' 19,115,070, `Building and Pedeattrun Orientation "— Design requirements of this section apply
to the project as follows: (1)(a-d).
d. FlFRC 19.115.090('t), `District Guidelines for CB"— Key design requirements of this section apply
to the project (FWRC 19.115.090[2]fa-f]).
i. (a) Surface parking may be located behind, to the side(s) of the building, or adjacent to the
right-of-way; provided the parking located adjacent to the right-of-way maximizes pedestrian
access and circulation.
ii. (b) Entrance facades shall front on, face, or be clearly recognizable from the right-of-way.
iii. (c) Building entrances shall be architecturally emphasized and shall incorporate transparent glass.
iv. (d) Ground floor entrances to retail sales or services shall incorporate plaza features or
furnishings, and/or streetscape amenities, in a context -sensitive amount and combination,
considering the scale of the retail use(s) and entrance(s) to the overall building or
development, and the proximity and accessibility from the building to other existing plaza or
streetscape features.
Meeting Follow -Up, .FWRC 19.115.060, `Btrilrling Design"— The tire center addition shall comply with
building design requirements and include at least two of the four fagade modulation and screening
options defined in FWRC 19.115.060. Canopies, if used to comply with building design requirements,
shall meet the minimum dimensional requirements of FWRC 19.115.050(3)(a) (minimum six-foot
projection; covering 50 percent of new facade). If the applicant were to solidly screen new facades
with foundation Type I landscaping the above provisions would not apply.
19-100605-00-PC Doc 1D: 78775
Mr. Ed Galhway
Page 6 of 12
March 19, 2019
Type I `Solid Screen' landscaping consists of the following:
"Evergreen trees, large shrubs and groundcover, which will provide a 100 percent sight -obscuring
screen within three years from the time of planting; or a combination of approximately 75 percent
evergreen and 25 percent deciduous trees, with an allowable five percent variance, with large shrubs,
and groundcover backed by a 100 percent sight -obscuring fence. Tree, shrub, and groundcover
spacing shall be appropriate for the species type, and consistent with the intent of this section."
As clarified in our meeting, the rear building expansion must comply with the minimum building
articulation and accessory elements of RVRC 19.115.060(3) as it is visible from South 352nd Street. Please
describe in the submittal narrative how the building design complies.
7. OutdoorStorageAreas — Any new outdoor storage areas associated with the tire center or retail space
expansion shall be frilly screened by'I'ype I landscaping a minimum of five feet in width, as described in
FWRC 19.125.050(1).
8. Ouldoon-, Yardr, and Lzendreaping — Landscape plan approval is applicable to all commercial developments
within the city. The landscaping plan must include, but is not limited to, replacement of vegetation within
any areas removed as a result of this proposal. Development actions may not make a site more non-
conforming. Please depict any required landscaping or street trees as a result of road frontage improvement
activities at Process Il submittal. See the Traffic Division's comments for further information.
1'1VRC 19.12.5.035, "L ancGcupe and Irrigation Plan Submittal Requirements The landscape and irrigation plan
may be provided separately or incorporated into plans submitted for site plan review.
1'WRC 19.125.040, "General L anek-caping Requirements /Ill Tonea` — Applicable general standards listed in
this section shall be incorporated into the landscape plan, if applicable.
1'WKC 19.125.090, "Performance and Maintenance Standardr"— The applicant is responsible for the following
ongoing site maintenance, regardless of the site development proposed:
Plant Mainlenance. Maintenance of planted areas shall include continuous operations of removal
of weeds before flowering; mowing; trimming; edging; cultivation; reseeding; plant
replacement; appropriate fertilization; spraying; control of pests, insects, and rodents by
nontoxic methods whenever possible; watering; or other operations necessary to assure normal
plant growth. In particular, maintenance shall promote landscape performance criteria of this
title. Plant materials that have died shall be replaced at the beginning of the next appropriate
planting season and planting areas shall be kept reasonably free of noxious weeds and trash.
• Irrigation Maintenance. All portions of any irrigation system shall be continuously maintained in a
condition such that the intent of an irrigation design is fulfilled. Uncontrolled emission of water
from any pipe, valve, head, emitter, or other irrigation device shall be considered evidence of
non -maintenance.
