Loading...
15-103039Few � CITY OF �. Federal Way May 27, 2016 Jesse Wolfe 2812 Architecture 2812 Colby Avenue Everett, WA 98201 RE: File #15-103039-00-UP; PROCESS II `SITE PLAN APPROVAL' Dinh -Tuyen Townhomes, 29215 Military Road South, Federal Way Dear Mr. Wolfe: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor The City of Federal Way's Community Development Department has completed administrative review of the proposed Dinh-Tuyen Townhomes and site improvements located at 29215 Military Road South. The Process II land use application submitted on June 23, 2015, and subsequent resubmittal on November 18, 2015 and February 18, 2016, is hereby approved. The proposal meets site plan and community design guideline criteria set forth in Federal Way Revised Code (FWRC) 19.60.050 as found in the enclosed Exhibit A - Findings for Process It Site Plan Approval and incorporated into this decision by reference. The remainder of this letter outlines the zoning and development review process required for this proposal and a summary of appeal procedures. REQUIRED REVIEW PROCESS The proposed improvements to the site are subject to Process II Site Plan Review pursuant to to (attached) dwelling unit use requirements set forth in FWRC 19.205.010. The proposal does not exceed the city -adopted flexible thresholds set forth in FWRC 14.15.030(c) and therefore is exempt from review under the State Environmental Policy Act. APPEALS The effective date of this decision is May 30, 2016, or three days from the date of this letter. Pursuant to FWRC 19.60.080, any person who received notice of this administrative decision may appeal the decision to the Federal Way Hearing Examiner by June 14, 2016. Any appeal must be in the form of a letter delivered to the Department of Community Development with the established fee. The appeal letter must contain a clear reference to the matter being appealed and a statement of the alleged errors in the Director's decision, including the identification of specific findings and conclusions made by the Director disputed by the person filing. However, in that you are the only party of record, your appeal period is waived (assuming you do not wish to appeal this decision). Waiver of the right to appeal does not affect the effective date of this decision. APPROVAL DURATION Unless modified or appealed, the Process II decision is valid for five years from the date of issuance of the decision. Time extensions to the decision may be requested prior to the lapse of approval following Mr. Wolfe May 27, 2016 Page 2 the provisions listed in FWRC 19.15.110. The improvements must be substantially completed within the five-year time period or the land use decision becomes void. CLOSING This land use decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. This Process II approval does not constitute approval of a building permit, authorization to clear and grade, or demolish the existing building. If you have any questions regarding this decision, please contact Becky Chapin, Associate Planner, at 253-835-2641, or becky.chapin@cityoffederalway.com. Sincerely, Isaac Conlen Planning Division Manager for Scott Sproul, Acting Community Development Director enc: Approved Site Plan and Elevations Exhibit A `Findings for Process II Site Plan Review Approval' ❑: Becky Chapin, Associate Planner Ann Dower, Senior Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Peter Lawrence, Plans Examiner Vince Faranda, South King Fire & Rescue Brian Asbury, Lakehaven Utility District I5-103039 Doc. LD. 73260 F I 'ice �-___A CITY OF Federa: Way EXHIBIT A Findings for Process II Site Plan Approval Dinh-Tuyen Townhomes File #15-103039-00-UP The Planning Division hereby presents the following analysis to the Director of Community Development pursuant to content requirements of the Process Il written decision as set forth in Federal Way Revised Code (FWRC) 19.60.070. These findings are based on review of existing city documents and plans submitted by the applicant stamped received June 23, 2015, and subsequent resubmittals dated November 18, 2015, and February 18, 2016: 1. Proposal — The project applicant proposes to construct a five -unit townhouse development at 29215 Military Road South, Federal Way. Associated improvements include right-of-way dedication and improvements, stormwater management, active open space, and landscaping. The existing single- family house is to be demolished. 2. Comprehensive Plan & Zoning Designation — The subject property is within a Multi -Family Residential (RM1800) designation. The applicant's proposed townhouse (attached) dwelling unit use is permitted within the RM zoning designation pursuant to FWRC 19.205.010. Review Process — Attached dwelling units proposed in an RM zone are subject to development review procedures of Use Process II `Site Plan Review' set forth in FWRC Chapter 19.60. Use Process II review is an administrative review that requires no public notice period with a written decision issued by the Director of Community Development. Appeals of the Director's decision are heard by the city's Hearing Examiner. 