Loading...
14-102547 (2)CITY OF Federal Way July 8, 2014 ZGF Architects, LLP Attn: Taka Soga 925 4th Ave, Suite 2400 Seattle, WA 98104 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway. com RE: Permit #14-102547-00-CO; SEATTLE CHILDREN'S SOUTH SOUND CLINIC 34920 ENCHANTED PKWY S Dear Mr. Soga: The Public Works Department has reviewed the civil engineering plans for the above -referenced project. Prior to permit approval, please have the civil engineer address the following comments: 1) A storm drain cleanout should be installed as part of the new roof drain connection shown on Sheet C 2.00. Please show this cleanout on the plan and provide the (enclosed) City Standard detail on the detail sheet. 2) Catch basin protection (CB inserts) shall be provided in each of three (3) catch basins in the vicinity of the building for temporary erosion and sediment control (TESC) during building demolition and construction activities. Please show these as part of the demolition plan (see enclosed), and provide a detail on the detail sheet. 3) Bonding is required for all TESC measures; however, since the TESC measures are relatively insignificant in cost, the City will only require a cash deposit be paid at permit issuance. The estimated deposit amount is calculated to be $500.00. This deposit will be refunded upon project completion and after the inserts have been removed. Please revise the civil plans as necessary, and re -submit 4 copies of the revisions. If you have any questions, please feel free to contact me at (253) 835-2734, or via e-mail at ke�in.pztersonlcr}c ityoffedera 1 way.co m Sincerely, 10'041�__ _ Kevin Peterson Engineering Plans Reviewer KP:jo enclosure qc7: Project file Day file Doc. I.D. COUG HLI N PORTERLUN D E E N STRUCTURAL CIVIL SEISMIC ENGINEERING 801 SECOND AVENUE SUITE 900, SEATTLE, WA 96104 / 206 / DATE / PROJECT 05/30/14 Seattle Children's Hospital South Sound Clinic / CLIENT / CONTENT ZGF Technical Information Report COUGHLINPORT ERLUNDEEN STRUCTURAI CIVIL SE ISM - ENGINEERING REPORT Technical Information Report Seattle Children's Hospital - South Sound Clinic 34920 Enchanted Parkway Federal Way, WA 98003 PREPARED FOR: SEATTLE CHILDREN'S HOSPITAL 4800 Sand Point Way Seattle, WA 98105 CONTACT / Sandy Miller PREPARED FOR: ZIMMER GUNSUL FRASCA ARCHITECTS 925 Fourth Avenue, Suite 2400 Seattle, WA 98104 CONTACT / Taka Soga PREPARED BY: COUGHLIN PORTER LUNDEEN 801 Second Avenue, Suite 900 Seattle, WA 98104 P 206.343.0460 CONTACT / Alan Jacobson, P.E., LEED A.P. 801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206 343 0460 / cplinc com TECHNICAL INFORMATION REPORT AND HYDROLOGIC ANALYSIS Seattle Children's South Sound Clinic Coughlin Porter Lundeen Project No. C140194-01 May 30, 2014 TABLE OF CONTENTS Section Page I. PROJECT OVERVIEW............................................................................................................................ 2 GENERALDESCRIPTION ........................... ................................................ ................ ........... ............ I............................. 2 EXISTING CONDITIONS........................................................... .......... ,............................. ........................... .......... 2 PROPOSED DRAINAGE SYSTEM..................................................................,.................._............................. II. CONDITIONS AND REQUIREMENTS SUMMARY.............................................................................. 3 KING COUNTY SURFACE WATER MANAGEMENT DESIGN MANUAL CORE REQUIREMENTS: . ............. ..................... 3 SPECIALREQUIREMENTS: ........................................ ­.. ­ . ................ ....... .......... ­ .............................................. 3 PROJECT SPECIFIC REQUIREMENTS: .................................................... _._ .......................... __ ........................ 4 III. OFF -SITE ANALYSIS.............................................................................................................................. 4 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ............................. 4 EXISTING SITE HYDROLOGY (PART A)............................................................. .......................... ......................... 4 DEVELOPED SITE HYDROLOGY (PART 13)............................................................................................................ 4 PERFORMANCE STANDARDS AND FLOW CONTROL SYSTEM (PARTS C AND D)............................................... 5 WATER QUALITY SYSTEM (PART E)...... .................. ................. ...- 5 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN........................................................................... 5 VI. SPECIAL REPORTS AND STUDIES.....................................................................................................5 VII. OTHER PERMITS.................................................................................................................................... 