RE: Permit #14-102547-00-CO; SEATTLE CHILDREN'S SOUTH SOUND CLINIC
34920 ENCHANTED PKWY S
Dear Mr. Soga:
The Public Works Department has reviewed the civil engineering plans for the above -referenced project.
Prior to permit approval, please have the civil engineer address the following comments:
1) A storm drain cleanout should be installed as part of the new roof drain connection shown on
Sheet C 2.00. Please show this cleanout on the plan and provide the (enclosed) City Standard
detail on the detail sheet.
2) Catch basin protection (CB inserts) shall be provided in each of three (3) catch basins in the
vicinity of the building for temporary erosion and sediment control (TESC) during building
demolition and construction activities. Please show these as part of the demolition plan (see
enclosed), and provide a detail on the detail sheet.
3) Bonding is required for all TESC measures; however, since the TESC measures are relatively
insignificant in cost, the City will only require a cash deposit be paid at permit issuance. The
estimated deposit amount is calculated to be $500.00. This deposit will be refunded upon project
completion and after the inserts have been removed.
Please revise the civil plans as necessary, and re -submit 4 copies of the revisions.
If you have any questions, please feel free to contact me at (253) 835-2734, or via e-mail at
ke�in.pztersonlcr}c ityoffedera 1 way.co m
Sincerely,
10'041�__
_
Kevin Peterson
Engineering Plans Reviewer
KP:jo
enclosure
qc7: Project file
Day file
Doc. I.D.
COUG HLI N PORTERLUN D E E N
STRUCTURAL CIVIL SEISMIC ENGINEERING
801 SECOND AVENUE SUITE 900, SEATTLE, WA 96104 / 206
/ DATE / PROJECT
05/30/14 Seattle Children's Hospital
South Sound Clinic
/ CLIENT / CONTENT
ZGF Technical Information
Report
COUGHLINPORT ERLUNDEEN
STRUCTURAI CIVIL SE ISM -
ENGINEERING REPORT
Technical Information Report
Seattle Children's Hospital - South Sound Clinic
34920 Enchanted Parkway
Federal Way, WA 98003
PREPARED FOR:
SEATTLE CHILDREN'S HOSPITAL
4800 Sand Point Way
Seattle, WA 98105
CONTACT / Sandy Miller
PREPARED FOR:
ZIMMER GUNSUL FRASCA ARCHITECTS
925 Fourth Avenue, Suite 2400
Seattle, WA 98104
CONTACT / Taka Soga
PREPARED BY:
COUGHLIN PORTER LUNDEEN
801 Second Avenue, Suite 900
Seattle, WA 98104
P 206.343.0460
CONTACT / Alan Jacobson, P.E., LEED A.P.
801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206 343 0460 / cplinc com
TECHNICAL INFORMATION REPORT
AND HYDROLOGIC ANALYSIS
Seattle Children's South Sound Clinic
Coughlin Porter Lundeen Project No. C140194-01
May 30, 2014
TABLE OF CONTENTS
Section Page
I. PROJECT OVERVIEW............................................................................................................................ 2
GENERALDESCRIPTION ........................... ................................................ ................ ........... ............ I............................. 2
EXISTING CONDITIONS........................................................... .......... ,............................. ........................... .......... 2
PROPOSED DRAINAGE SYSTEM..................................................................,.................._.............................
II. CONDITIONS AND REQUIREMENTS SUMMARY.............................................................................. 3
KING COUNTY SURFACE WATER MANAGEMENT DESIGN MANUAL CORE REQUIREMENTS: . ............. ..................... 3
SPECIALREQUIREMENTS: ........................................ .. . ................ ....... .......... .............................................. 3
PROJECT SPECIFIC REQUIREMENTS: .................................................... _._ .......................... __ ........................ 4
III. OFF -SITE ANALYSIS.............................................................................................................................. 4
IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ............................. 4
EXISTING SITE HYDROLOGY (PART A)............................................................. .......................... ......................... 4
DEVELOPED SITE HYDROLOGY (PART 13)............................................................................................................ 4
PERFORMANCE STANDARDS AND FLOW CONTROL SYSTEM (PARTS C AND D)............................................... 5
WATER QUALITY SYSTEM (PART E)...... .................. ................. ...- 5
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN........................................................................... 5
VI. SPECIAL REPORTS AND STUDIES.....................................................................................................5
VII. OTHER PERMITS.................................................................................................................................... 5
VIII. CSWPPP ANALYSIS AND DESIGN...................................................................................................... 6
STANDARD REQUIREMENTS .................................... ....... .................................................................. :........... -.... 6
IX. BOND QUANTITY, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ...................... 6
X. OPERATION AND MAINTENANCE MANUAL..................................................................................... 6
STANDARDMAINTENANCE.................................................................................................................................. 6
J
J
J
J
COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic
J11 Federal Way
LIST OF FIGURES
Figure 1 - TIR Worksheet ................................................... .---.............
Figure 2 - Site Location ...............--............................---........................--
Figure 3 - Drainage Basin Map ............................... .......................
Figure4 - Soils Map ................... .... ............. ........ —..- .............. .............
Figure 5 - Flow Control Map....................................................................
Figure 6 - Water Quality Map ...............................................................
Figure 7 - 100-yr Floodplain Map.........................................................—
Figure 8 - Sensitive Areas......................................................................
Figure 9 - Drainage Complaints Map.............. ......................................_....
LIST OF TABLES
..................................................17 -19
.......................... •........................-- 211
........................................................ N.A.
........................................................ N.A.
........................................................ N.A.