4. Environmental Review — The application is exempt from review under the State Environmental Policy Act as it'does not exceed city adopted flexible thresholds set forth in FWRC 14.15.030(a) for residential structures up to twenty dwelling units. Existing Site Conditions — The subject property is a 0.34-acre parcel located at 29215 Military Road South. The site contains one single-family dwelling unit with gravel driveway. No critical areas have been identified on or adjacent to this site. Vegetation on the site consists of a mix of deciduous and evergreen trees and landscaping typical of a single-family residence. The site contains a minimal slope upwards to the west. Based on the soil survey, the on -site soils are mapped as Alderwood gravelly sandy loam with slopes of 6-15%. The property abuts Military Road South along the east property line. Surrounding zoning consists of Neighborhood Business to the north, Multi -Family Residential to the south, and Single -Family Residential to the west. 6. Height —Pursuant to FWRC 19.205.010, height is limited to 35 feet above average building elevation for attached dwelling units within RM zones. As shown on Sheets A3.1, building heights are no higher than 35 feet. Using the existing grade for each building, the following are heights of structures as defined by FWRC 19.05.080: a. Building 1: 31' —11' — ABE 441' — 6" b. Building 2: 32' — 2" — ABE 444' 7. Required Yards — Pursuant to FWRC 19.205.010, attached dwelling units are prescribed the following required yards or building setback lines: a. Front — 20 feet b. Side (each) — 5 feet c. Rear — 5 feet The proposed buildings and associated non-exempt structures are not shown within required yards on Use Process II plan sheets. 8. Parking — Pursuant to FWRC 19.205.010, attached dwelling units shall provide two parking spaces per dwelling unit. The applicant has provided two -car garages for each unit and three additional exterior spaces near the driveway entrance for a total of 13 spaces. The proposed parking accommodations exceed the 10 space minimum requirement. 9. Special Regulations — The following special regulations set forth in FWRC 19.205.010 apply to attached dwelling units within RM zoning districts. Each regulation has been satisfied per staff responses to each item: a. The allowable density is 24 units per acre. a At 0.32 acres, a total of 8 dwelling units are allowed. The applicant has proposed 5 units. b. Each building shall consist of a minimum of two units and a maximum of eight units in each grouping. • One building consisting of 3 units and one building consisting of 2 units are proposed. C. The site must contain 400sf of open space per dwelling unit with a minimum of 200sf of private open space. The remainder shall be common open space with at least 10% set -aside for children's play equipment. Common open space must be in one or more pieces, each having a length and width of at least 25ft. • Each dwelling depicts 258sf of private ground level terrace and deck for a total of 1,290sf of private open space. • 638 sf of common open space is provided between buildings 1 and 2 which includes a set - aside of 10% for children's play structure within a fenced area. The dimension of the common open space is 25ft wide and 25.5ft long. ■ As required by FWRC 19.125.060(3) the 20-foot Type III landscaping along Military Road South can be credited to the common open space requirement at 684 sf. ■ Total common open space is 1,322 sf. 10. Community Design Guidelines —As detailed below, the project embodies site and building design principles consistent with applicable requirements of the Community Design Guidelines (F)VRC Chapter 19.115). a. Crime Prevention Through Environmental Design (CPTED) • Completed CPTED checklist. • Direct pathways with main entrance towards the street. Findings for Process II Site Plan Approval Page 2 Dihn Tuyen Townhomes File #15-103039-00-UP/Dm I.D. 73259 Windows overlook the front of the unit. Open space in view of habitable rooms. Landscaping does not obstruct natural surveillance. b. Pedestrian Circulation and Public Space • Seating and children's play area provided in designated open space located centrally on the site. ■ Walkways are provided to connect all the units and run the length of the site in an east - west direction. The walkway is constructed of colored concrete to differentiate the walkway from the adjacent driveway. Lighting — The site lighting will be mounted on the north side of the townhome buildings at the ground floor, providing illumination for the pedestrian walkway, adjacent driveways and unit entries. Additional wall -mounted lighting will be provided in the common open space area. d. District Guidelines — The following is an analysis of how the proposal meets specific RM zoning district guidelines: • Common recreational spaces shall be located and arranged so that windows overlook them. ■ The common open space and tot lot is located between Buildings 1 and 2 where habitable rooms with windows overlook the play area. • Units on the ground floor shall have private outdoor spaces adjacent to them so those exterior portions of the site are controlled by individual households. ■ Each unit has a private outdoor ground floor terrace. This area is separate from the adjacent units by privacy walls. ■ All new buildings shall appear to have a roof pitch ranging from at least 4:12 to a maximum of 12:12. ■ Each unit has a roof pitch of 8:12, which is within the range. • Carports and garages in front yards should be discouraged. ■ No garages or carports are located within the front yard setback. • Residential design features, including but not limited to entry porches, projecting window bays, balconies or decks, individual windows (rather than strip windows), offsets and cascading or stepped roof forms, shall be incorporated into all buildings. Window openings shall have visible trim material or painted detailing that resembles trim. = Units include stepped roof forms, recessed unit entries with protective canopies, projecting bays, exterior decks, individual and varied windows, and various exterior sidings and finishes to emphasize building form. 11. Perimeter Landscaping — Pursuant to FWRC 19.125.060(3), the