• Other Maintenance. Maintenance of all landscaped areas shall also include operations as needed
of painting, repairing, reconstruction, and rehabilitation of landscape structures such as walls,
fences, overheads, trellises, and the removal of trash.
I'.-10005 00 PC D., I1):78773
Mr. Ed Galliway
Page 7 of 12
March 19, 2019
• Failure to comply with landscape maintenance standards shall constitute a zoning violation
under FWRC 19.05.340.
9. Tree Density Requirements —Per FWRC 19.120.130, the applicant must provide a minimum of 20 tree units
per acre in the CE zoning district.
Meeting Follow -Up: Please clarify if your scope of work includes removal or modifications to existing
landscape islands and/or perimeter landscape buffers.
10. Rooftop Mechanical Equipment — Per FWRC 19.110.070, vents and similar appurtenances that extend above
the roofline must be surrounded by a solid sight -obscuring screen that is integrated into the architecture
of the building and obscures the view of the appurtenances from adjacent streets and properties. Please
provide screening details on the elevation drawings.
11. Term of Approval — FWRC 19.15.100(2) states that the applicant must substantially complete construction
for the development activity, use of land, or other actions approved, and complete the applicable
conditions listed in the Use Process II decision within five years after the final decision of the city on the
matter, or the decision becomes void.
12. Application -Fees — The formal application must be prepared in accordance with the city's Submittal
Requirements for Process lI (enclosed) and must be accompanied by the appropriate fees. As fees change
annually, please contact the Permit Center staff for the current application fees for Use Process II, Right -
of -Way Modification Requests, Concurrency, and other permits/reviews identified in this letter. The
Permit Center can be reached at 253-835-2607, or perrnitcet1terQ6tWffedera1m, y.com.
PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION
Ann Dower, 253-835-2732, ann.dower tr cityoil'ederal►vay.com
Land Use Issues — Stormwater
1. Surface water runoff control and water quality treatment will be required per the 2016 King Count' Surface
6Ylater Design Manual (KCS\Y/DM) and the City of Federal Way Addendum to the KCSWDM
(Addendum). This project meets the requirements for a Full Drainage Review. At the time of land use
site plan submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the
project to the nine core and five special requirements of the KCSWDM will be required. A Level 1
downstream analysis shallalso be provided in the preliminary TIR. The city has 1" = 100', five-foot
contour planimetric maps in GIS format that may be used for basin analysis.
2. The project lies within a consen ation flow control area; thus, the applicant must design the flow control
facility to meet these performance criteria. Since the project creates more than 5,000 square feet of new
or replaced impervious area, requirements for a flow control facility and Best Management Practices
(BMP's) apply as outlined in the KCSWDM. Should frontage improvement requirements create enough
new/replaced impervious area to require a detention facility and/or BMP's, this area can be evaluated
separately from the site.
0- 100605-00 PC Du I D: 78775
Mr. Ed Galliway
Page 8 of 12
\/larch 19, 2019
3, The project lies within an Enhanced Basic Water Quality Area. Water quality treatment shall be designed
to meet the treatment criteria of the Enhanced Basic Water Quality Menu provided in the KCWDM. In
addition to the KCSWDM, our initial review suggests that FWRC 19.30.120, "Nonconforming Water
Quality Improvements," applies to this site. Specifically, the following items are applicable:
"(b) Redevelopment which involves the construction or replacement of a building footprint or
other structure having a surface area of 5,000 square feet or more, or which involves the expansion
of a building footprint or other structure by 5,000 square feet of surface area or more; OR
"(c) Redevelopment which involves the repair or replacement of 5,000 square feet or more of an
impervious surface, when such redevelopment is not part of a routine maintenance activity; OR
"(g) Redevelopment, other than normal maintenance or other than the tenant improvements, but
including any increase in gross floor area, in any one consecutive 12-month period which exceeds
50 percent o f the assessed or appraised value (whichever is greater) of the structure or
improvement being redeveloped. The appraisal must be from a state -certified general appraiser.
For purposes of determining value under this section, improvements required pursuant to
FWRC 19.30.090 (nonconforming development), 19.30.110 (street/sidewalk improvements), this
section (nonconforming water quality improvements) and FWRC 19.135.030 (street/sidewalk
improvements) shall not be counted towards the 50 percent threshold which would trigger
application of this subsection."