5 VIII. CSWPPP ANALYSIS AND DESIGN...................................................................................................... 6 STANDARD REQUIREMENTS .................................... ....... .................................................................. :........... -.... 6 IX. BOND QUANTITY, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ...................... 6 X. OPERATION AND MAINTENANCE MANUAL..................................................................................... 6 STANDARDMAINTENANCE.................................................................................................................................. 6 J J J J COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic J11 Federal Way LIST OF FIGURES Figure 1 - TIR Worksheet ................................................... .---............. Figure 2 - Site Location ...............--............................---........................-- Figure 3 - Drainage Basin Map ............................... ....................... Figure4 - Soils Map ................... .... ............. ........ —..- .............. ............. Figure 5 - Flow Control Map.................................................................... Figure 6 - Water Quality Map ............................................................... Figure 7 - 100-yr Floodplain Map.........................................................— Figure 8 - Sensitive Areas...................................................................... Figure 9 - Drainage Complaints Map.............. ......................................_.... LIST OF TABLES ..................................................17 -19 .......................... •........................-- 211 ........................................................ N.A. ........................................................ N.A. ........................................................ N.A. .................................................. N.A. ........................................................ N.A. ......................................................... N.A Table 1 - Existing Site Conditions Area Breakdown........................................................................................... 4 Table 2 - Developed Site Conditions Area Breakdown ......................... ................................ :............................ 4 COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic Ili Federal Way Ll I. PROJECT OVERVIEW General Description The following Technical Information Report (TIR) provides the technical information and design analysis required for developing the Drainage and Temporary Erosion and Sedimentation Control Plan (TESC) for the Seattle Children's Hospital (SCH) South Sound Clinic. The stormwater design for the project is based on the requirements set forth by the City of Federal Way (CFW) Addendum to the 2009 King County Surface Water Design Manual (KCSWDM) (See Figure 1 — Technical Information Report Worksheet). SCH South Sound Clinic is located at 34920 Enchanted Parkway in Federal Way (See Figure 2 — Site Location). The site currently consists of a retail center with 3 structures on one parcel (2192600570). Existing Conditions The existing site was previously used as a retail space with a majority of the area paved for parking and sidewalks or structures. , The only planting on the site is in planter strips in the parking lot and landscape islands in front of this former Circuit City building. The current storm system is sized for and conveys all stormwater offsite to an existing detention vault southwest of the project area, before discharging off -site into Enchanted Parkway. Proposed Drainage System The proposed site will result in over 2,000 square feet of new or replaced impervious and pervious area, which, per the CFW Addendum to the KCSWDM, requires a "Full Drainage Review" (CFW Adden�d�um o fthe /' f KCSWDM 1.1.1.A). 