Loading...
21-104574.. T .1 City of Federal Way Cormnunity Development Dept. 33325 8th Ave 5 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Single Family. Permit #:21-104574-00-SF Inspection Request Line: (253) 835-3050 Project Name: KING Project Address: 30201 24TH AVE SW Parcel Number: 893750 0060 Project Description: BLUEBEAM - Adding main floor master. No plumbing or mechanical included. Owner Applicant Contractor Lender KEVIN KING CODY DURRETT QUALITY TOUCH CONST OWNER IS LENDER 30201 24TH AVE SW PO BOX 4034 SERVICES FEDERAL WAY WA 98023-2345 SPANAWAY WA 98387 PO BOX 1314 AUBURN WA 98071-1314 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 520.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 520 New / Additional Sq. Feet - 2nd Floor.................... 0 New / Additional Sq. Feet - 3rd Floor .................... 0 Occupancy #1 - Area (Sq. Feet) .............................. 520 New / Additional Sq. Feet - Basement .................... 0 Occupancy #1 - Construction Type......................... Type V - B New / Additional Sq. Feet - Deck ........................... 0 New / Additional Sq. Feet - Garage........................ 0 Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 0 Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 0 New / Additional Sq. Feet - Other ........................... 0 Is this an Online or O.T.C. application?.................. No Plumbing to be Included? ........................................ No New / Additional Sq. Feet - Total........................... 520 Occupancy #1 - Use ................................................ Residence (1 or 2 Comprehensive Plan Designation........................... SF - High -Density family) Residential Zoning Designation ................................................. RS 9.6 Total Valuation: 64,313.60 No Fixtures Associated With This Permit II PERMIT EXPIRES Saturday, 6 August, 2022 Permit Issued on Monday, February 7, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _ ;;��� Date: V�( THIS CARD IS TO REMAIN ON -SITE Federal 111Ia THIS Inspection Record y INSPECTION REQUESTS: (253) 835-3050 PERMIT #: Project: 21 104574 00 Address: 30201 24TH AVE SW KEVIN K KING FEDERAL WAY WA 98023-2345 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date 3 21T By Date 3 z8- � By Date ® Slab/Concrete Floor (4255) Eil Underfloor Framing (4285) © Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By 4A3 Date y By Date 7 Shear Walls (4245) ® Roof Sheathing (4220) 0 Fire/Draft Stops (4095) Approved to install g Approved to install roofing Approved By Date R By Date q-12—X By y9rJ Date Prior to scheduling a Framing inspection; iD Framing (4120) 11 Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed - & off and approved. IBC 109.3.4 ! BY Iv Date 1101-LI, BY Date 12 Gypsum Wallboard Nailing (4130) 13 Final - Building (4050) Approved to install mud & tape Approved By Date /ZI/�.� By � Date i 0 Iq ,1[ 0 L2 - f+,4 - 9.5 - P tt &1 oV• Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date