Therefore, water quality will be required for the entire site, including new and existing pollution
generating impervious surfaces. "Site" as defined in 1.1.13 footnote 2 of the Addendum, refers to all
parcels under contiguous ownership. Treatment options must be selected from the Enhanced Basic
Water Quality Menu provided in the KCSWDM. Water quality requirements may be evaluated separately
for the frontage improvements.
4. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must
be provided to verify infiltration suitability.
5. Detention and water quality must be above ground (i.e. open pond). Underground facilities are allowed
only with approval from the City of Federal Way Public Works Department.
6. Show the proposed location and dimensions of the detention and water quality facilities on the
preliminary plans.
7. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination
System (NPDES) construction storm water permit may be required. Information regarding this permit
can be obtained from the Washington State Department of Ecology at 360-407-6048, or
�]t ): �V\Vw.tC'.�V:i. UV r[7rrS1117ti WC S rin�S+afCl: L'[lll�tl•LlCfii7[1 iliC1NK 31f1Y71,
Right -of -Way Improvements
See the Traffic Division comments from Senior Transportation Planning Engineer Sarady Long for
traffic related items.
2. If dedication of additional right-of-way is required to install street frontage improvements, the dedication
shall be conveyed to the city through a statutory warranty deed. The dedicated area must have clear title
prior to recording.
19 100605 00 PC; Doc ID: 7877,
Mr. Ed Galliway
Page 9 of 12
March 19, 2019
3. All stormwater treatment and detention requirements outlined above may apply to any improvements
within the public right-of-way.
4. A five-year moratorium on cutting 160, Avenue South will be in place once the WSDOT overlay project
is complete. WSDOT is planning to start work on a pavement overlay and curb ramp replacement on
May 1, 2019. If there is any need to pothole or cut 161, please contact the right-of-way p(mnit desk at
253-835-2725, immediately and plan to complete work in the right-of-way ahead of the WSDOTproject.
Building (or EN) Permit Issues
1. Engineered plans are required for clearing, grading, road constLuction, and utility work. Plans must be
reviewed and approved by the city. Engineering review Fees are $3,004.00 for the First 12 hours of review,
and /67.00 per hour for additional review time. A final TIR shall be prepared for the project and
submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a
professional engineer registered/licensed in the state of Washington.
2. The Federal Way Public Vorks Development.S'landards Manual (including standard detail drawings, standard
notes, and engineering checklists) to assist the applicant's engineer in preparing the plans andTIR is
available on the city's website at 1w12:1/W,,VX►f citvoFFederalnay.coan indeX.aspx?n.id- ,��.
3. Bonding is required for all street improvements and temporary erosion and sediment control measures
associated with the project. The bond amount shall be 120 percent of the estimated costs of the
improvements. An administrative fee deposit will need to accompany the bond to cover any possible
legal fees in the event the bond must be called. Upon completion of the installation of the improvements,
and Final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original
amount and held for a two-year maintenance period.
4. The developer will be responsible for the maintenance of all storm drainage facilities (including the
detention and water quality facilities) and street systems during the two-year maintenance period. During
that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's
compliance with the maintenance requirements. Upon satisfactory completion of the two-year
maintenance period, the remainder of the bond.vlu be released. Maintenance for public roads and
subdivision drainage facilities then become the responsibility of the city. Maintenance for private roads
and drainage facilities, including short plats, remain the responsibility of the individual property owners.
5. When topographic survey information is shown on the plans, the vertical datum block shall include the
phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are
called out.
6. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. Site plans shall be
drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans.
7. Provide cut and Fill quantities on the clearing and grading plan.
8. Temporary Erosion and Sediment Control (TESC) measures, per Appendix D of the 2016 KCSWDM,
must be shown on the engineering plans.
9.. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction.
Doc ID: 7R77
19 100605 00 PC
Mr. Ed Galliway
Page 10 of 12
March 19, 2019
PUBLIC WORKS — TRAFFIC DIVISION
(Sarady Long, 253-835-2743, sarady.longCt)cityoffederal►vay.cgm)
Due to permitting volumes, traffic comments will be forwarded under a separate cover. Contact your project
planner should you have any questions.
COMMUNITY DEVELOPMENT — BUILDING DIVISION
Greg Kirk, greg.ldrk@cityoffederalway.com
1. Builditt.g Coder. The structure will be treated as a new building permit application and must meet all current
codes.