'go, I Fr���c��js%C)e)e) � �C• 1tC/C�I(��1�1���I�� •'Y�� It was determined that no flow control facilities will be required for this project based on Exemption #1 from the KCSWDM. This exemption states that flaw co-n rai wilf not be required unless the peak flows from the t 100 year storm increase by more than 0.1 cfs from predeveloped conditions. See Section IV for more information o floy cor�tr .1 re uirements. '� ,' �c�`,L - , q � & v, -�C� t +W� f �� C [" c��/odc���; The project area will not reduire storm water quality treatment based on the Exemption #1 the Surface Area Exemption, from KCSVVDM. This exemption requires that tie project includes less than 5,000 SF of new plus replaced PGIS and less than 35,000 SF of PGPS. See Section IV for more information on water quality treatment requirements. ,,-r7 To -7,P—FATAX ly / A�p jal. G ( Fk" r mac:" COUGHLINPORTERLUNDEEN 2 Seattle Children's Hospital — South Sound Clinic Federal Way CONDITIONS AND REQUIREMENTS SUMMARY This section will address the requirements set forth by the Core and Special Requirements listed in Chapter 1 of the KCSWDM and the amendments set in place by the CFW Addendum to the KCSWDM. King County Surface Water Management Design Manual Core Requirements: ^� ��' �tsclaarpe at the Natural Location (7.2.?): ,This requirement is met due to the fact that all of the site's L� dieveloped-f lows -will -follow -the -existing storm water path. This Rroject will not be making any —� adjusts to the existing storm ter,tln n eXn n s stem. L, 9 Off --site Analysts (9,2.2} This project does not require a full off -site analysis because it meets Off-site which states that any project that does not change the rate, volume, duration, or locations of discharge do not require off -site analysis. Thi pro ect does no a0d any n w� If�permeable urfaces and therefore meets this exern5ion. � �' I �i� G �? �rl30 Pj 3 � �trot 1. This project does not require any flow control based on KCSWDM Exemption #1 rf oamih­e-K�SWDM-which states that a flow control structure will not be required unless the peak flows ' from the 100 year storm increase by more than 0.1 cfs from p'radeveloped conditions. See Section p --rr �{ for more infor+oration on flow pontrol requirements. iIVY/�y �r�� �1 `Ij Oi Lj �GG�Gc,1-i��-L �.trl�`�� �]� �{ ]"r �I ip�. S onvevahceystem (12. No analysis of conveyance Sys ca�acr y Is r� ifi�ed for this project locyd, *4J because no new flow conditions are being created. The existing storm system will remain in place a d e�rea o • Impermeable surface is not being increased ,� � E,�,� �_hi"7 � � �6� f�.�-' cx �c- "Area Ad . c ���`��''"`�o�,`�1 rasion and Sedimentatroc� Control 9.2.5 : Refer fa Section . Tha project Is ex p clearing and grading permit requirements, the project will still be responsible for mitigating offsite rxlpacts and will 0 so with to Oard sediment controls that address site specific co ditions, - I � e c4 �4 +�Lil c\'VtIn.-Operations 'ii 1" nr� ll t f tk� I f u 6. Maintenance (1.2.6�: Refer to Section XI. iheproposed star��'' d� falnage sysfem gill pf-OU1A� V be owned, gperated, and maintained by the tenant or owner. j, D �':{.;�' Otll %r I L7. Financial Guarantees and L.iahilitZ L1.2.7): The owner, tenant, and contractor will obtain all necess�� permits prior to t b,pgrinirl of copall ction. hp� 4-;�Obd [,01,ri COG t t'[ 1 �S 'firs �. 7 1') �r�[ t 1r7 �� . .,� C�{7 Gc' C �C�IJ b�C 4 , � i r `j, 7 ,' 8-. Water G u_iifl ii f'f:2:8� This project will ntt require any storm wat r quality treatment based on the y �, KCSWDM ERR rription #1, the Surface Area Exemption, which requires that the project include less than j 5,000 SF of new plus replaced pP�GIIS and less than 3l5,,0000'�SjF of Pf (GAP Refe/r�tol�Se9tion IV.. .2, le bk ��W_' r `� " L u,14, I ' �V L'[.�� �1 `�;�{ Special Requirements • �� W � �'� �"'l � � � j �ftT �' N r Special Requirement # .Other Adopted Area -Specific Requirements Section 1.3.1�� ■ Critical Drainage Areas (CDAs): No known critical areas. LL • Master Drainage Plans (MDPs): Not applicable. • Basin Plans (BPs): The project is located within the Hylebos Creek Watershed (see Figure 3}. _ • Lake Management Plans(LMPs): Not Applicable —Ili ed #� , G, eMel a ( , • Shared Facility Drainage Plans(SFDPs); Not Applicable 6.1 �j ft jl 1 I)e G �i Special Requirement #2. Flood Hazard Area Delineation, Section 1.3.2: Site is not located near AfloodTaf4, area. j Special Requirement #3. Flood Protection Facilities, Section 1.3.3: Not Applicable t�.�,� Special Requirement #4. Source Controls, Section 1.3.4: See attached Activity Worksheet and Required:' BMP's. Special Requirement #5.Oil Control: Minimal traffic is anticipated in this area. No oil control is required.y COUGHLIN PORTERLUN DEEN Seattle Children's Hospital — South Sound Clinic 3 Federal Way Project Specific Requirements: There are no additional requirements for this portion of the project. Design and construction will abide by requirements set forth in these documents and the City of Federal Way. III. OFF -SITE ANALYSIS This project is not required to perform a full off -site analysis because it meets KCSWDM Exemption #3 (KCSWDM 1.2.2). This exemption states that a project is exempt if it does not change the rate, volume, duration, or location of discharges to and from the project site. Because this project will not be making any adjustments to the stormwater management system and does not require increase in any impermeable surfaces, it will not increase the rate, volume, duration or location of discharges. Refer to Appendix A for the downstream figure. :A- � C1 PJAC F71' LZ T1. