Loading...
21-101554City of Federal Way Connunity Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ROCKWELL COLLINS Project Address: 32125 32ND AVE S Building - Commercial Permit #:21-101554-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 215465 0050 Project Description: BLUEBEAM - Minor interior demolition, build new conf. room and expand current office space by 1363 sq. ft. No plumbing or mechanical. Owner Applicant Contractor Lender I-5 TECH INVESTORS LLC PAUL ENGERTENGERT D P INC GENERAL TENANT IS LENDER 2360 CORPORATE CIR SUITE 330 ARCHITECTURE LLC CONTRACTORS HENDERSON NV 89074 773 SUMMIT ST 19936 BALLINGER WAY NE RICHLAND WA 99352 SEATTLE WA 98155 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: B Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 17,470.00 Additional Permit Information Occupancy #1 - Area (Sq. Feet)................ .............. 17470 Mechanical to be Included? ..................................... No Mechanical Work Valuation? .................................. 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Comprehensive Plan Designation ............... Office Park Total Valuation: 35,000.00 Occupancy #1 -Construction Type ................ Type V - B Plumbing Work Valuation? ..................................... 0 Number of Stories ................................................... 3 Permit for Building Shell Only? .............................. No Occupancy #1 -Use ...... .................. Professional ...................... Services/Offices Zoning Designation ................................................. OP-1 No Fixtures Associated With This Permit Il CONDITIONS: A separate permit is required for any sprinkler or fire alarm modification required due to the TI. Obtain permits through the City of Federal W PERMIT EXPIRES Sunday, 2 January, 2022 Permit Issued on Tuesday, July 6, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Fn:# City of Federal Way. Owner or agent: Date: CITY OF Federal Way PERMIT # Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 21 101554 00 I-5 TECH INVESTORS LLC Address: 32125 32ND AVE S Unit 110 FEDERAL WAY WA 98001 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) Re -steel (4215) 0 Slab/Concrete Floor (4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date ® Underfloor Framing (4285) Floor Sheathing (4105) © Fire/Draft Stops (4095) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date Prior to scheduling a Framing inspection; 0 Framing (4120) ® Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed- ' Approved to insulate Approved to install wallboard off and approved. IBC 109.3.4 By Date By Date 0 Gypsum Wallboard Nailing (4130) iD Suspended Ceiling Grid (4265) Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By Date By Date By Date 12 Final - Planning t s Final - Building (4050) Approved _XJ a- Approved By Date By Date !b- J.) Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date