Loading...
22-105444City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SCHULTZ Project Address: 2114 SW 326TH ST Electrical Permit #:22-105444-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 896580 0060 Project Description: BLUEBEAM - PV Solar roof mount installation 3 circuits 11.47kW Owner Applicant Contractor MICHAEL SCHULTZ SOLGEN POWER LLC SOLGEN POWER LLC 2114 SW 326TH ST 5715 BEDFORD ST SOLGEPL830RJ (1/24/24) FEDERAL WAY WA 98023 PASCO WA 99301 5715 BEDFORD ST PASCO WA 99301 Is this an Online or O.T.C. application?........ Circuits - Residential Fire conditions: Additional Permit Information No Electrical Fixtures CONDITIONS: Upon completion of installation, the following photographs shall be emailed to planreview ,southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business days, call 253-946-7348 to check status. PERMIT EXPIRES Saturday, 17 June, 2023 Permit Issued on Monday, December 19, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wa�,hi,.ggtonand the City of Federal Way. Owner or agent: Date: r THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105444 00 Address: 2114 SW 326TH ST Project: MICHAEL SCHULTZ FEDERAL WAY WA 98023-2532 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this.card. l UFER Ground (4295) ❑ Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) 0 Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date 0 E] 0 Feeders/Sub-panels (4045) Rough Electrical (4225) Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date 0 Ceiling Cover (4020) 1 Final - Electrical (4055) Approved Al proved By Date By Date �� �J ❑ Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date