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Existing Site Hydrology (Part A) The existing site consists of paved parking lot and the retail structures that will remain. These conditions are summarized in Table 1 below. , Table 1- Existing Site Conditions Area Breakdown ct• ' �� G •,.�� Land Cover Area (SF) Description Impervious Area 4,830 Parking lot and concrete walkways Pervious& Landscape 170✓ _Associated landscaping Total Project Area 5,000 2 �C�c ;�:T Total site area Percentage of Impervious Area 97.0% Developed Site Hydrology (Part B) The developed site hydrology will decrease the amount of impervious area by 1,140 SF. A summary of the basin information is shown in Table 2. fie. `'G" Table 2 - Developed Site Conditions Area Breakdown Land Cover Area (SF) Description 3,690 Building roof, asphalt and co cRt" o Impervious Area walkways ; �. " fai) iac Pervious & Landscape 1,310 _ Associated landscaping �(�t1G ! I Total Project Area 5,000 7 0057, Total site area Percentage of Impervious Area 73.8% 4 P-P—ftoth COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic 4 Federal Way Performance Standards and Flow Control System (Parts C and D) Based on the flow chart (CFW Addendum to the KCSWDM) included in Appendix B it was determined that this project requires a full drainage report. The area that the project is in is considered Basic Flow Control a&&ording to the-KCSWDM definition: Basic Flow Control Areas refer to areas that discharge to a closed conveyance system, which discharges eventually to water bodies that are designated as major receiving waters. The facility requirement in Basic Clow Control (KCSWMD section 1.2.3.1 A) is waived for any threshold area in which the target surfaces subject to this requirement will generate no more than a 0.1 cfs increase in the exising site conditions 100-year peak flows. This project does not increase the 100-year peak flows from the existing conditions. The site was analyzed with Forest as the existing condition, which only created an increase in the 100-year peak flows of 0.04 cfs (refer to Appendix C for the a summary of the KCRTS calculations).. f � I S ;�� f /� s i J G>vi Cl� r bt� e, X��L� rd., Water Quality System (Part E) This project was determined to be redeveloped as defined by the CFW Addendum to the KCSWD Redeveloped is defined as "the repair or replacement of impervious surface that is not part of routine �b maintenance activity or disturbing activities associated with impervious development." Based on core requirement #8 of the KCSWDM this project is required to provide water quality treatment, however this project meets Exemption #1. Exemption #1 states that any project with less than 5,000 SF of new PGIS that is not fully dispersed, less than 5,000 SF of new plus replaced PGIS that is fully dispersed, and less than 35,000 SF of new PGPS that is not fully dispersed is exempt from water quality treatment. Please refer to Appendix D for the pre and post developed conditions. V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN No analysis of conveyance capacity is required for this project because the project is using only the existing storm system and will not create new flow conditions. VI. SPECIAL REPORTS AND STUDIES — Pc,rftl�?e- //LJ6661?� A geotechnical report addressing site work is not applicable for this project. There is not a significant amount of soil that w—i 156-- IsFuffied m the construction of this project because the site is already developed, and similar conditions are being reinstalled. r + `� 5 r'r�' 4;i ,`•—C �' oaf GAt �C`*'1�- y�� VII. OTHER PERMITS - This pro ect will require building and demolition permits from the City of Federal Way. No SWPPP is required because the project is less than 1.0 acres. See Section 8 for the SWPPP related information. COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic 5 Federal Way VIII. CSWPPP ANALYSIS AND DESIGN This section lists the requirements that would be used when designing a TESC plan. will be used when designing the TESC plan for this site. Standard Requirements Erosion/Sedimentation Plan shall include the following: 1. Facilities required include: Catch basin filtersocks. (1.2.5-1). The project will provide sediment protection at the existing catch basins and maintain existing hardscaped areas until areas will be re -paved 2. Timing - A construction phasing plan shall be provided to ensure that erosion control measures are installed prior to clearing and grading. (1.2.5-1). Notes addressing each of these items will be placed on the civil engineering plans. 3. Planning - Plan shall limit tributary drainage to an area to be cleared and graded. Delineate dimension, stake and flag clearing limits (1.2.5-1). The clearing limits have been indicated on the TESC plan. Notes addressing ihis item will be placed on the civil engineering plans. 