Loading...
21-104441City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 83&2607 Fax: (253) 835-2609 Project Name: HOLLOWAY Project Address: 3826 SW 313TH ST S. I Building - Single Family Permit #:21-104441-00-SF Inspection Request Line: (253) 835-3050 Parcel Number: 873198 1200 Project Description: BLUEBEAM - Bathroom remodel. Furr out existing basement foundation wall in bedroom and expand size of stair landing. Includes plumbing and mechanical. Owner Applicant Contractor Lender JAMES & REBEKAH HOLLOWAY PATRICK SOCKEYE HOMES OWNER IS LENDER 3826 SW 313TH ST HUNGERFORDHUNGERFORD 14638 SE 229TH PL FEDERAL WAY WA 98023 ARCHITECTS KENT WA 98042 2453 DOUGLAS DR NE BAINBRIDGE ISLAND WA 98110 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction T e: Type V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Occupancy #1 - Construction Type ......................... Type V - B Mechanical to be Included?..................................... Yes Plumbing Work Valuation? ..................................... 2000 Mechanical Work Valuation?.................................. 500 Number of Stories ................................................... I Is this an Online or O.T.C. application?.................. No Plumbing to be Included?..................... ................... Yes Occupancy #1 - Use ................................................ Residence (1 or 2 family) Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation ................................................. RS 7.2 Residential Total Valuation: 30,000.00 Mechanical. Fixtures Fans 2 Plumbing Fixtures Showers 1 Sinks 2 Water Closets PERMIT EXPIRES Saturday, 21 May, 2022 Permit Issued on Monday, November 22, 2021 1 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE CITY OF �- Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 104441 00 Address: 3826 SW 313TH ST Project: JAMES & REBEKAH HOLLOWAY FEDERAL WAY WA 98023-2143 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q SWM Precon Site Mtg (4400) ❑2 Initial Erosion Control (4365) F11 Plumbing Groundwork (4190) Approved To be done PRIOR to breaking ground Approved to cover By Date By Date By Date ® Underfloor Framing (4285) 0 Floor Sheathing (4105) ©' Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 0 Roof Sheathing (4220) ® Rough Plumbing (4230) ,. ® Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By _. lA - Date Z 151 Gas Piping (4125) 11 Fire/Draft Stops (4095) 12 Interim Erosion Control (4370) By Approved to release test Date ( fj2 By Approved Date Z >7 By Approved Date Prior to scheduling a Framing inspection; 13 Framing (4120) 1A Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fir _ aft Stop inspections must be signed- _ 1 off and approved. IBC 109.3.4 By �1JDate a[� �Z By [V Date L3 7 1 Gypsum Wallboard Nailing (4130) Eli Final Erosion Control (4375) 17 Final - Mechanical (4065) Approved to install mud & tape Approved Approved By Date &&LZBy Date By V Date 1 Q 18 Final - Plumbing (4075) 19 Final - Building (4050) Approved Approved By�� Date 2 By IJE�Date �i �wV 1�_ -�o Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date