2. Building Permit Application Process. A completed building permit application and commercial checklist are
required. The commercial checklist will be filled out by staff and provided at the time of land use approval.
Copies of application and checklist may be obtained on our web site at w►�nv.cit�c�FEcc1R iahva� .ccsm.
Appointments are required for intake of new commercial building permit submittals. Please contact the
Permit Center to schedule an intake appointment at (253) 835-2607, or permitcente►cit;=esffedceah�nc�ii�.
Some projects may require a third party review or inspection. The cost to cover these fees is the
responsibility of the applicant. Any third party fee is in addition to regular permit fees and costs.
Please note, land use approval is recommended prior to submitting the building permit application to
avoid delay in project review. If the project has not received land use approval, it may be placed on hold
until land use review is completed.
3. Review Tindq, Federal Way reviews plans on a first -in, first -out basis; however, there are some small
projects with inconsequential review requirements that may be reviewed out of order.
The first comment letter can be expected within five to seven weeks of submittal date. Re -check of plans
will occur in one to three weeks after resubmttta.
Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally
submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response,
what changes have been made from the original drawings. Plans for all involved departments will be
forwarded from the Community Development Department.
4. Other Permits &-Inspections. Separate permits maybe required for electrical, mechanical, plumbing, fire
suppression systems, and signs. Applicants may apply for separate permits at any time prior to
commencement of construction.
When required, special inspections shall be performed by WABC► approved agencies, or by agencies
approved by the building official, prior to permit issuance. Construction must be approved by all
reviewing departments prior to final building division inspection.
19 II1176Oi 110-11C
D., ID: 78775
Mr. Ed Galliway
Page 11 of 12
March 19, 2019
All concerned departments (planning, public works, electrical, & fire) must sign off before the Building
Division can final the structure for occupancy. Building final must be approved prior to the issuance of a
Certificate of Occupancy.
Construction projects may be required to have a pre -construction conference. If a pre -con meeting is
required, the general or representative, all subs, the architect or representative, the engineer or
representative, electrical contractor, and any other interested party, should attend this meeting. Meetings
will occur at the Building Division and will be scheduled by the inspector of record for the project.
5. Site -Specific Requirements. Separate demolition and electrical permits are required.
6. When an Appointment is Required. Please see the enclosed handout for further information.
The information provided is based on limited plans and information. The comments provided are
not intended to be a complete plan review and further comments are possible at time of building
permit plan review.
SOUTH KING FIRE AND RESCUE
Chris Cahan, 253-946-7243, Chris Cahan@southkingfire.org
Fire Lane
The fire lane is to remain open and clear of parked equipment and storage during construction.
TIRE CENTER
Fire Sprinkler System
An NFPA 13 fire sprinkler system is required.
Fire Alarm
A fire alarm system is required.
Tire Storage
The tire storage within the building will be in accordance with chapters 32 and 34 of the 2015 IFC.
NEW SALES FLOOR
Fire Sprinkler System
Modification to the fire sprinkler system will require a separate permit.
Fire Alarm
Modification to the fire alarm system and or devices will require a separate permit.
I9-100605-00-Pc Doc Ill: 78775
Mr. Ed Galhway
Page 12 0£ 12
March 19, 2019
CLOSING
This letter reflects the information provided at the preapplication meeting and is intended to assist you in
preparing plans and materials for a formal application. We hope you found the comments useful to your
project. We have made every effort to identify major issues to eliminate surprises during the city's review of
the formal application. The completion of the preapplication process in the content of this letter does not vest
any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4).
As you know, this is a preliminary review only and does not take the place of the full review that will follow
submission of a formal application. Comments provided in this letter are based on preapplication materials
subtnitted.
Modifications and revisions to the project as presented for this preapplication may influence and modify
information regarding development requirements outlined above. In addition to this preapplication letter,
please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the
codes that are not addressed in this letter are still required for your project.
If you have questions about an individual comment, please contact the appropriate department representative
noted above. Any general questions can be directed towards me, the key project contact, Leila Willoughby -
Oakes, at 253-835-2644, or lWe loot: forward to working
with you.