4. Revegetation - Revegetate areas to be cleared as soon as practicable after grading. (1.2.5-1). Notes addressing this item will be placed on the civil engineering plans. IX. BOND QUANTITY, FACILITY SUMMARIES, & DECLARATION OF COVENANT A Bond Quantity Worksheet is not applicable for this project. A Facilities Summaries Sheet is not applicable for this project. A Declaration of Covenant is not applicable for this project. X. OPERATION AND MAINTENANCE MANUAL Standard Maintenance Per standards set forth in the King County Surface Water Design Manual, the owner or tenant will maintain facilities. See Appendix E for the applicable standards for maintenance. COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic 6 Federal Way APPENDIX A The existing storm system is sized for and conveys all stormwater south to a private detention system on an adjacent property. The stormwater is then conveyed in Enchanted Parkway south to a main line in S 352nd St. The stormwater then travels through an easement west to SR-99 and on south to the S 356`h St Regional Facility. The following figure depicts the downstream of this project's stormwater. COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic 7 Federal Way F] I 1 J COUGHLIN PORTERLUNDEEN STRUCTURAL • CIVIL • SEISMIC ENGINEERING Project: JeaUle %-1111u[ viIt, 1 uzplwl - 4UUL.11 PWUIw LJeSI neu n vatc. - Project No: C 140194-01 Client: ZGF Architects Checked By: JAJ www.cplinc.com APPENDIX B FIGURE 1,12.A FLOWCHART FOR DETERMINING TYPE OF DRAINAGE RE'*1F' ' REQ IRED Is the project a shngfa family rosids,rWO or ag►fcufluraf praiiecf that resulls in :-2.000 sf of new andior repiaced impervious surface or -7.000 9f of Sand disturbbing ac14*y, A►INO meei,s ona of the follovwng croerla`T • The prefect results ire S 10,000 sf of total inVennous surface added siruce 1l4p1, _5.000 sf of 041W hwpwv surface, and _35.000 51 of nowpervibeus surface (for RA, F, or A sites, now pervious surface is = 52,500 sf or ramaindor of she If r65% is prese(vsd In native "petatlon ), OR • The project results in 10,000 sf of total impervms surface added since 1*01 and new pervious surfiree Is <.36,000 - 3-26 x new knprrvious sudece (far sips L122,000 sf, use 2 25, and far RA. F_ or A sites. Increase by 50% or use remainder of situ if *5% is proseorved in rraltivo vegatatron), OR . The project results in -:4% total inipwv surface seed -:15% now pervious surface on a ale parcel aim zoned RA or F. or a 'singler'multip+e parcel site zoned A, and ate Impervlouts area + the s/de', excep410,000 sl of al, will be seat back from naa,,ral locafion of site discharge at least 100 ft per 10,000 sf of total ImperAous surface? fdo Daps the prOjo teaull in ; 2,000 sf of Now am'rr• roplacarl imparvl4us surmco c- '•1 ' foew pervious surface, OR Is me project a re*v%fopmentproject on a parrol or combination of parcels in which new plus rgOacAed imporviou% surAwe totals _5,000 sf and whose valuation of proposed Irnpfovernwis (excluding requwed r otigakm and frontage improva~ts) is >50% of thin nswssed value of existing empnovemems? SMALL 3' RO.I ®C T DRAINAGE REV" 13mocR 1.12A Tj4aff~fflw.-r.6' fatlolM1'l� :r•'•- ..... .: 1h51E1t'Y, Yes Does 11hr, project have the characmnsuca of one air more of the folWMng aategoeles of prfjecls flee mare detailed lhfeshold language on D 1-15)'7 1- "acts containing or adjacent to a ftod, erosion, or steep slarpe hazard area. profWs within a Grfbcsl Drainage Area or Lan"Ide Hazard DraimKa Area: of projects that propose c7,000 aI (1 ac of project is In Small Project prainage Review) ad lend disturbing asmfvify 2_ Projects proposing to construct ormodffy a drainage pipe.iditch than Is 12" or largw or receives runoff from a 12" or Barger drainage pi pe;ditch 3. Redev4opnN wt pngeeft proposing e$l00,000 in Improvernam to an existing Ngh•use sift. Reassess whelhef dralnrQe revvew is required per Section 1-1,1 (p 1-9) Is the project an Urban Planned DevetDp nt (UPD). OR does rt remA In -50 aefes of now bttper'viouuss surface 1. within a 5ubbasin or muflVe subhasins that are hydraulically connected, OR does It have a project sire ,50 acres within a crr7ical agwifiar rmha►ye area? Yes Yes It TARGETED DRAINAGE REVIEW Ian 1.i," FUU. QRAIMAGE REVIEW Sedan 1.1-134 LARGE PROJECT MAINIAGE REVIEW Sedlion 1.1.2A COUGHLINPORTERLUNDEEN 0 Seattle Children's Hospital - South Sound Clinic Federal Way lei APPENDIX C KCRTS Peak Flow Calculations KCRTS SETUP: Time Series Information: Sea-Tac, Scale=1.0, Time Step=60-minute, Data Type=Reducep/d Existing Condition Till Forest=0.115 acres TOTAL=0.115 acres Proposed Condition /Till Grass=0.030 acres. Impervious=0.085 acres TOTAL=0.115 acres, Peak Flows: Flow Frequency Anal;sis Tine Series _ale:predeu.tst Prr- cct Location:Sc7l-Tac ---Annual Poak Flov Rntc-.