Loading...
21-103805City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: LAKE EASTER ESTATES, UNITS 7 Project Address: 30843 13TH PL S Project Description: BLUEBEAM - Repair upper deck. Building - Multi Family Permit #:21-103805-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 401540 0070 Owner Applicant Contractor Lender I E MUMFORD WM MCDANIELLAKE EASTER OWNER IS CONTRACTOR OWNER IS LENDER 10450 NW FLOTOMA ESTATES HOA PORTLAND OR 97229 30803 13TH PL S FEDERAL WAY WA Census Category: 434 -Residential alt/add(ft change in number of units 3 15 1h Includes: #1 #3 #4 Occupancy Class: r Construction Type: Occupancy Load: Floor Area (sq. ft.) 10 Is �tional Permit Informa4 Mechanical to be Included? ....................... No Plu i ork Valuation?..................................... 0 Mechanical Work Valuation? .................................. 0 Nuvif'stories.............. ......................... ............ 2 Is this an Online or O.T.C. application? .................. No Prit for Building Shell Only?............................. No Plumbing to be Included?............ No 4W Tcomprehensive Plan Designation ........................... Multifamily Zoning Designation..... RM 1800 Total Valuation: 9,000.00 %i No Fixtures Assn d With This Permit H PERMIT EXPIRES Tuesday, 22 March, 2022 Permit Issued on Thursday, September 23, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W 0hifi oland rhe City of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 103805 00 Address: 1301 S 308TH ST Project: LAKE EASTER ESTATES COA FEDERAL WAY 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ Footings/Setback (4110) Approved to place concrete By Date 37 Final - Building (4050) Approved By Date Prior to scheduling a Framing inspection; 2❑ Framing (4120) Electrical, Plumbing & Mechanical Rough -in v (� M Approved to insulate and Fire/Draft Stop inspections must be signed- 1� ?J�� off and approved. IBC 109.3.4 By Date �) Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date