Sincere'
-.eila Willoughby -Oakes
Associate Planner
enc: Master Land Usc Application
Process 11 Submittal Requirements
Concurrency Application
Right -of -Way Modification Request
FWRC 19.240.060, "Retail -Bulk Retail"
FWRC 19.115.060, "Building Design — All Zoning Districts"
Hazardous Materials Inventory Checklist
"When an Appointment is Required"
South King fire & Rescue Access Policy
Lakehaven FInclosures
c: Greg Kirk, Plans l?xaminer
Ann Dower, Senior Engineering Plans Reviewer
Sarady bong, Senior Trans. Planning Rrigineer
Chris Cahan, South King [ire & Rescue
Brian Asbury, Lakehaven Water & Sewer
Kathy Mathena, Lakehaven Water & Sewer
Megan Palmer, Barghausen, natwnlrt et�{�ihar>•h:anzt:ny�
Sean Anderson, Barghausen, > 1 +nu fr`b:rr y 1-. evm
19-100605-00-PC Doc ID: 78775
CITY OF
�.. Federal Way
Centered on Opportunity
February 15, 2019
Mr. Ed Galliway
MG2
1101 2nd Avenue, Suite 100
Seattle, WA 98101
ed. allz m
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www.cityoffederalway.com
Re: File #19-100605-00-PC; PREAPPLICATION CONFERENCE
Costco Tire Center Addition & Canopy, 31500 Enchanted Pkwy South, Federal Way
Dear Mr. Galliway:
Jim Ferrell, Mayor
The Community Development Department is in receipt of your preapplication conference request. The
application has been routed to members of the Development Revinv Committee and the conference has been
scheduled as follows:
11:00 a.m. — Thursday, March 7, 2018
Hylebos Conference Room
Federal Way City Hall, 2nd Floor
33325 8th Avenue South
Federal Way, WA 98003
We look forward to meeting with you. Please coordinate directly with anyone else you would like to attend
the conference as this will be the only notice sent by the department. If you have any questions regarding the
conference, please contact meat leila.willoughby-oalces riU[Eederaiw;iy.com, or 253-835-2644.
Sincerel ,
Leila Willoughby -Oakes
Associate Planner
19-100605-00-PC Doc. I.D. 78769
A4CITY OF
.. Federal Way
Centered on Opportunity
IVIr. Ed Galliway
MG2
1101 2^-J Avenue, Suite 100
Seattle, ``UA 98101
Kul � i��atfrt)m�2�mi
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
wwwv cityoffederalway. cam
Jim Ferrell, Mayor
April 1, 2019
Re: File #19-100605-00-PC, PREAPPLICATION TRAFFIC COMMENTS
Costco Tire Center Addition, 35100 Enchanted Pkwy South, Federal Way (Parcel 219260-0180)
Dear Mr. Galliway:
Thank you for participating in the preapplication conference with the City of Federal Way's Development
Review Committee (DRC) held March 7, 2019. Staff forwarded a preapAcation summary letter to you on
March 19, 2019. We hope that the information discussed at that meeting was helpful in understanding the
general requirements for your project as submitted.
This letter summarizes comments given to you at the meeting by the Public Works Traffic Division. This
Ietter does not represent all applicable codes. In preparing your formal application, please refer to the
complete FWRC and other relevant codes for all additional requirements that may apply to your project.
Associate Planner LeilaWilloughby-Oak-es (l ila.0 ill, it, ltl�� os,l:rs tt7cit r.sl nt or 253-835-26}-
For specific technical questions about your project, please coritact the traffic engineer listed below.
PROJECT DESCRIPTION
The applicant proposes to construct a 5,000 square foot Costco Tire Center to the front of the building, and
additional retail space on the west elevation (see related city file 18-104024-00-PC).
MAJOR ISSUES
Outlined below is a summary of the major issues of your project based on the plans and information
submitted for preapplication review from the Traffic Division. These issues can change due to modifications
and revisions in the plans. These major issues only represent coirunents that the DRC consider most
significant to your project and do not include the real ority of the comments provided. The major issues
section is only provided as a means to highlight critical requirements or issues. Please be sure to read the'
entire department comments made in the nett section of this letter.
Public Works Traffic Division
9 Staff is aware of another development project proposed for the fueling station at this site. If the proposals
are submitted under separate land use applications, the applicant shall submit separate concurrency, right
of way modification requests, and related traffic studies specific to the subject proposal.
