22-105444City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SCHULTZ
Project Address: 2114 SW 326TH ST
Electrical
Permit #:22-105444-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 896580 0060
Project Description: BLUEBEAM - PV Solar roof mount installation 3 circuits 11.47kW
Owner
Applicant
Contractor
MICHAEL SCHULTZ
SOLGEN POWER LLC
SOLGEN POWER LLC
2114 SW 326TH ST
5715 BEDFORD ST
SOLGEPL830RJ (1/24/24)
FEDERAL WAY WA 98023
PASCO WA 99301
5715 BEDFORD ST
PASCO WA 99301
Is this an Online or O.T.C. application?........
Circuits - Residential
Fire conditions:
Additional Permit Information
No
Electrical Fixtures
CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreview ,southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a
response back from SKFR once the permit has been approved by SKFR so you can schedule your
electrical final inspection.
If no response from SKFR within 2 business days, call 253-946-7348 to check status.
PERMIT EXPIRES Saturday, 17 June, 2023
Permit Issued on Monday, December 19, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wa�,hi,.ggtonand the City of Federal Way.
Owner or agent: Date:
r
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 105444 00 Address: 2114 SW 326TH ST
Project: MICHAEL SCHULTZ FEDERAL WAY WA 98023-2532
Scheduled inspections may be failed if this card is not on -site.
DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections
as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence.
On -going inspections are logged on the back of this.card.
l UFER Ground (4295) ❑
Ditch cover (4030) El Slab/Concrete Floor (4255)
Approved
Approved Approved to place concrete
By Date By
Date By Date
0 Pool Bonding (4195) 0
Temporary Power (4275) 0 Service (4235)
Approved
Approved Approved
By Date By
Date By Date
0
E]
0
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Final - S K F & R (4060)
Approved
Approved
Approved
By Date
By
Date
By Date
0 Ceiling Cover (4020) 1 Final - Electrical (4055)
Approved Al proved
By Date By Date �� �J
❑
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date