22-103759t- I
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Building - Multi Family
FILE Permit #:22-103759-00-MF
Inspection Request Line: (253) 835-3050
Project Name: CAMPUS LANDING APARTMENTS
Project Address: 32420 1ST WAY SW
Project Description: BLUEBEAM - Replace 4-stall carport structure.
Parcel Number: 182104 9042
Owner
Applicant
Contractor
Lender
FE-VALLEY DEVELOPMENT
BETH ALBRECHTHI-VALLEY
STEELPORT LLC
OWNER IS LENDER
CORP
DEVELOPMENT CORP
8565 SW SALISH IN SUITE 140
200 EXECUTIVE PKWY SUITE 22
t200 EXECUTIVE PKWY SUITE 221
WILSONVILLE OR 97070
EUGENE OR 97401
EUGENE OR 97401
Census Category: 434 - Residential alt/add - no change in number of units
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type -
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
0
New / Additional Sq. Feet - 3rd Floor .....................
0
New / Additional Sq. Feet - Deck ...........................
0
Mechanical to be Included? ........................... I.........
No
Mechanical Work Valuation? ..................................
0
New / Additional Sq. Feet - Other ...........................
636
Permit for Building Shell Only? ..............................
No
New / Additional Sq. Feet - Total ...........................
636
Zoning Designation .................................................
RM 2400
Total Valuation: 12,370.20
New / Additional Sq. Feet - 2nd Floor ....................
0
New / Additional Sq. Feet - Basement ....................
0
New / Additional Sq. Feet - Garage ........................
0
Plumbing Work Valuation? .....................................
0
Number of Stories ...................................................
I
Is this an Online or O.T.C. application? ..................
No
Plumbing to be Included? ..................'......................
No
Comprehensive Plan Designation ...........................
Multifamily
No Fixtures Associated With This Permit H
PERMIT EXPIRES Sunday,19 March, 2023
Permit Issued on Tuesday, September 20, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules ,and regulations of the State of
Wasgt nd ity of Federal Way.
_
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
CFrY 'OF - Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103759 00
Address: 32420 1ST WAY SW
HI
DEVELOPMENT CORP FEDERAL
WAY WA 98023-5665
Project: -VALLEY
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE 1HIS CAR[?. Inspections are listed as Close to sequential order as possible
Work not be covered until it is approved. Check with your inspector if
(read left to right, top to bottom). Please schedule inspections as appropriate. must
inspections or the inspection sequence. On -going inspections are logged on the back of this card.
you
are unsure about any of the
Q
Footings/Setback (4110)
2 dation Wall (4115)
❑ Foun
®
Drainage/Downspout (4040)
backfil]
Approved to place concrete
Approved to place concrete
A roved to
pp
V Date b?/Z_?
BY Date
By
Date
'By
®
Re -steel (4215)
® Slab/Concrete Floor (4255) EJ
Underfloor Framing (4285)
floor
Approved to place concrete or grout
Approved to lace concrete
pp p
Approved to sheath
By
Date
BY Date By
Date
l
Floor Sheathing (4105)
8 Shear Walls (4245) ®
Roof Sheathing (4220)
Approved to install roofing
pp
Approved to install flooring
Approved to install siding
By
Date
BY Date By
Date
1 c
Fire/Draft Stops (4095)
Prior to scheduling a Framing inspection; 1 t
Electrical, Plumbing & Mechanical Rough -in
Framing (4120)
Approved to insulate
Approved
and Fire/Draft Stop inspections must be signed -
off and approved. IBC 109.3.4 By
Date
By
Date
13 Gypsum Wallboard Nailing (4130) 94
Suspended Ceiling Grid (4265)
drop tile
'i2
Insulation (4150)
Approved to install wallboard
Approved to install mud & tape
pp
Approved to
By
Date
11 By Date By
Date
15
Final -Planning
t 6 Final - Building (4050)
Approved
Approved
r '
By
Date
By �i Date2�
❑
Rough Electrical
❑
Final Electrical
Approved
❑
Right of Way
Approved
Approved
By
Date
BY
Date
By