■ Trrawportedio►r Concuireng [Management (FTVRC 19.90) — A transportation concurrency permit with the
application fee of $1,721 (1 - 10 trips) is required for the proposed project.
Doe I D 7H451
oc
Mr. Ed Galliway
Page 2 of 4
April 1, 2019
■ Tra§c Impact Fees (Fir/RC 19.91) — Traffic impact fees payment will be assessed at the building permit
issuance.
• Frontage Improvements (FWRC 19.135.040) — Construct half -street frontage improvements and dedicate
right-of-way along the property frontage on SR 161 and South 352^d Street if the proposal exceeds the 25
percent threshold.
Transportation ImpactAnalysis (TIA.) — A TIA prepared by a licensed engineer in the state of Wasington is
required to assess queuing and safety.
PUBLIC WORKS — TRAFFIC DIVISION
Sarady Long, 253-835-2743, sarady.lring(rt` w Mfe[Icrahvay.Coln
Transportation Concurrency Analysis (FWRC 19.90)
1. Based on the submitted materials to expand the Costco building by approximately 2,305 square feet, and
the Institute of Transportation Engineers (ITE) Trip Generation - 10,h Edition, land use code 857
(Discount Club), the proposed project is expected to generate 10 new PM peak hour trip.
2. A concurrency permit is required for this development project. The PW Traffic Division will perform a
concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peals
period to accommodate the proposed development. Please note that supplemental transportation analysis
and concurrency mitigation may be required if the proposed project creates an impact not anticipated in
the six -year Transportation Improvement Plan (TIP).
3. The estimated fee for the concurrency permit application is ,$"1,721 (1 - 10 trips). This fee is an estimate and
based on the materials submitted for the preapplication meeting. The concurrency application fee must be
paid in full at the time the concurrency permit application is submitted with the land use application. The
fee may change based on any changes in the estimated weekday PM peak hour trips as identified in the
concurrency application. The applicant has the option of having an independent traffic engineer prepare
the concurrency analysis consistent with city procedures; however, the fee remains the same.
Transportation Impact Analysis (TIA) (FWRC 19.135)
4. A Traffic Impact Analysis (TIA) prepared by engineer licensed in the state of Washington is required for
this development project. The engineer should contact the Traffic Division for a scoping sheet in the
initial stages of their study. The TIA should include the following analysis:
• Queuing analysis access points for morning, evening, and Saturday peak hours.
Transportation Impact Fees (TIF) (FWRC 19.91)
5, Based on the submitted materials to increase the store by approximately 2,305 square feet, the estimate
traffic impact fee is $18,420. Please note, the actual impact fee will be calculated at the time a completed
building permit application is filed and must be paid prior to permit issuance.
19•I00605 (10 VC Doc. I.D. 78954
tifr. Ed Galliway
Page 3 of 4
April 1, 2019
Street Frontage Improvements (FWRC 19.135)
6. Based on King County Assessor's record and the submitted materials, it appears this proposal meets the
25 percent threshold criteria for requiring street frontage improvements as identified in the FWRC
19.135.030. The applicant/owner may submit an appraisal for the subject property. The Public Works
Development Services Division will evaluate the submitted appraisal data to determine if the project
actually meets the city's 25 percent threshold for requiring street frontage improvements.
7. If the proposed project meets the 25 percent threshold, the applicant/owner will be expected to
construct street improvements consistent with the planned roadway cross -sections as shown in Map II1-4
in .Chapter III of the Federal lVay Camp rbeafive Plan (FWCP) and Capital Improvement Program (CIP)
shown as Table III-10 (FWRC 19.135.040). Based on the materials submitted, staff conducted a limited
analysis to determine the required street improvements. The applicant will be expected to construct
improvements on the following streets to the city's planned roadway cross -sections:
• South 352°d Street is a Principal Collector planned as a Type "M" street, consisting of 36-foot street
with curb and gutter, 6-foot planter strips with street trees, 8-foot sidewalks, and street lights in a 70-
foot right-of-way. Assuming a symmetrical cross section, five feet of right-of-way dedication and half
street improvements are required as measured from the street centerline. South 3521,d Street is
improved with vertical curb gutter, sidewalks, streetlights, etc., on both sides of the street. However,
the improvements on the north side of the street are not to current standard and will not likely meet
ADA requirements.