.................................................. N.A.
........................................................ N.A.
......................................................... N.A
Table 1 - Existing Site Conditions Area Breakdown........................................................................................... 4
Table 2 - Developed Site Conditions Area Breakdown ......................... ................................ :............................ 4
COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic
Ili Federal Way
Ll
I. PROJECT OVERVIEW
General Description
The following Technical Information Report (TIR) provides the technical information and design analysis
required for developing the Drainage and Temporary Erosion and Sedimentation Control Plan (TESC) for
the Seattle Children's Hospital (SCH) South Sound Clinic. The stormwater design for the project is based
on the requirements set forth by the City of Federal Way (CFW) Addendum to the 2009 King County
Surface Water Design Manual (KCSWDM) (See Figure 1 — Technical Information Report Worksheet).
SCH South Sound Clinic is located at 34920 Enchanted Parkway in Federal Way (See Figure 2 — Site
Location). The site currently consists of a retail center with 3 structures on one parcel (2192600570).
Existing Conditions
The existing site was previously used as a retail space with a majority of the area paved for parking and
sidewalks or structures. , The only planting on the site is in planter strips in the parking lot and landscape
islands in front of this former Circuit City building. The current storm system is sized for and conveys all
stormwater offsite to an existing detention vault southwest of the project area, before discharging off -site into
Enchanted Parkway.
Proposed Drainage System
The proposed site will result in over 2,000 square feet of new or replaced impervious and pervious area,
which, per the CFW Addendum to the KCSWDM, requires a "Full Drainage Review" (CFW Adden�d�um o fthe
/' f
KCSWDM 1.1.1.A). 'go, I Fr���c��js%C)e)e) � �C• 1tC/C�I(��1�1���I�� •'Y��
It was determined that no flow control facilities will be required for this project based on Exemption #1 from
the KCSWDM. This exemption states that flaw co-n rai wilf not be required unless the peak flows from the
t 100 year storm increase by more than 0.1 cfs from predeveloped conditions. See Section IV for more
information o floy cor�tr .1 re uirements. '�
,' �c�`,L - , q � & v, -�C� t +W�
f �� C [" c��/odc���;
The project area will not reduire storm water quality treatment based on the Exemption #1 the Surface Area
Exemption, from KCSVVDM. This exemption requires that tie project includes less than 5,000 SF of new
plus replaced PGIS and less than 35,000 SF of PGPS. See Section IV for more information on water
quality treatment requirements.
,,-r7 To
-7,P—FATAX ly / A�p
jal. G ( Fk"
r mac:"
COUGHLINPORTERLUNDEEN
2
Seattle Children's Hospital — South Sound Clinic
Federal Way
CONDITIONS AND REQUIREMENTS SUMMARY
This section will address the requirements set forth by the Core and Special Requirements listed in Chapter
1 of the KCSWDM and the amendments set in place by the CFW Addendum to the KCSWDM.
King County Surface Water Management Design Manual Core Requirements:
^� ��' �tsclaarpe at the Natural Location (7.2.?): ,This requirement is met due to the fact that all of the site's
L� dieveloped-f lows -will -follow -the -existing storm water path. This Rroject will not be making any
—� adjusts to the existing storm ter,tln n eXn n s stem. L,
9 Off --site Analysts (9,2.2} This project does not require a full off -site analysis because it meets
Off-site
which states that any project that does not change the rate, volume, duration, or
locations of discharge do not require off -site analysis. Thi pro ect does no a0d any n w� If�permeable
urfaces and therefore meets this exern5ion. � �'
I �i� G �? �rl30 Pj
3 � �trot 1. This project does not require any flow control based on KCSWDM Exemption #1
rf oamihe-K�SWDM-which states that a flow control structure will not be required unless the peak flows
' from the 100 year storm increase by more than 0.1 cfs from p'radeveloped conditions. See Section p
--rr �{ for more infor+oration on flow pontrol requirements.
iIVY/�y �r�� �1 `Ij Oi Lj �GG�Gc,1-i��-L �.trl�`�� �]� �{
]"r �I ip�. S
onvevahceystem (12. No analysis of conveyance Sys ca�acr y Is r� ifi�ed for this project
locyd, *4J because no new flow conditions are being created. The existing storm system will remain in place a d
e�rea o • Impermeable surface is not being increased ,� � E,�,� �_hi"7 � � �6� f�.�-'
cx �c- "Area Ad . c ���`��''"`�o�,`�1 rasion and Sedimentatroc� Control 9.2.5 : Refer fa Section . Tha project Is ex p
clearing and grading permit requirements, the project will still be responsible for mitigating offsite
rxlpacts and will 0 so with to Oard sediment controls that address site specific co ditions, - I � e c4
�4
+�Lil c\'VtIn.-Operations
'ii 1"
nr�
ll t f tk� I f u
6. Maintenance (1.2.6�: Refer to Section XI. iheproposed star��'' d� falnage sysfem gill pf-OU1A�
V be owned, gperated, and maintained by the tenant or owner. j, D �':{.;�' Otll %r I
L7. Financial Guarantees and L.iahilitZ L1.2.7): The owner, tenant, and contractor will obtain all
necess�� permits prior to t b,pgrinirl of copall
ction. hp� 4-;�Obd [,01,ri COG
t t'[ 1 �S 'firs �. 7 1') �r�[ t 1r7 �� . .,� C�{7 Gc' C �C�IJ b�C 4 , � i r `j, 7 ,'
8-. Water G u_iifl ii f'f:2:8� This project will ntt require any storm wat r quality treatment based on the y �,
KCSWDM ERR rription #1, the Surface Area Exemption, which requires that the project include less than
j 5,000 SF of new plus replaced pP�GIIS and less than 3l5,,0000'�SjF of
Pf (GAP Refe/r�tol�Se9tion IV.. .2,
le bk ��W_' r `� " L u,14, I ' �V L'[.�� �1 `�;�{
Special Requirements • �� W � �'� �"'l � � � j �ftT �' N r
Special Requirement # .Other Adopted Area -Specific Requirements Section 1.3.1��
■ Critical Drainage Areas (CDAs): No known critical areas. LL
• Master Drainage Plans (MDPs): Not applicable.