applicant is required to provide a Type III perimeter landscaping screen along the property lines. A 20-foot screen is required along Military Road South frontage and a 10-foot screen is required along the north, south, and west property lines. Findings for Process II Site Plan Approval Page 3 Dihn Tuyen Townhomes File #15-103039-00-UP/Doc. 1.M3259 Landscape Modification Request: The applicant has requested a 25 percent reduction along the north and south property lines pursuant to modification option FWRC 19.125.100. The modification is approved as it meets decisional criteria set forth in 19.125.100(3), which requires a combination of plant materials, berms a minimum of three feet in height, or architectural elements of appropriate height and scale. The site is very narrow, a reduction in landscaping allows for a 20-foot wide driveway and walkway. There will be plant material and a 6-foot fence along the property line that is a sufficient substitute for a three-foot berm. The landscape buffer along the west property line is also proposed to be modified to allow for additional back-up room for the garage parking in the adjacent townhome. The modification is approved as it meets decisional criteria set forth in 19.125.100(6). The landscape buffer adjacent to the townhome unit has been expanded and the remaining 75 percent of the required landscaping is relocated in this area. In addition there is a 6-foot fence along the west property line for additional screening. 12. Tree Retention/Replacement — Pursuant to 19.120.130(1)(b), new uses are required to meet a tree density requirement of 30 tree units per acre via retention, replacement or supplement. The subject property's net acreage (minus frontage dedication) is 0.32 acres and therefore would require 10 tree units. The landscape plan depicts that replacement trees will be installed within the landscape buffers. A total of 13.5 tree units will be provided, exceeding the minimum requirement. 13. Transportation Concurrency & Impact Fee— In 2008, Concurrency was submitted for a six -unit townhome development. The trips generated by the proposed development did not impact key intersections and therefore the application was "exempt" from further concurrency analysis. The current project is proposing fewer units and therefore generates fewer trips; no additional concurrency analysis is required. The project is subject to a transportation impact fee (TIF). The actual impact fee will be calculated based on the fee schedule in effect at the time a building pen -nit application is filed and must be paid prior to permit issuance. 14. Access Management — Vehicle and pedestrian access will be provided via a 26-foot-wide driveway off Military Road South frontage. 15. Public Improvements — The applicant will construct half -street improvements along the property's Military Road South frontage. The Type "K" street will require curb/gutter, 6-foot planter strip with street trees, 8-foot sidewalks, and street lights. The applicant will be required to dedicate 9 feet of frontage in order to meet Type K street width standards. 16. Stormwater — Drainage components shall conform to the 2009 King County Surface Water Design Manual (KCSWDM) and City amendments. The preliminary Technical Information Report indicates Full Drainage Review is required. Final review of the TIR and drainage plans is required in conjunction with the building permit applications. Basic dispersion of roof and driveway runoff has been proposed. 17. Fire Protection — Fire apparatus access road is provided as the proposed driveway meets the 20-foot minimum width and vertical clearances required. There will be two hydrants for this project, one at Findings for Process II Site Plan Approval Page 4 Dihn Tuyen Townhomes File #15-103039-00-UP/D.G J.D. 73259 the intersection with Military Road South and one internal to the site. A Certificate of Water Availability will be required when a Building Permit Application is submitted. 18. Water and Sewer — As noted above, a Certificate of Water Availability will be required as part of the building permit application submittal. The applicant will need to submit to Lakehaven an application for Certificate of Availability, in addition to a Developer Extension Agreement for Lakehaven to formally commence the water plan review process. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall project development. 19. Garbage & Recycling — As identified in the November 18, 2015, resubmittal response letter, each dwelling unit will have their own trash can and recycling bins. 20. Building Permit — Prior to site clearing or building construction, the applicant must obtain building permit approval. This Use Process II site plan approval decision does not grant building permit approval. 21. School Impact Fee — Per FWRC Chapter 19.95, a school impact fee is required for each dwelling unit, and must be paid prior to issuance of a building permit. School mitigation fee schedules are adjusted annually. Please contact the Permit Center at 253-835-2607 or pennitcenter@cityoffederalway.com for up-to-date fees. 22. Decision Criteria — Staff finds the proposal is consistent with applicable site plan approval criteria required for Process II as set forth in FWRC 19.60.050. The proposal is consistent with the city's comprehensive plan; applicable provisions of FWRC Title 19 Zoning and Development Code; public health, safety, and welfare; and streets and utilities in the area are adequate to serve the anticipated demand from the proposal. The proposal is consistent with Community Design Guidelines decisional criteria set forth in FWRC Chapter 19.115. Final construction drawings