+ Enchanted Parkway South (SR 161) is a Principal Arterial planned as a Type "A" street, consisting of
a 90-foot street.with curb and gutter, 6-foot planter strips with street trees, 8-foot sidewalks, and
street lights in a 124-foot right-of-way. Assuming a symmetrical cross section, 12 feet of right-of-way
dedication and half street improvements are required as measured from the street centerline.
The applicant may make a written request to the Public Works Director to modify, defer, or waive the
required street improvements (FWRC 19.135.070). These modification requests currently have a nominal
review fee currently at $334.00.
Access Management (FWRC 19.135
8. The westerly driveway on South 352nd Street should be redesigned to minimize queuing and to facilitate
on site traffic circulation. This may include increasing throat length to a minimum of 50 feet and
modifying the existing standard curb cut to radius. Also, a left turn lane from the internal drive aisle into
the fueling site should be explored.
9. A mini -roundabout should be explored at the main entrance to Costco and The Home Depot.
10. The internal driveway off of Enchanted Parkway South between the Costco fueling facility and the Olive
Garden restaurant should be redesigned to incorporate a mini -roundabout or other alternative.
Do, L) 78954
19-10060i IAY PC
Mr. Ed Galliway
Page 4of4
April 1, 2019
11. Minimum throat length for non -single-family driveways shall be 40 feet minimum, 50 feet desirable.
Throat length is measured from the face of curb (or edge of traveled way if no curb exists) on the public
street to the first conflicting drive aisle or parking movements that would conflict with entering and
exiting traffic.
CLOSING
This letter reflects the information provided at the preapplication meeting and is intended to assist you in
preparing plans and materials fora formal application. We hope you found the comments useful to your
project. We have made every effort to identify major issues to eliminate surprises during the city's review of
the formal application. The completion of the preapplication process in the content of this letter does not vest
any future project application. Comments in this letter are only valid for one year as per U vVRC 19.40.070(4).
As you know, this is a preliminary review only and does not take the place of the full review that will follow
submission of a formal application. Comments provided in this letter are based on preapplication materials
submitted.
If you have questions about an individual comment, please contact the appropriate department representative
noted above. Any general questions can be directed towards me, the key project contact, Leila Willoughby -
Oakes, at 253-835-2644, or Leila.lY'iticrtEglib i)ak:esf city=offe�fcrahy ,rr.cot i. We look forward to working
with you.
Sincerely,
�V
Leila Willoughby -Oakes
Associate Planner
c: Natalie Kamieniecki, Associate Planner .
Ann Dower, Senior Engineering Plans Reviewer
Sarady Long, Senior Transportation Planning Engineer
Chris Cahan, South King Fire & Rescue
Charlie Ekblad, MG2,
Megan Palmer, Barghausen, se ril ne it' ha +1 auti n
Sean Anderson, Barghausen, ra dt-mon {21hn i> a n n
19-100609-00d'c: D-.1 178951
41k
CITY OF
Federal Way
MASTER LAND USE APPLICATION
F CD U U "' DEPARTMENT OF cor4mu IrrY DEVELoPdmENT
33325 8`' Avenue South
CITY OF FEDERAL WAY Federal Way, WA 98003-6325
COMMUNITY 1]EVELOPMENT 253-835-2607; Fax 253-835-2609
ww►a.Ci 1yg lliedyrsl ►vayx uii1
APPLICATION NO(S)
0)(005--co 7:c-- Date 1.21.19
Project Name Costco Wholesale -Tire Center and Canopy Addition
Property Address/Location 35100 Enchanted PKWY S. Federal Way, WA 98003
Parcel Numbers) 2192600180
Project Description A building addition of 2,305 SF to add tire center services. The entire west elevation and
entry area will be renovated. Internally, the existing tire center In the 5E corner of the
building will be converted to additional sales floors ace.
'LEAbr
Type of Permit Required
_ Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
_ Lot Line Elimination
x Preapplication Conference
_ Process I (Director's Approval)
Process II (Site Plan Review)
_ Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
_ Process VI
_ SEPA w/Pmject
_ SEPA Only
Shoreline: Variance/Conditional Use
_ Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
CE Zoning Designation
Commordal
Enimprim -Comprehensive Plan Designation
$8,383,300 Value of Existing Improvements
$3,000,000 Value of Proposed Improvements
International Building Code (IBC):
M Occupamy Type
V-B Construction Type
Bulletin #003 —January 1, 2011
Applicant
Name: Ed Galliway (MG2 Corporation)
Address:1101 2nd Ave. Ste. 100
City/State: Seattle, WA
Zip: 98101
Phone: 206.962.6500
Fax: N/A
Email: Ed.�awlay��Siato��11M.
