Loading...
21-101576City of Federal way Community Development Dept. 33325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HORNUNG Project Address: 505 SW 294TH ST Building - Single Family Permit #:21-101576-00-SF Inspection Request Line: (253) 835-3050 Project Description: BLUEBEAM - Demo and rebuild of deck, guard rail & stairway Parcel Number: 119600 2948 Owner Applicant Contractor Lender CHRISTINE HORNUNG CASEY MCCABEC & S C & S CONSTRUCTION LLC OWNER 1S LENDER 505 SW 294TH ST CONSTRUCTION LLC 3256 S 360TH FEDERAL WAY WA 98023 3256 S 360TH ST AUBURN WA 98001 AUBURN WA 98001 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 700.00 Additional Permit Information New / Additional Sq. Feet - Ist Floor ..................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 700 Mechanical to be Included? ..................................... No Mechanical Work Valuation? ............. ........4............ 0 New / Additional Sq. Feet - Other......... I ................. 0 Plumbing to be Included? ........................................ No Occupancy #1 - Use ................................................ Residence (1 or 2 family) Zoning Designation ...................... RS 9.6 Total Valuation: 13,615.00 New / Additional Sq. Feet - 2nd Floor .................... 0 Occupancy #1 - Area (Sq. Feet) ............................. 700 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Garage ........................ 0 Plumbing Work Valuation? ..................................... 0 Number of Stories ...................,.. .......................... 2 Is this an Online or O.T.C. application? .................. No New / Additional Sq. Feet - Total ......................... 700 Comprehensive Plan Designation ........................... SF - High -Density Residential No Fixtures Associated With This Permit!! PERMIT EXPIRES Tuesday, 30 November, 2021 Permit Issued on Thursday, June 3, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of i ton and the City of Federal Way. Owner or agent: Date: _�k Clrr OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 101576 00 Address: 505 SW 294TH ST Project: CHRISTINE HORNUNG FEDERAL WAY WA 98023-3540 Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSF THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ® SWNI Precon Site Mtg (4400) Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date ® Foundation Wall (4115) ❑ Drainage/Downspout (4040) ❑ Slab/Concrete Floor (4255) Approved to place concrete Approved to backfill Approved to place concrete By Date By Date By Date ❑ Underfloor Framing (4285) ❑ Floor Sheathing (4105) ❑ Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date ❑ Roof Sheathing (4220) ❑ Fire/Draft Stops (4095) E2 Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date 'tl Gypsum Wallboard Nailing (4130) ❑ Final Erosion Control (4375) El Final - Building (4050) Approved to install mud & tape Approved P� M a Approved R By Date By Date By LW fZ Date 7-/y- J / Rough Electrical ❑ Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date