Loading...
22-102572City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Electrical = Permit #:22-102572-00-EL Inspection Request Line: (253) 835-3050 Project Name: DE GUZMAN Project Address: 3609 SW 338TH PL Parcel Number: 921150 0580 Project Description: BLUEBEAM - Installation of 29 Modules -Roof Mounted Solar Panels- 11.60 kWDC Owner Applicant Contractor ADOR & QUEEN ROSE DE GUZMAN MARIE MOORENATIONWIDE SOLAR NATIONWIDE SOLAR (ELECTRICAL) 8915 WYNNE ST PO BOX 959821 NATIOS*786TW (2/16/24) RENO NV 89506 VANCOUVER WA 98682 PO BOX 959821 VANCOUVER WA 98682 Additional Permit Information Is this an Online or O.T.C. application? .................. No Alt. Serv./Feeder: 0 to 200 aml 1 Electrical fixtures CONDITIONS: Fire Conditions: Please call 253-946-7318 at least 48 hours prior to requesting your electrical final so SKFR can conduct their fire final first. Call 253-946-7318 to schedule your inspection. Please schedule your inspection at least 2 business days in advance. The fire marshals office will call you back and set up an agreed upon time. Preferred inspection days are Tuesdav through Thursday with limited insiection availability on Mondav's and Fridav's. PERMIT EXPIRES Sunday, 29 January, 2023 Permit Issued on Tuesday, August 2, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A�, CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 102572 00 Address: 3609 SW 338TH PL Project: ADOR & QUEEN ROSE DE GUZMA FEDERAL WAY WA 98023-2963 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q UFER Ground (4295) Approved By Date El By Ditch cover (4030) Approved Date 0 Slab/Concrete Floor (4255) Approved to place concrete By Date Pool Bonding (4195) ® Temporary Power (4275) ® Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date t) Final - Electrical (4055) -Xpprovcd B �� Date Y ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date RN. Date Date