• Basin Plans (BPs): The project is located within the Hylebos Creek Watershed (see Figure 3}. _
• Lake Management Plans(LMPs): Not Applicable —Ili ed #� , G, eMel
a ( ,
• Shared Facility Drainage Plans(SFDPs); Not Applicable 6.1 �j ft jl 1 I)e G �i
Special Requirement #2. Flood Hazard Area Delineation, Section 1.3.2: Site is not located near AfloodTaf4,
area.
j Special Requirement #3. Flood Protection Facilities, Section 1.3.3: Not Applicable
t�.�,�
Special Requirement #4. Source Controls, Section 1.3.4: See attached Activity Worksheet and Required:'
BMP's.
Special Requirement #5.Oil Control: Minimal traffic is anticipated in this area. No oil control is required.y
COUGHLIN PORTERLUN DEEN Seattle Children's Hospital — South Sound Clinic
3 Federal Way
Project Specific Requirements:
There are no additional requirements for this portion of the project. Design and construction will abide by
requirements set forth in these documents and the City of Federal Way.
III. OFF -SITE ANALYSIS
This project is not required to perform a full off -site analysis because it meets KCSWDM Exemption #3
(KCSWDM 1.2.2). This exemption states that a project is exempt if it does not change the rate, volume,
duration, or location of discharges to and from the project site. Because this project will not be making any
adjustments to the stormwater management system and does not require increase in any impermeable
surfaces, it will not increase the rate, volume, duration or location of discharges. Refer to Appendix A for the
downstream figure. :A- � C1 PJAC F71'
LZ
T1. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
Existing Site Hydrology (Part A)
The existing site consists of paved parking lot and the retail structures that will remain. These conditions are
summarized in Table 1 below. ,
Table 1- Existing Site Conditions Area Breakdown ct• ' �� G •,.��
Land Cover Area (SF) Description
Impervious Area 4,830 Parking lot and concrete walkways
Pervious& Landscape 170✓ _Associated landscaping
Total Project Area 5,000 2 �C�c ;�:T Total site area
Percentage of Impervious Area 97.0%
Developed Site Hydrology (Part B)
The developed site hydrology will decrease the amount of impervious area by 1,140 SF. A summary of the
basin information is shown in Table 2.
fie. `'G"
Table 2 - Developed Site Conditions Area Breakdown
Land Cover Area (SF) Description
3,690 Building roof, asphalt and co cRt"
o
Impervious Area walkways ; �. " fai) iac
Pervious & Landscape 1,310 _ Associated landscaping �(�t1G ! I
Total Project Area 5,000 7 0057, Total site area
Percentage of Impervious Area 73.8% 4 P-P—ftoth
COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic
4 Federal Way
Performance Standards and Flow Control System (Parts C and D)
Based on the flow chart (CFW Addendum to the KCSWDM) included in Appendix B it was determined that this
project requires a full drainage report. The area that the project is in is considered Basic Flow Control
a&&ording to the-KCSWDM definition: Basic Flow Control Areas refer to areas that discharge to a closed
conveyance system, which discharges eventually to water bodies that are designated as major receiving
waters. The facility requirement in Basic Clow Control (KCSWMD section 1.2.3.1 A) is waived for any threshold
area in which the target surfaces subject to this requirement will generate no more than a 0.1 cfs increase in
the exising site conditions 100-year peak flows. This project does not increase the 100-year peak flows from
the existing conditions. The site was analyzed with Forest as the existing condition, which only created an
increase in the 100-year peak flows of 0.04 cfs (refer to Appendix C for the a summary of the KCRTS
calculations).. f � I S ;�� f
/� s i J G>vi Cl� r
bt� e, X��L� rd.,
Water Quality System (Part E)
This project was determined to be redeveloped as defined by the CFW Addendum to the KCSWD
Redeveloped is defined as "the repair or replacement of impervious surface that is not part of routine
�b maintenance activity or disturbing activities associated with impervious development." Based on core
requirement #8 of the KCSWDM this project is required to provide water quality treatment, however this project
meets Exemption #1. Exemption #1 states that any project with less than 5,000 SF of new PGIS that is not
fully dispersed, less than 5,000 SF of new plus replaced PGIS that is fully dispersed, and less than 35,000 SF
of new PGPS that is not fully dispersed is exempt from water quality treatment. Please refer to Appendix D for
the pre and post developed conditions.
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
No analysis of conveyance capacity is required for this project because the project is using only the existing
storm system and will not create new flow conditions.
VI. SPECIAL REPORTS AND STUDIES
— Pc,rftl�?e- //LJ6661?�
A geotechnical report addressing site work is not applicable for this project. There is not a significant amount
of soil that w—i 156-- IsFuffied m the construction of this project because the site is already developed, and similar
conditions are being reinstalled. r +
`� 5 r'r�' 4;i ,`•—C �' oaf GAt
�C`*'1�- y��
VII. OTHER PERMITS -
This pro ect will require building and demolition permits from the City of Federal Way. No SWPPP is required
because the project is less than 1.0 acres. See Section 8 for the SWPPP related information.
COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic
5 Federal Way
VIII. CSWPPP ANALYSIS AND DESIGN
This section lists the requirements that would be used when designing a TESC plan. will be used when
designing the TESC plan for this site.
Standard Requirements
Erosion/Sedimentation Plan shall include the following:
1. Facilities required include: Catch basin filtersocks. (1.2.5-1). The project will provide sediment
protection at the existing catch basins and maintain existing hardscaped areas until areas will be re -paved
2. Timing - A construction phasing plan shall be provided to ensure that erosion control measures
are installed prior to clearing and grading. (1.2.5-1). Notes addressing each of these items will be
placed on the civil engineering plans.
3. Planning - Plan shall limit tributary drainage to an area to be cleared and graded. Delineate
dimension, stake and flag clearing limits (1.2.5-1). The clearing limits have been indicated on the
TESC plan. Notes addressing ihis item will be placed on the civil engineering plans.
4. Revegetation - Revegetate areas to be cleared as soon as practicable after grading. (1.2.5-1). Notes
addressing this item will be placed on the civil engineering plans.
IX. BOND QUANTITY, FACILITY SUMMARIES, & DECLARATION OF COVENANT
A Bond Quantity Worksheet is not applicable for this project.
A Facilities Summaries Sheet is not applicable for this project.
A Declaration of Covenant is not applicable for this project.
X. OPERATION AND MAINTENANCE MANUAL
Standard Maintenance
Per standards set forth in the King County Surface Water Design Manual, the owner or tenant will maintain
facilities. See Appendix E for the applicable standards for maintenance.
COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic
6 Federal Way
APPENDIX A
The existing storm system is sized for and conveys all stormwater south to a private detention system on an
adjacent property. The stormwater is then conveyed in Enchanted Parkway south to a main line in S 352nd St.
The stormwater then travels through an easement west to SR-99 and on south to the S 356`h St Regional
Facility. The following figure depicts the downstream of this project's stormwater.
COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic
7 Federal Way
F]
I
1
J
COUGHLIN PORTERLUNDEEN
STRUCTURAL • CIVIL • SEISMIC ENGINEERING
Project: JeaUle %-1111u[ viIt, 1 uzplwl - 4UUL.11 PWUIw LJeSI neu n vatc. -
Project No: C 140194-01 Client: ZGF Architects Checked By: JAJ
www.cplinc.com
APPENDIX B
FIGURE 1,12.A FLOWCHART FOR DETERMINING TYPE OF DRAINAGE RE'*1F' ' REQ IRED
Is the project a shngfa family rosids,rWO or ag►fcufluraf praiiecf that resulls
in :-2.000 sf of new andior repiaced impervious surface or -7.000 9f of
Sand disturbbing ac14*y, A►INO meei,s ona of the follovwng croerla`T
• The prefect results ire S 10,000 sf of total inVennous surface added siruce
1l4p1, _5.000 sf of 041W hwpwv surface, and _35.000 51 of nowpervibeus
surface (for RA, F, or A sites, now pervious surface is = 52,500 sf or
ramaindor of she If r65% is prese(vsd In native "petatlon ), OR
• The project results in 10,000 sf of total impervms surface added since
1*01 and new pervious surfiree Is <.36,000 - 3-26 x new knprrvious
sudece (far sips L122,000 sf, use 2 25, and far RA. F_ or A sites. Increase
by 50% or use remainder of situ if *5% is proseorved in rraltivo vegatatron),
OR
. The project results in -:4% total inipwv surface seed -:15% now pervious
surface on a ale parcel aim zoned RA or F. or a 'singler'multip+e parcel
site zoned A, and ate Impervlouts area + the s/de', excep410,000 sl of al, will
be seat back from naa,,ral locafion of site discharge at least 100 ft per
10,000 sf of total ImperAous surface?
fdo
Daps the prOjo teaull in ; 2,000 sf of
Now am'rr• roplacarl imparvl4us
surmco c- '•1 ' foew pervious
surface, OR Is me project a
re*v%fopmentproject on a parrol or
combination of parcels in which new
plus rgOacAed imporviou% surAwe
totals _5,000 sf and whose valuation of
proposed Irnpfovernwis (excluding
requwed r otigakm and frontage
improva~ts) is >50% of thin nswssed
value of existing empnovemems?
SMALL 3' RO.I ®C T DRAINAGE
REV"
13mocR 1.12A
Tj4aff~fflw.-r.6'
fatlolM1'l� :r•'•- ..... .: 1h51E1t'Y,
Yes
Does 11hr, project have the characmnsuca of one air more of the folWMng
aategoeles of prfjecls flee mare detailed lhfeshold language on D 1-15)'7
1- "acts containing or adjacent to a ftod, erosion, or steep slarpe
hazard area. profWs within a Grfbcsl Drainage Area or Lan"Ide
Hazard DraimKa Area: of projects that propose c7,000 aI (1 ac of
project is In Small Project prainage Review) ad lend disturbing
asmfvify
2_ Projects proposing to construct ormodffy a drainage pipe.iditch than
Is 12" or largw or receives runoff from a 12" or Barger drainage
pi pe;ditch
3. Redev4opnN wt pngeeft proposing e$l00,000 in Improvernam to
an existing Ngh•use sift.