Agent (if different t4kppFicant)
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Owner
Name: Kim Katz (Costco Wholesale)
Address: 999 Lake Drive
City/state: Issaquah, WA
zip:98027
Phone: 425.427.1540
Fax:
Email: kkatz@costco.com
Signature: k :�,�
Page 1 of 1
k:\HandoutsMaster Land Use Application
CITY OF Pre -application ConferenceSign Si n in Sheet
Federal Way
COMMUNITY DEVELOPMENT REVIEW COMMITTEE
March 7, 2019 City Hall
11:00 a.m. Hylebos Room
Project Name: Costco Tire Center & Canopy
AZldress: 31500 Enchanted Pkwy S.
File Number: 19-100605-00-PC (Rel. File: 18-104024-00-
NAME
DEPARTMENT I DIVISION
TELEPHONE NUMBER/EMAIL
Leila W-Oakes
CD/Planning
253-835-2644
Leila Willoughby-
Oakes@cityoffederaw4y.com
Cole Elliott
PW Development Services
2.
Manager
�5
3.
c
rvc-e� �0�1/ !� • Ch
4Z5) t
4.
5.
er) c W
w Mq 7-- -
2U6 A6Z.,- (el- l ?-
6.
PAzgV SAS
�''►��'A ,
fet_A ba jri-► 2, LA
GN
�rR�
e. Sy$t Al) @ M (M Z-AM
7.
GH A"
V'3 -3S-z3 `1
_
w
8.
)
'mot/
PzJ motif �71/ GS
Z� �� 2- 73 Z
�►-
9.
n
�n � ._
&H-eiS eAAA-►
QW,,-7Z43II��I ,
1
10.
1'tS . &JAAn(J�
Qr a
C� �t�•� u �T
�1,.f ��¢�/.,� �!� c2S
.
11.
1
12.
��.Cow,,
fV10%
,N � 0.11
r
Cd-q �1 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT
l
Q DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: rI r 2 12 19
TO:Cole Elliott, Development Services Manager
eg Kirk, Building Plans Examiner
f - �V Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven. Water & Sewer District
Chris Cahan, South King Fire & Rescue
FROM: Leila Willoughby -Oakes, Planning
FOR DRC MTG. ON: k Febtary 28, 2019VIN
qy March 7, 2019; 11:00 AM - with applicant
FILE NUMBER(s) : 19-100605-00-PC
RELATED FILE NOS.: 18-104024-00-PC (Gas Canopy Expansion)
PROJECT NAME: COSTCO WHOLESALE - TIRE CENTER & CANOPY
PROJECT ADDRESS: 35100 ENCHANTED PKWY S
ZONING DISTRICT: CE
PROJECT DESCRIPTION: Proposal to construct a 2,305 square foot
addition to the existing tire center with
associated site improvements (path). The entire
west elevation and building will be converted to
additional sales floor space.
LAND USE PERMITS: Process II - Site Plan Review
PROJECT CONTACT: MG2 (ED GALLIWAY), (206) 962-6500, ed.gailiway@mg2.com
MATERIALS SUBMITTED: Site Plans/Elevations
Application
r J r,. Qk .ca(e'
S--1 14- . d VA
LLwwx
B
l r,
wpm
t
i
i
Midi
MIMI
1 YLVI✓
"° TIRE CENTER
A A 1 \A/AV \A/A
]ON
Omni
■n■OEM
]ME
MEN
po
HIM
i
k
FEBRUARY 4 2019
V�1.0 CONNECTION OF OLD AND NEW
FEDERAL WAY, WA
71-
jlW
am %
A
DOW
ow:
4 Cl 17
Awt
_44
0 My 0,
10
PO.:ruBgp 3U3;-00,1SQ'
We- „_
a
F Ir 17,
t
fill Cl it l I
F—W
„ .rr -, .li. ������ ilit
WIT,
,-Mir
fir
qw
t -
gap
J,