20-102926City of Federal Way
Community Development Dept.
33325 Sth Ave S
Federal Way. WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: CHICK-FIL-A
Project Address: 32025 PACIFIC HWY S
Building - Commercial
Permit #:20-102926-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 150050 0110
Project Description: BLUEBEAM - Installation of canopies over existing drive -through for protection of employees
and vehicles.
Owner
Applicant
Contractor
Lender
HARSCH INVESTMENT PROPS
KAT ALVAREZESENCIA
BIORGE CONSTRUCTION INC
TENANT 1S LENDER
LLC
1743 E MCNAIR DR SUITE 200
1854 W 280TH S
PO BOX 2708
TEMPE AZ 85143
WOODS CROSS UT 84087
PORTLAND OR 97208
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor ..................... 0
New / Additional Sq. Feet - 3rd Floor .....................
0
New / Additional Sq. Feet - Deck ...........................
0
Mechanical to be Included?... ..................................
No
Mechanical Work Valuation? ..................................
39000
New / Additional Sq. Feet - Other ...........................
821
Permit for Building Shell Only? ..............................
No
New / Additional Sq. Feet - Total ...........................
821
Zoning Designation .............. ..............
CC-F
Total Valuation: 145,000.00
Gas Piping 1
New / Additional Sq. Feet - 2nd Floor .................... 0
New / Additional Sq. Feet - Basement .................... 0
New / Additional Sq. Feet - Garage ........................ 0
Plumbing Work Valuation? ................ 0
Number of Stories ................................................... I
Is this an Online or O.T.C. application? .................. No
Plumbing to be Included? ........................................ No
Comprehensive Plan Designation ........................... City Center Frame
Mechanical Fixtures
PERMIT EXPIRES Sunday, 18 July, 2021
Permit Issued on Tuesday, January 19, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
F7 F, I
Owner or agent: ? l .l Lill Date:
=a -= I - -
THIS CARD 1S TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 20 102926 00 Address: 32025 PACIFIC HWY S
Project: HARSCH INVESTMENT PROPS LLI FEDERAL WAY WA 98003-6001
Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSE TI IIS CARL). Inspections are listed as close to sequential, order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0 Footings/Setback (4110) Q Foundation Wall (4115) ❑ Drainage/Downspout (4040)
Approved to place concrete Approved to place concrete Approved to backfill
By Date By Date By Date
Re -steel (4215) ® Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285)
Approved to place concrete or grout Approved to place concrete Approved to sheath floor
By Date By Date By Date
❑
Floor Sheathing (4105)
0
Shear Walls (4245)
❑
Roof Sheathing (4220)
Approved to install flooring
Approved to install siding
Approved to install roofing
By
Date
By
Date
By
Date
Fire/Draft Stops (4095)
Approved
By
Date
Insulation (4150)
Approved to install wallboard
By
Date
ED
Final - S K F & R (4060)
Approved
By
Date
l Final - Building (4050)
Approved
BY}
Date
Prior to scheduling a Framing inspection; ❑ Framing (4120)
Electrical, Plumbing & Mechanical Rough -in Approved to insulate
and Fired)raft Stop inspections must be signed -
off and approved. IBC 109.14 By Date
Gypsum Wallboard Nailing (4130) IT41
Approved to install mud & tape
By Date By
❑ Final - Planning al
Approved
By Date By
Suspended Ceiling Grid (4265)
Approved to drop file
Date
Final - Public Works (4080)
Approved
Date
❑ Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
By Date By Date By Date