Reassess whelhef
dralnrQe revvew is
required per Section
1-1,1 (p 1-9)
Is the project an Urban Planned DevetDp nt (UPD). OR
does rt remA In -50 aefes of now bttper'viouuss surface 1.
within a 5ubbasin or muflVe subhasins that are
hydraulically connected, OR does It have a project sire ,50
acres within a crr7ical agwifiar rmha►ye area?
Yes
Yes
It
TARGETED DRAINAGE REVIEW
Ian 1.i,"
FUU. QRAIMAGE REVIEW
Sedan 1.1-134
LARGE PROJECT MAINIAGE
REVIEW
Sedlion 1.1.2A
COUGHLINPORTERLUNDEEN
0
Seattle Children's Hospital - South Sound Clinic
Federal Way
lei
APPENDIX C
KCRTS Peak Flow Calculations
KCRTS SETUP:
Time Series Information:
Sea-Tac, Scale=1.0, Time Step=60-minute, Data Type=Reducep/d
Existing Condition
Till Forest=0.115 acres
TOTAL=0.115 acres
Proposed Condition
/Till Grass=0.030 acres.
Impervious=0.085 acres
TOTAL=0.115 acres,
Peak Flows:
Flow Frequency Anal;sis
Tine Series _ale:predeu.tst
Prr- cct Location:Sc7l-Tac
---Annual Poak Flov Rntc-.---
Flov Rate Rank Tine of Peak
-'CP;)
0 G0f�7 Z 2 09.'01 8 00
1i GU2 7 1 06:'07 3,00
0 005 4 3/06/03 18:00
n GOO 8 12.23/03 19:00
0 003 6 1/05/05 8:OG
0 G06 3 1/18/06 20:OG
0.005 S 11/24/06 5:00
0 009 1 1/09•'08 9:00
Computed Peaks
Flow Frequency Anal^sis
Tine :Series Fslc~Pnstd�~~+-few
Pro3ovt L000.t;.an:Gea.-Tac
---Annual Peak F1ov Rotes --
Flom Rate Rank Tine of Peak.
(CFS)
D 023 c 21'09:01 2:00
0 1320 8 1!OSi02 16:019
0 G28 3 12/08i02 18:00
D G22 7 8;26/04 2:00
0 026 4 10/28/04 16:00
D_G25 S 1/18/06 16:00
D.032 = 10 '26/06 GAG
o..0,46 1 1;09;08 6:00
Computed Peaks
CONCLUSION:
-----Flow Freggenc, Annivnis-------
- - Peaks -
- Rank.
Ret:arn
€rob
f l.r-; i
PST, rvi
0 00'9
1
IQO an
f�
990
U UUI
1
i", UU
D
ybU
0 006
3
10 00
0
9p0
0.005
4
5.00
G
800
0.005
5
3 00
0-0.667
0.003
6
2.00
0.500
0.002
7
1.30
0.231
0.00E
8
1.10
0
091
0.0019
S0.00
0
980
-----Flow FrcqgcncY Analy*i-------
- - Peaks -
- Rank
Retgrn
Prob
(1STI )
Pcricxf
0 046
2
100 00
G
940
U. 032
_
-s FIG
6.960
O.D28
3
10 00
G
900
0.026
d
5 00
3.800
O.D2S
5
3.00
G.667
0.023
6
2 00
0.500
O.D22
7
1.30
0.231
0.020
8
1 10
0.091
0.D41
So.00
G,980
Q11aG,,.,.,(0.046) - Q,,_r_3(0.009) = 0.037 CFS
0.037 CFS < 0.1 CFS �
Therefore, Detention is not required since the 100-year
peak flow rate for the proposed condition does not exceed
a 0.1 cfs increase from the existing 100-year peak flow rate.
9
CK•P1�77t�I.Ilililr�3s�1a7�:
10
Seattle Children's Hospital - South Sound Clinic
Federal Way
APPENDIX D
J �
�
COUGHLINPOR'
m
0
m
m
r
O
m
0
c�
0
z
0
O
z
TRLUNDEEN
Seattle Children's Hospital — South Sound Clinic
11 Federal Way
W
- I �
cn m
--Ix
�Cl)
0Z
C �
mCo
c
00
m
D_
Z
I
I
I
d
COUGHILINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic
12 Federal Way
I
J
APPENDIX E
Maintenance standards from KCSWDM Appendix A follow. Only standards that are pertinent to the storm
water system on or adjacent to the project site are included.
NO.5 -- CATCH BASINS AND MANHOLES
Maintenance
Defect or Problem
Condition When Maintenance is Needed
Results Expected When
Component
Maintenance is Performed
Sump of catch basin contains no
Structure
Sediment
Sedrmant exceeds wx of the dtGih from t5:e
i>gltc>m or Ihr, r.,rtch basin In Ihr. invert of the
:;adimr-nl
'lest h+irx into or opt ;if the catch basin or is
wltn.n 6 niches of trf invert of the lcrrresl pipe
::"14 V ntit rf rhr- rslch Winn
No Trash or debris biockii-4 or
Trash and debris
Trasn or debts of more lhan '.-; cubic foot whlcn
iminrdi ately tr-, reo-ni or Ihr. t:;itch b;e:;in
polertt;,elly i:•ln::k 1l4 entranve! In
operinq or is blocking rapacity or the catch basin
catch basin.
by more than 1!,',•=.
Tres'. or Ceb -s.- 7 the ralrh basin that exceeds
No Irash or debris it-, the catch basin.