--- Flov Rate Rank Tine of Peak -'CP;) 0 G0f�7 Z 2 09.'01 8 00 1i GU2 7 1 06:'07 3,00 0 005 4 3/06/03 18:00 n GOO 8 12.23/03 19:00 0 003 6 1/05/05 8:OG 0 G06 3 1/18/06 20:OG 0.005 S 11/24/06 5:00 0 009 1 1/09•'08 9:00 Computed Peaks Flow Frequency Anal^sis Tine :Series Fslc~Pnstd�~~+-few Pro3ovt L000.t;.an:Gea.-Tac ---Annual Peak F1ov Rotes -- Flom Rate Rank Tine of Peak. (CFS) D 023 c 21'09:01 2:00 0 1320 8 1!OSi02 16:019 0 G28 3 12/08i02 18:00 D G22 7 8;26/04 2:00 0 026 4 10/28/04 16:00 D_G25 S 1/18/06 16:00 D.032 = 10 '26/06 GAG o..0,46 1 1;09;08 6:00 Computed Peaks CONCLUSION: -----Flow Freggenc, Annivnis------- - - Peaks - - Rank. Ret:arn €rob f l.r-; i PST, rvi 0 00'9 1 IQO an f� 990 U UUI 1 i", UU D ybU 0 006 3 10 00 0 9p0 0.005 4 5.00 G 800 0.005 5 3 00 0-0.667 0.003 6 2.00 0.500 0.002 7 1.30 0.231 0.00E 8 1.10 0 091 0.0019 S0.00 0 980 -----Flow FrcqgcncY Analy*i------- - - Peaks - - Rank Retgrn Prob (1STI ) Pcricxf 0 046 2 100 00 G 940 U. 032 _ -s FIG 6.960 O.D28 3 10 00 G 900 0.026 d 5 00 3.800 O.D2S 5 3.00 G.667 0.023 6 2 00 0.500 O.D22 7 1.30 0.231 0.020 8 1 10 0.091 0.D41 So.00 G,980 Q11aG,,.,.,(0.046) - Q,,_r_3(0.009) = 0.037 CFS 0.037 CFS < 0.1 CFS � Therefore, Detention is not required since the 100-year peak flow rate for the proposed condition does not exceed a 0.1 cfs increase from the existing 100-year peak flow rate. 9 CK•P1�77t�I.Ilililr�3s�1a7�: 10 Seattle Children's Hospital - South Sound Clinic Federal Way APPENDIX D J � � COUGHLINPOR' m 0 m m r O m 0 c� 0 z 0 O z TRLUNDEEN Seattle Children's Hospital — South Sound Clinic 11 Federal Way W - I � cn m --Ix �Cl) 0Z C � mCo c 00 m D_ Z I I I d COUGHILINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic 12 Federal Way I J APPENDIX E Maintenance standards from KCSWDM Appendix A follow. Only standards that are pertinent to the storm water system on or adjacent to the project site are included. NO.5 -- CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Sump of catch basin contains no Structure Sediment Sedrmant exceeds wx of the dtGih from t5:e i>gltc>m or Ihr, r.,rtch basin In Ihr. invert of the :;adimr-nl 'lest h+irx into or opt ;if the catch basin or is wltn.n 6 niches of trf invert of the lcrrresl pipe ::"14 V ntit rf rhr- rslch Winn No Trash or debris biockii-4 or Trash and debris Trasn or debts of more lhan '.-; cubic foot whlcn iminrdi ately tr-, reo-ni or Ihr. t:;itch b;e:;in polertt;,elly i:•ln::k 1l4 entranve! In operinq or is blocking rapacity or the catch basin catch basin. by more than 1!,',•=. Tres'. or Ceb -s.- 7 the ralrh basin that exceeds No Irash or debris it-, the catch basin. �!+ the depth from the boi'tun-I of basin to invert lfic "vreirsl fs fir. into nr 7::1 of Ihr. i.anin Dead animals or vegetation that cool;, generate No dead animals or ': E-getatiur, !;,for:; Ih;Yt ra1:k: cau .t! curnplainiS ❑r danprmin; present wilhln !:;Af:h hanin vies (e.,., methane). Dtepu:lts; of yarhage.. r-xcetwJinrg t ::ohic font in No rendition fire:rnl'Jrhlc-h wn;,+ volume altract or support the breeding of Insects or rodents. Damaga to frame Corner of frame extonds more liar '>= inr^. pall Frame is even with curb and; or top slab curb face Into, the street (If applicable I - Top slab ras naes :je er than 2 Square inches or Top slab is free of holes and rrad�s rrau{s w dc-r tnw, ", 111Ch. Frrrre not. siting ffcsh ;,n t-ap slab, i_o , Frame is silting flush on top slab. separat+or, of rrore V!w^ ?: inc_'w of the frame from Ihr top slab. Cracks in walls or C racSS wder tray 1i1 Inc,, and ro^sac tra*, 3 feel, Catch basin Is sealed and t kt en : ny evldeilCY_ or srl partiielr.N errt•>rlrra catch structurally "sound oasin 1hrouph Cracks, or mainlenanre person �acges that catch basin is unsound. Crank., %%i&r F=a,, ,t inrn and ofs• t'r_an 1 foot, No cracks more than 'l, inch wide y, at the ;olnt of any ,rreUc-Aet pipe or any evda^ce the }dint of lnlelloutlet pipe - ,A Noll particles ehleririy :;itch basin through corks &011Y•rricnU Catch va3in has settled (,.Yole Man 1 inch or Itas Bashi r_plated or repaired to design misali ,r-nont rotated mare t:rat 2 irchns out of alignmerq standards Darciaged pipe k_, aits CrijcRs eider than YrielrlY at the ;»!`i of 111d No tracks, rilbfe Won ,S-inch voicit sl T,'rllocllrt pipes or any rvidrnrv, of s-)il rntrrin7 the•, jpird of inlrlloullct pip, s, the catch basin at the joint of the iniet'oullet D=0/_ S. Contaminants and Any evidence of r-omameranis or pollution such Materials removed and disposed of FYNIutlon as o.:, o2soline, concrete slurnt,s or paint. according to applicable rayulatiuns_ $purr,, rrntrol ElMPs implomr.