Loading...
21-105025city orTederalWay Building - Single F. y'1 Camtnunity thw'clapmcnt Ikpt Permit # � � � — 33325 8th Ave S 1 U5025-00—SF Federal Wgy, WA 98003 �VJ�J k7 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050 Project Name: ROGERS Project Address: 4155 S 332ND PL Parcel Number: 618140 0760 Project Description: gLUEBEAM -Add 535 SF to the 1st floor of an existing 2 story SFR of 2,300 existing conditioned space. Remove existing 138 SF deck and replace with 129 SF of covered deck space. Remodel existing kitchen and laundry room on, 1st floor. Includes plumbing and mechanical. Owner A IiCarlt JEREMY & BRENDA ROGERS Contractor Lender NEIL EUGENIOTHE KEIMIG MASTER BUILDERS 4155 S 332ND PL ASSOCIATES CONSTRUCTION NW LLC OWNER IS LENDER FEDERAL WAY WA 98003 307 "D" ST SE 112 SILVERNAIL ST NE AUBURN WA 98002 ORTING WA 98360 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occu ancy Class: R-3 Construction T e: Type V - B Occupancy Load: Floor Area (sq, ft.) 535.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor.... ................. 535 New / Additional Sq. Feet - 3rd Floor..................... 0 New / Additional Sq. Feet - Basement ............... New / Additional Sq. Feet - Deck ........................... 129 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 1888 New / Additional Sq. Feet - Other ........................... 0 Plumbing to be Included? ........................................ Yes Occupancy #I - Use ................................................ Residence (I or Zoning Designation ................................................. family) RS 9.6 Total Valuation: 68,677.85 New / Additional Sq. Feet - 2nd Floor,,,,,,,,,, 0 Occupancy #1 -Area (Sq. Feet) .............................. 535 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage........... ............. 0 Plumbing Work Valuation?...................................8850 Number of Stories .................. Is this an Online or O.T.C. application?.................. No New / Additional Sq. Feet - Total...,....... Comprehensive Plan Designation ........................... SF - High -Density Residential Fans Mechanical Fixtures ' Plumbing Fixtures Dishwashers I Lavatories Water Closets I Showers 1 Hose Bibbs I Special plat condition(s) s) apply. a I . CONDITIONS: PERMIT EXPIRES Sunday,19 June, 2022 Permit Issued on Tuesday, December 21, 2021 on he above described I hereby certify that the above informat `be in accordance that w ththe the laws, rules nandt regulations of the State of property and the occupancy and the use w Wash pion and the City of Federal Way. j LE Date: Owner or agent: I r ' CITY OF . THIS CARD IS TO REMAIN ON -SITE Federal Way Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 105025 00 Address: 4155 S 332ND PL Project: JEREMY & BRENDA ROGERS FEDERAL WAY WA 98001-5154 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 SWM Precon Site Mtg (4400) Q Initial Erosion Control 4365 3 Approved ( ) ❑ Footings/Setback (4110) To be done PRIOR to breaking ground B Approved to place concrete Y Date By Date ® Foundation Wall (4115) Approved to place concrete BY Date ❑ Slam/Concrete Floor (4255) Approved to place concrete BY Date _0 Shear Walls (4245) Approved to install Sidi g BY Date 13 Mechanical Rough -in (4165) Approved BY j�,] Date 5 3 2 �G Interim Erosion Control (4370) Approved BY Date f8 Insulation (4150) Approved to install wallb and BY h� Date 5 % 2i Final - Mechanical (4065) Approved BY Date -z-z BY Date El Drainage/Downspout (4040) © Plumbing Groundwork (4190) Approved to backfill Approved to cover BY Date By Date ® Underfloor Framing (4285) 9❑ Floor Sheathing (4105) Approved to sheath floor Approved to install flooring BY Date By Date El Roof Sheathing (4220) 12 ❑ Rough Plumbing (4230) Approved to install roofing Approved BY Date By /4 7" Date 5 94 Gas Piping (4125) 15 A ❑ Fire/Draft Stops (4095) pproved to release test Approved BY Date By ri Date �;I� Prior to scheduling a Framing inspection; 17 Electrical, Plumbing & Utchanical Rough -in Framing (4120) and FirelDraft Stop inspections must be signed- Approved to insulate off and approved. IBC 109.3.4 J -- - By Date 512 19 Gypsum Wallboard Nailing (4130) Lg nal Erosion Control (4375) Approved to install mud tap Approved BY g.Date r[°� Date Final - Plumbing (4075) Ec Final -Building (4050) Approved Approved Pr By 2 Date Date I l l 2•F ❑ Rough Electrical ❑ Approved Final Electrical ❑ Approved Right of Way BY Date Approved BY Date BY Date