�!+ the depth from the boi'tun-I of basin to invert lfic
"vreirsl fs fir. into nr 7::1 of Ihr. i.anin
Dead animals or vegetation that cool;, generate
No dead animals or ': E-getatiur,
!;,for:; Ih;Yt ra1:k: cau .t! curnplainiS ❑r danprmin;
present wilhln !:;Af:h hanin
vies (e.,., methane).
Dtepu:lts; of yarhage.. r-xcetwJinrg t ::ohic font in
No rendition fire:rnl'Jrhlc-h wn;,+
volume
altract or support the breeding of
Insects or rodents.
Damaga to frame
Corner of frame extonds more liar '>= inr^. pall
Frame is even with curb
and; or top slab
curb face Into, the street (If applicable I -
Top slab ras naes :je er than 2 Square inches or
Top slab is free of holes and rrad�s
rrau{s w dc-r tnw, ", 111Ch.
Frrrre not. siting ffcsh ;,n t-ap slab, i_o ,
Frame is silting flush on top slab.
separat+or, of rrore V!w^ ?: inc_'w of the frame from
Ihr top slab.
Cracks in walls or
C racSS wder tray 1i1 Inc,, and ro^sac tra*, 3 feel,
Catch basin Is sealed and
t kt en
: ny evldeilCY_ or srl partiielr.N errt•>rlrra catch
structurally "sound
oasin 1hrouph Cracks, or mainlenanre person
�acges that catch basin is unsound.
Crank., %%i&r F=a,, ,t inrn and ofs• t'r_an 1 foot,
No cracks more than 'l, inch wide y,
at the ;olnt of any ,rreUc-Aet pipe or any evda^ce
the }dint of lnlelloutlet pipe -
,A Noll particles ehleririy :;itch basin through
corks
&011Y•rricnU
Catch va3in has settled (,.Yole Man 1 inch or Itas
Bashi r_plated or repaired to design
misali ,r-nont
rotated mare t:rat 2 irchns out of alignmerq
standards
Darciaged pipe k_, aits
CrijcRs eider than YrielrlY at the ;»!`i of 111d
No tracks, rilbfe Won ,S-inch voicit sl
T,'rllocllrt pipes or any rvidrnrv, of s-)il rntrrin7
the•, jpird of inlrlloullct pip, s,
the catch basin at the joint of the iniet'oullet
D=0/_ S.
Contaminants and
Any evidence of r-omameranis or pollution such
Materials removed and disposed of
FYNIutlon
as o.:, o2soline, concrete slurnt,s or paint.
according to applicable rayulatiuns_
$purr,, rrntrol ElMPs implomr.-nl,d if
appropriate- No contaminants
pfesdrit other thin a surface oil filfrj_
Inleti'9utiet Pipe
Sediment
Sec,ment Ming 20">v or mar_ of t^e pipe.
Inlatioutlel pipes clear of sadimenL
acourllulal.on
Trash and debris
Trasr and debris accLmulate•d in inletloutlet
No trash or debris in pipes.
aes I,ntludes noalables and non-Iloalables1
Darnagad
Crac'.ss wd2r tram ': 1^ch at the ; a rl of the
No cracks more than ',-inch wide at
_:-£'ll'JuIICt pipes- or any `_viclefic'e of s,oi: erlttring
the j:,1111 of Me 11'11elioullet pipe
al thc oinls of thr inlet'nutlr..I pipes
COUGHLIN PORTERLUN DEEN Seattle Children's Hospital — South Sound Clinic
13 Federal Way
-1
NO. 5 - CATCH BASINS AND MANHOLES
Maintenance
Defect or Problem
Condition When Maintenance Is Needed
Results Expected When
Component
Maintariance is Pi-rfarmad
1-11-1°-31C gra:e c�,nerrtrig
ale vein opuriingviider *har,
Grate rric0s dcsr_!-,
Trash and,jt:,�-ns
Trwi and r1iLn,1:5 That IS bloc-J119 More 11130 LJ7o
Grate free of 1rasn and =5tn5.
fanfr-:)l(! la
Cparrageej or missing
'_tale mis Bing ^,,, broker: rneniberis:, of L,.-E gratt:.
(-'rate iB ;r, place and mec-5 design
Any open strurture requires Urgent
inalritenance
Manhole Ca,�erjl-id
-Co-,=r,lid ncl n plarz
r5 missing or only partially In place-
Covedid proiecls opening lo
Any apon structure requires urgent
f; t r. t-,, f �,
maintenance.
L-74J.nq rr-•-chanisrn
Mec.--97-3rr r-3^. Dl ,-. ripened Ly 5=
Mernqrysrn opens -.0h prDpE r tz.,-s.
Not ,0k-ndng
naintt,.-r-an:kl Person with proper lools. Lens
ciii-inn( bf! s,!;il t::a nit
work.
1:)
D';t! M:W:jL!ri;irir:e pvrnw; rwrinvi!
Crww.liul ;in be rcrrinverl w-,i'
-Rr
-o-o-v-1id aftzr appl,,--cg, 80 fv5, of lift
by one m n.qnco
aint,
Ders,311-
NO. 6 - CONVEYANCE PIPES AND DITCHES
Maintenance
Defect or Problem
Conditions When Maintenance Is Needed
Results Expected When
Component
Maintenance is Performed
vvatE-, rueds l"C'E -y Through 5.