-nl,d if appropriate- No contaminants pfesdrit other thin a surface oil filfrj_ Inleti'9utiet Pipe Sediment Sec,ment Ming 20">v or mar_ of t^e pipe. Inlatioutlel pipes clear of sadimenL acourllulal.on Trash and debris Trasr and debris accLmulate•d in inletloutlet No trash or debris in pipes. aes I,ntludes noalables and non-Iloalables1 Darnagad Crac'.ss wd2r tram ': 1^ch at the ; a rl of the No cracks more than ',-inch wide at _:-£'ll'JuIICt pipes- or any `_viclefic'e of s,oi: erlttring the j:,1111 of Me 11'11elioullet pipe al thc oinls of thr inlet'nutlr..I pipes COUGHLIN PORTERLUN DEEN Seattle Children's Hospital — South Sound Clinic 13 Federal Way -1 NO. 5 - CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When Maintenance Is Needed Results Expected When Component Maintariance is Pi-rfarmad 1-11-1°-31C gra:e c�,nerrtrig ale vein opuriingviider *har, Grate rric0s dcsr_!-, Trash and,jt:,�-ns Trwi and r1iLn,1:5 That IS bloc-J119 More 11130 LJ7o Grate free of 1rasn and =5tn5. fanfr-:)l(! la Cparrageej or missing '_tale mis Bing ^,,, broker: rneniberis:, of L,.-E gratt:. (-'rate iB ;r, place and mec-5 design Any open strurture requires Urgent inalritenance Manhole Ca,�erjl-id -Co-,=r,lid ncl n plarz r5 missing or only partially In place- Covedid proiecls opening lo Any apon structure requires urgent f; t r. t-,, f �, maintenance. L-74J.nq rr-•-chanisrn Mec.--97-3rr r-3^. Dl ,-. ripened Ly 5= Mernqrysrn opens -.0h prDpE r tz.,-s. Not ,0k-ndng naintt,.-r-an:kl Person with proper lools. Lens ciii-inn( bf! s,!;il t::a nit work. 1:) D';t! M:W:jL!ri;irir:e pvrnw; rwrinvi! Crww.liul ;in be rcrrinverl w-,i' -Rr -o-o-v-1id aftzr appl,,--cg, 80 fv5, of lift by one m n.qnco aint, Ders,311- NO. 6 - CONVEYANCE PIPES AND DITCHES Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When Component Maintenance is Performed vvatE-, rueds l"C'E -y Through 5. Plpeq $ed,Cllel7t & Accawnulatfc or �&bri that oxreds pf ffm VtatE:,, fvies trEE,v through P1-,_-;- roots yEIaGsr.-roots that reduce fiElE 1T,b%e1T-,&nl f FinckX:h, pillim '-'ontafninant- 39C Any 3videnre of co.n1arrr-anis or p,:,lUlon SULK Matcr:-wI& removcd and Cispcsf-d -34 vwmlirw r::,rz:rt!ij^ sJurriit.n w piiw- ;ipplicablt: rC!yL1l;11 mntry BV.Ps implemented if Na untzmlnanta Darrag-a L, pruteAve P:-,1,cr.fv,,e cc,-=Iing �B I-Emagud: rust or corrosion Fl:c,,r- repaired Gr replacf��. u;'jhn Dr vji�;jkwitn,.: 1;w 5*wwril k"It!yritq .,:I VV F::Ir! cs' pipe AT-.-y dual lll;jt ihjur";-w;w. G;i! -nu;-j :)I Rpe :)r wribict-4. pipe by rr,-e tma^ 2V,, 7, is rlet,?-nined to ra-en vocaker_-! Structural mleqfity c4 Tr-,i-,7 and corn; Tr-,i-,-'n and cez�yis ;,, xrv4:,,,;-5 I foot per :.000 7ra&, and 1m7,15 rlearnd frorn square leet of ditch an-1 sl*pes. Sao lrnl -r�xn u I at c-4 -;F cm -j n t trot c, x r. c. 2:", of f r- E, pit.-,h dqanrrl,flur hed all --3dirnonl a-3ign aEDIK an,M debris s-, trial a matchers dasign. Nnxi� ,j s woods Airy r,,xiotm or mu-nanc.2 v4;,7p3l-a[—,r- vvv7.h may Nnx:.-ju!5 nUi---;FM7?1 vc.q,,trlirn a hazcr, L� f - �--,vn ly pefE,:-v-1z! or IN rE-mo..-Co ac-onjing to applicable N:1 LJNr1yQr If 1--:,A(11.1& -,?oqok--Minn vihore County -7onnol oftr* public rroort normally be. 2nnl, nnt,�7 -ir-4 imirq An-v ;;virinnr�l of r-rlarrx,�lnln or p:, . -h 'Hizinn Nijr mririvr� and �i-jpr, --..d e lil� A- - !: F - f pCdlutlon -3 2,A, •g-asolin-, concrete slurries or painL t,. applic;ble rcgulauons. BMPimplCrDmIt!d if F;pprDprmn No -ont.iiinant!i present atrEr than a surface oil 'ilm- of watz.- *,irr-rf,7w,� 17!P.4ry il-irmigh Through •z lGhc .jo ,7r-�4,Aon r ,fry on n rliv.h !;Iopc, S1;-,-,,::-.!7 7irn- not Prodinq slopes Rnr-k nut of Cv-., lay^r or 1'."!s nfrncx nxi.-A!3 -ihr3-;p nalrk-r- roil Rnplacc, rnr.Kr iD deni,?n rlindarrl!7. Glace it rnss�rg df s.r�q G square feet or more, an-, ekpOSed Ala -..I',= �ir_:9L71e'I soil. COUGHLINPORTERLUNDEEN Seattle Children's Hospital - South Sound Clinic 14 Federal Way NO. 11 -GROUNDS (LANDSCAPING) Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When Component Mainlommnco is Performed Trash and debrts cleared from srte Site Trash or litter Any Trash and debris which exceed 1 cutic foot P,r i.s:M'r."i v1t::nr fitt•.i I,Ihis is ;rbnuk equal In the amount of trash it would take to fill up whe sta_ aafd, s•2e office garN ge rani. In general. lhrrr, n hould br no vi-qual rvitdnnuv of duriping Noxious weeds Ary noxious or nursancP vegelator, wn-- Il may Noxious and nuisance vegetation cnnslit.ar a h;Vice6 kQ Coiw ly prrnexim-f nr Mr.. remnvrrd ncrarding In applicable M E-4C, repulallons. ko danger of noxious vegetation where County pf_fsonnel x thr public: mlghI norm lly be Contaminants and Any evidenc-e of rr rlam ^ants or pollution such Materials removed and disposed of fxdlulinn .!; <>:-, c;:exnline cnnr:retr aurrics nr paint arc:;n9itx3 kn;tF)plicabhe reyulalinnrt Source control BMI's implemerLed if appropriale_ No contaminants prr_gent other khan :r surfers. nil film Grass: groundrr•ver Grass or grclyd UYer exceeds 1 a ^ehes in Grass or grour6co. cr nwdoed to a ht.s.1 ireRzhl nr. grmiker than d inrhes. No hazard trees In fao,lmr. Trees and Shrubs Hazard Any tree x Ilrnb of a tree :Ce-•rtihed as hav,rg a Tx;lentxa I:r