23-100590City of Federal Way
Community Development Dept.
FlLk;n-
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) B35-2607 Fax: (253) 835-2609
Project Name: SING
Project Address: 2402 S 280TH PL
Electrical
Permit #:23-100590-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 326080 0360
Project Description: INSTALLING NEW HEAT PUMP AND REPLACING EXISTING GAS FURNACE
Owner
Applicant
Contractor
JAMEY SING
SUSAN DUNHAMBLACK HILLS INC
BLACK HILLS INC (ELECTRICAL)
2402 S 280TH PL
1003 85TH AVE SE UNIT A
BLACKH1919DL (3/15/23)
FEDERAL WAY WA 98003-2932
OLYMPIA WA 98501
1003 85TH AVE SE UNIT A
OLYMPIA WA 98501-5706
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixture%
Circuits - Residential • 1 Thermostat
PERMIT EXPIRES Wednesday, 2 August, 2023
Permit Issued on Friday, February 3, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wa 'ngton and the City of Federal Way.
Owner or agent: (IN L I N1 L Ez j Date:
1 f
CRY Of
Federal Way
THIS CARD IS TO RE\LU ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-30-50
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE IBIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are imsure about any of the inspections or the inspection sequence. On -going inspections are log-ed on the back of this card.
ELECTRICAL
❑
LTFER Ground (4295)
❑
Ditch corer (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Q
Feeders/Sub-panels (4045)
Q
Rough Electrical (4225)
0
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
By
roved
6� Date'����
_,1-:7,, 1V4 77
MECHANICAL
El
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Mechanical (4065)
Approved
Appmved to release test
Approved
By
�j
Date �i -/ 1
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date