Plpeq
$ed,Cllel7t &
Accawnulatfc or �&bri that oxreds
pf ffm
VtatE:,, fvies trEE,v through P1-,_-;-
roots
yEIaGsr.-roots that reduce fiElE 1T,b%e1T-,&nl f
FinckX:h, pillim
'-'ontafninant- 39C
Any 3videnre of co.n1arrr-anis or p,:,lUlon SULK
Matcr:-wI& removcd and Cispcsf-d -34
vwmlirw r::,rz:rt!ij^ sJurriit.n w piiw-
;ipplicablt: rC!yL1l;11
mntry BV.Ps implemented if
Na untzmlnanta
Darrag-a L, pruteAve
P:-,1,cr.fv,,e cc,-=Iing �B I-Emagud: rust or corrosion
Fl:c,,r- repaired Gr replacf��.
u;'jhn Dr
vji�;jkwitn,.: 1;w 5*wwril k"It!yritq .,:I VV F::Ir! cs'
pipe
AT-.-y dual lll;jt ihjur";-w;w. G;i! -nu;-j :)I
Rpe :)r wribict-4.
pipe by rr,-e tma^ 2V,, 7, is rlet,?-nined to ra-en
vocaker_-! Structural mleqfity c4
Tr-,i-,7 and corn;
Tr-,i-,-'n and cez�yis ;,, xrv4:,,,;-5 I foot per :.000
7ra&, and 1m7,15 rlearnd frorn
square leet of ditch an-1 sl*pes.
Sao lrnl
-r�xn u I at c-4 -;F cm -j n t trot c, x r. c. 2:", of f r- E,
pit.-,h dqanrrl,flur hed all --3dirnonl
a-3ign aEDIK
an,M debris s-, trial a matchers dasign.
Nnxi� ,j s woods
Airy r,,xiotm or mu-nanc.2 v4;,7p3l-a[—,r- vvv7.h may
Nnx:.-ju!5 nUi---;FM7?1 vc.q,,trlirn
a hazcr, L� f - �--,vn ly pefE,:-v-1z! or IN
rE-mo..-Co ac-onjing to applicable
N:1 LJNr1yQr If 1--:,A(11.1&
-,?oqok--Minn vihore County -7onnol
oftr* public rroort normally be.
2nnl, nnt,�7 -ir-4
imirq
An-v ;;virinnr�l of r-rlarrx,�lnln or p:, . -h
'Hizinn Nijr
mririvr� and �i-jpr, --..d e
lil� A- - !: F - f
pCdlutlon
-3 2,A, •g-asolin-, concrete slurries or painL
t,. applic;ble rcgulauons.
BMPimplCrDmIt!d if
F;pprDprmn No -ont.iiinant!i
present atrEr than a surface oil 'ilm-
of watz.-
*,irr-rf,7w,� 17!P.4ry il-irmigh
Through •z lGhc
.jo
,7r-�4,Aon r
,fry on n rliv.h !;Iopc,
S1;-,-,,::-.!7 7irn- not Prodinq
slopes
Rnr-k nut of
Cv-., lay^r or 1'."!s nfrncx nxi.-A!3 -ihr3-;p nalrk-r- roil
Rnplacc, rnr.Kr iD deni,?n rlindarrl!7.
Glace it rnss�rg df
s.r�q G square feet or more, an-, ekpOSed Ala -..I',=
�ir_:9L71e'I
soil.
COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic
14 Federal Way
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance
Defect or Problem
Conditions When Maintenance Is Needed
Results Expected When
Component
Mainlommnco is Performed
Trash and debrts cleared from srte
Site
Trash or litter
Any Trash and debris which exceed 1 cutic foot
P,r i.s:M'r."i v1t::nr fitt•.i I,Ihis is ;rbnuk equal In the
amount of trash it would take to fill up whe
sta_ aafd, s•2e office garN ge rani. In general.
lhrrr, n hould br no vi-qual rvitdnnuv of duriping
Noxious weeds
Ary noxious or nursancP vegelator, wn-- Il may
Noxious and nuisance vegetation
cnnslit.ar a h;Vice6 kQ Coiw ly prrnexim-f nr Mr..
remnvrrd ncrarding In applicable
M E-4C,
repulallons. ko danger of noxious
vegetation where County pf_fsonnel
x thr public: mlghI norm lly be
Contaminants and
Any evidenc-e of rr rlam ^ants or pollution such
Materials removed and disposed of
fxdlulinn
.!; <>:-, c;:exnline cnnr:retr aurrics nr paint
arc:;n9itx3 kn;tF)plicabhe reyulalinnrt
Source control BMI's implemerLed if
appropriale_ No contaminants
prr_gent other khan :r surfers. nil film
Grass: groundrr•ver
Grass or grclyd UYer exceeds 1 a ^ehes in
Grass or grour6co. cr nwdoed to a
ht.s.1
ireRzhl nr. grmiker than d inrhes.
No hazard trees In fao,lmr.
Trees and Shrubs
Hazard
Any tree x Ilrnb of a tree :Ce-•rtihed as hav,rg a
Tx;lentxa I:r fall and i:ause property aaJnagc; �r
threaten, human life. A hazard tree identifeed by
a qualihAd arbanst mast be removed as soon
as possibl4.
Damaged
L'mbs or Darts of te-es or v ri os that are split or
Trees and shrubs with less. than 51%
bratien which allecl Mole Than 252.;6 of L4 b c nal
:A total fuhage with Split or broken
fnlimr of ihr.. Irrr or >^nrn
irnh5,
Trees or shrubs Ural •t'.a:gc L`e'^n blown down or
No bkrrnl d wn vegeLalion
Rnnr;md c}vnr
knnrkrd rvr..r vrgrtalion Trim or
shrubs tn8e of Injur f.