fall and i:ause property aaJnagc; �r threaten, human life. A hazard tree identifeed by a qualihAd arbanst mast be removed as soon as possibl4. Damaged L'mbs or Darts of te-es or v ri os that are split or Trees and shrubs with less. than 51% bratien which allecl Mole Than 252.;6 of L4 b c nal :A total fuhage with Split or broken fnlimr of ihr.. Irrr or >^nrn irnh5, Trees or shrubs Ural •t'.a:gc L`e'^n blown down or No bkrrnl d wn vegeLalion Rnnr;md c}vnr knnrkrd rvr..r vrgrtalion Trim or shrubs tn8e of Injur f. Trrr, nr shrub* wftich ace not. ndrgw*.fy Trrr. or 5hnjb in plai:r: and supportEc or srs leaning over, cat:sing expofitlr{. adequately sucported- dead G' of the diseased trees removed. JCOUGHLIN PORTERLUN DEEN Seattle Children's Hospital - South Sound Clinic 15 Federal Way FIGURES Figure 1 - TIR Worksheet Figure 2 - Site Location Figure 3 - Drainage Basin Map OXA11J 0 FA IA'A6F k -j-,w a I COUGHLINPORTERLUNDEEN Seattle Children's Hospital — South Sound Clinic •.J 16 Federal Way King County Department of Development and Environmental Services TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Project Tenant: Seattle Childrens' Hospital Address: 4800 Sand Point Way NE Seattle, WA 98105 Phone: 206 987-2000 Project Engineer: Alan Jacobson, P.E. Company: Coughlin Porter Lundeen Address/Phone: 801 2"d Ave, Suite 900 Seattle, WA 98104 206 343-0460 Part 3 TYPE OF PERMIT APPLICATION ❑ Subdivison ❑ Short Subdivision ❑ Grading ❑ Commercial ® Other: Part 2 PROJECT LOCATION AND DESCRIPTION Project Name: Seattle Childrer Location Township: 2 Range: 4 Section: 2 Part4 OTHER REVIEWS AND PERMITS I ❑ DFW HPA ❑ Shoreline Management ❑ COE 404 ❑ Rockery ❑ DOE Dam Safety ❑ Structural Vaults ❑ FEMA Floodplain ❑ Other ❑ COE Wetlands Part5 SITE COMMUNITY AND DRAINAGE BASIN Community: Federal Way, WA Drainage Basin: Hylebos Creek Basin Part 6 SITE CHARACTERISTICS ❑ River J❑ Stream ❑ Critical Stream Reach ❑ Depressions/Swales ❑ Lake ❑ Steep Slopes ❑ Floodplain ❑ Wetlands ❑ Seeps/Springs ❑ High Groundwater Table ❑ Groundwater Recharge ❑ Other J Part 7 SOILS Soil Type N/A Slopes Erosion Pot( ❑ Additional Sheets Attached Part 8 DEVELOPMENT LIMITATIONS REFERENCE Ch.4 — Downstream Analysis ❑ Additional Sheets Attached Part 9 ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION ® Sedimentation Facilities ® Stabilized Construction Entrance ® Perimeter Runoff Control ® Clearing and Graing Restrictions ® Cover Practices ® Construction Sequence ❑ Other LIMITATION/SITE CONSTRAINT MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION ® Stabilize Exposed Surface ® Remove and Restore Temporary ESC Facilities ® Clean and Remove All Silt and Debris ® Ensure Operation of Permanent Facilities ❑ Flag Limits of SAO and open space preservation areas ❑ Other Part 10 SURFACE WATER SYSTEM ❑ Grass Lined ❑ Tank ❑ Infiltration Channel ❑ Vault ❑ Depression ❑ Pipe System ❑ Energy Dissapator ❑ Flow Dispersal ❑ Open Channel ❑ Wetland ❑ Waiver ❑ Dry Pond ❑ Stream ❑ Regional ❑ Wet Pond Detention Brief Description of System Operation N/A Facility Related Site Limitations Reference N/A Facility Part 11 STRUCTURAL ANALYSIS ❑ Cast in Place Vault ❑ Retaining Wall ❑ Rockery > 4' High ❑ Structural on Steep Slope ❑ Other N/A Limitation Method of Analysis Compensation/Mitigati on of Eliminated Site Storage Part 12 EASEMENTS/TRACTS ❑ Drainage Easement N/A ❑ Access Easement ❑ Native Growth Protection Easement ❑ Tract ❑ Other Part 13 SIGNATURE OF PROFESSIONAL ENGINEER I or a civil engineer under my supervision my supervision have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attachments. To the best of my knowledge the information provided here is accurate. COUGHLIN PORTERLUNDEEN STRUCTURAL • CIVIL • SEISMIC ENGINEERING Figure 2 -Site Location Proica. Seattle Children's - South Sound Clinic Designed By: RGL Date: 05/30/ 14 Project_ No: C 140194-01 Client: ZGF Architects Checked By: JAJ 801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206.343.0460 / cplinc.com COUGHLIN PORTER LUNDEEN STRUCTURAL • CIVIL • SEISMIC ENGINEERING OAT, 1, Alle f21 33rdSTNE •� r PROJECT LOCATIO Y_ I; R:�2Hkz�swm��l owCbntroi�fk�titiC ontrol . ml[d 5 272nd ST r .1 1 ce5 dome-- ! I = ` ■rd� _ f:iLa.ii en S 288th 5T 6 r 1 1•, 1 '- ' Mill ■� Basin City of Federal Way Flow Control Applications Map Legend Drainage Basin Boundary `;trey ms LCity Limits Lakes and Wetlands Flow Control Basic Flow Control 'areas - Conservation Flow Control Areas - Flood Problem Flow Control Areas Major Receiving Waters 1. Puget Sound Map Date: February, 2010 SWM Division City of Federal Way 33325 8M Ave S PO Box 9718 Federal Way, WA 98063 (253)835-2700 www.cttyofrederalway_com Figure 3m. Drainage Basin Map C_ .I_ r'L.:I.4.. ..1 L.L. ..;+-I C�imii rlinir Project: r— ---- --- - Project No: C 140194-01 Client: ZGF Architects o... RGL n.. - 5/30/2014 Checked By: RAJ www.cplinc.com .cs