Trrr, nr shrub* wftich ace not. ndrgw*.fy
Trrr. or 5hnjb in plai:r: and
supportEc or srs leaning over, cat:sing expofitlr{.
adequately sucported- dead G'
of the
diseased trees removed.
JCOUGHLIN PORTERLUN DEEN Seattle Children's Hospital - South Sound Clinic
15 Federal Way
FIGURES
Figure 1 - TIR Worksheet
Figure 2 - Site Location
Figure 3 - Drainage Basin Map
OXA11J
0 FA IA'A6F k -j-,w
a
I COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic
•.J 16 Federal Way
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Tenant:
Seattle Childrens' Hospital
Address:
4800 Sand Point Way NE
Seattle, WA 98105
Phone:
206 987-2000
Project Engineer:
Alan Jacobson, P.E.
Company: Coughlin Porter Lundeen
Address/Phone: 801 2"d Ave, Suite 900
Seattle, WA 98104
206 343-0460
Part 3 TYPE OF PERMIT
APPLICATION
❑
Subdivison
❑
Short Subdivision
❑
Grading
❑
Commercial
®
Other:
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name:
Seattle Childrer
Location
Township: 2
Range: 4
Section: 2
Part4 OTHER REVIEWS AND PERMITS I
❑
DFW HPA
❑
Shoreline Management
❑
COE 404
❑
Rockery
❑
DOE Dam Safety
❑
Structural Vaults
❑
FEMA Floodplain
❑
Other
❑
COE Wetlands
Part5 SITE COMMUNITY AND DRAINAGE BASIN
Community:
Federal Way, WA
Drainage Basin:
Hylebos Creek Basin
Part 6 SITE CHARACTERISTICS
❑
River
J❑
Stream
❑
Critical Stream Reach
❑
Depressions/Swales
❑
Lake
❑
Steep Slopes
❑
Floodplain
❑
Wetlands
❑
Seeps/Springs
❑
High Groundwater Table
❑
Groundwater Recharge
❑
Other
J
Part 7 SOILS
Soil Type
N/A
Slopes Erosion Pot(
❑ Additional Sheets Attached
Part 8 DEVELOPMENT LIMITATIONS
REFERENCE
Ch.4 — Downstream Analysis
❑ Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
® Sedimentation Facilities
® Stabilized Construction Entrance
® Perimeter Runoff Control
® Clearing and Graing Restrictions
® Cover Practices
® Construction Sequence
❑ Other
LIMITATION/SITE CONSTRAINT
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
® Stabilize Exposed Surface
® Remove and Restore Temporary ESC
Facilities
® Clean and Remove All Silt and Debris
® Ensure Operation of Permanent Facilities
❑ Flag Limits of SAO and open space
preservation areas
❑ Other
Part 10 SURFACE WATER SYSTEM
❑
Grass Lined
❑
Tank
❑
Infiltration
Channel
❑
Vault
❑
Depression
❑
Pipe System
❑
Energy Dissapator
❑
Flow Dispersal
❑
Open Channel
❑
Wetland
❑
Waiver
❑
Dry Pond
❑
Stream
❑
Regional
❑
Wet Pond
Detention
Brief Description of System Operation
N/A
Facility Related Site Limitations
Reference
N/A
Facility
Part 11 STRUCTURAL ANALYSIS
❑ Cast in Place Vault
❑ Retaining Wall
❑ Rockery > 4' High
❑ Structural on Steep Slope
❑ Other
N/A
Limitation
Method of Analysis
Compensation/Mitigati
on of Eliminated Site
Storage
Part 12 EASEMENTS/TRACTS
❑ Drainage Easement N/A
❑ Access Easement
❑ Native Growth Protection Easement
❑ Tract
❑ Other
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision my supervision have visited the site. Actual site
conditions as observed were incorporated into this worksheet and the attachments. To the best of
my knowledge the information provided here is accurate.
COUGHLIN PORTERLUNDEEN
STRUCTURAL • CIVIL • SEISMIC ENGINEERING
Figure 2 -Site Location
Proica. Seattle Children's - South Sound Clinic
Designed By: RGL
Date: 05/30/ 14
Project_ No: C 140194-01 Client: ZGF Architects Checked By: JAJ
801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206.343.0460 / cplinc.com
COUGHLIN PORTER LUNDEEN
STRUCTURAL • CIVIL • SEISMIC ENGINEERING
OAT,
1, Alle
f21
33rdSTNE
•� r
PROJECT LOCATIO
Y_ I;
R:�2Hkz�swm��l owCbntroi�fk�titiC ontrol . ml[d
5 272nd ST r .1 1
ce5
dome--
! I = `
■rd� _ f:iLa.ii en S 288th 5T
6 r 1 1•, 1 '-
' Mill
■� Basin
City of
Federal Way
Flow Control
Applications
Map
Legend
Drainage Basin Boundary
`;trey ms
LCity Limits
Lakes and Wetlands
Flow Control
Basic Flow Control 'areas
- Conservation Flow Control Areas
- Flood Problem Flow Control Areas
Major Receiving Waters
1. Puget Sound
Map Date: February, 2010
SWM Division
City of Federal Way
33325 8M Ave S
PO Box 9718
Federal Way, WA 98063
(253)835-2700
www.cttyofrederalway_com
Figure 3m. Drainage
Basin Map
C_ .I_ r'L.:I.4.. ..1 L.L. ..;+-I C�imii rlinir
Project: r— ---- --- -
Project No: C 140194-01 Client: ZGF Architects
o... RGL n.. - 5/30/2014
Checked By: RAJ
www.cplinc.com