will be reviewed for compliance with specific regulations, conditions of approval, and other applicable city requirements. These findings shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. Prepared by: Becky Chapel - Associate Planner Findings for Process II Site Plan Approval Dihn Tuyen Townhomes Date: May 26, 2016 Page 5 File # 15-103039-00-UP/oo.. I D. 73259 t FILE' December 30, 2015 Jesse Wolfe 2812 Architecture 2812 Colby Avenue Everett, WA 98201 Jim Ferrell, Mayor RE: File #15-103039-00-UP; TECHNICAL COMMENT LETTER #2 Dinh -Tuyen Townhomes, 29215 Military Road South, Federal Way Dear Mr. Wolfe: The City's Development Review Committee (DRC) has completed the second round of technical review of the Process II land use application resubmittals received November 18, 2015. The proposal is to construct five new twnhomes within two buildings. Open space, landscaping, and associated site improvements are also included. TECHNICAL COMMENTS Unless otherwise noted, the following comments provided by staff reviewing your project must be addressed prior to land use approval. Please -direct questions regarding any of the technical comments to the appropriate staff representative. Ann Dower, PW Development Services 253-835-2732 ann.dower(acitvoffederalwa .com & Erik Preston. PW Traffic, 253-835-2744, ei-ik.preston@,citvoffederalway.com 1. All of the sheets must use the same base map. The parking configuration is different between sheets. 2. Show the right-of-way dedication on the cover sheet. 3. Due to alignment issues with existing and future road improvements on Military Road S, eliminate the planter strip from the frontage improvements and align the curb and gutter with the existing curb to the south. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes. Taper rate shall be WS" 2/60 or as directed by the Public Works Director. 4. Provide a standard commercial driveway cut per City of Federal Way Detail 3-6A rather than curbed radii. The 26' drive aisle width should not include the dedicated pedestrian walkway even though it is flush with the pavement. 33325 8th Avenue South, Federal Way, WA 98003-6325 - (253) 835-7000 - www.cityoffederalway.com Mr. Wolfe December 30. 2015 Page 2 6. Traffic Department staff believes the 50-foot-long 26' asphalt drive and 4' pedestrian walkway can still be achieved if the guest parking can be shifted south and some of the landscaping removed. They may also be able to add a guest parking space, or at least improve their garbage access by doing this. 7. Remove the note for a "trash 1 recycle 8" CMU Walls w/12' access gate" from the Al. 1 plan. On the cover sheet, "storm drain facilities" are listed as a public facility. Onsite facilities are privately owned and maintained. The public right-of-way improvements will be small enough that only conveyance will be required. Please clarify or remove this note. 9. The TIR will need to include all elements of Full Drainage Review. Since the project is not a single family residential or agricultural project, it does not qualify for small project drainage review. 10. King County does not keep records of drainage complaints for the City of Federal Way. Please contact Paul Heller, Engineering Technician, at 253-835-2754 for drainage complaints. Revise the downstream analysis accordingly. 11. Flow control is required for this project, since it creates more than 2,000 square feet of new or replaced impervious surface. However, your calculations indicate that Exception #l, page 1-39 (no more than 0.1 cfs increase in the existing site conditions 100-year peak flow), is applicable. This would eliminate the need for a flow control facility. However, small Lot BMP Requirements, as outlined in section 5.2.1.1 of the King County Surface Water Design Manual (KCSWDM), are still required. Revise the plans and Part D of the TIR. 12. Because the proposed pollution -generating impervious surface is now over 5,000 square feet (previously it was tinder 5,000 sf), and the value of the proposed improvements exceeds 50% of the assessed value of the existing site improvements, KCSWDM Section 1.2.8 #5 (p.1-69) under Target Surfaces applies. Water- quality treatment is required for this project. The Enhanced Basic menu applies unless the applicant can show that the project meets one of the Exceptions to allow only the Basic Menu. Revise the plans and TIR accordingly. The following items in the TIR and plans do not have to be revised at this time, but will be required prior to approval of the construction plans: I . A sediment trap is required during construction per the KCSWDM Appendix D, Sections D.3.5 and D.3.6. If perimeter protection is the only proposed rnethod of treatment, explain how the criteria for treatment outlined in Section D.3.3 is rnet. 2. Address the KCSWDM Section D.3.9 requiring flow control during construction. 3. Bonding will be required for the project. Revise Section IX of the TIR, 4. Add a streetlight south of the driveway entrance. 5. A separate Right -of -Way permit will be required for utility company work within the public right-of- way. Boring is strongly recornrnended for any work within Military Road S. If utility work (water line) requires trenching, additional paving requirements may apply. Please contact the Right -of -Way permit desk at 253-835-2725 for further information. I5-103039 Doc I D 71763 Mr. Wolfe December 30. 2015 Page 3 6. Easements granted to Puget Sound Power and Light Company and Pacific Northwest Bell Telephone Company must be relinquished as part of the right-of-way dedication. It is the developer's responsibility to obtain easement relinquishments prior to dedication. This should begin early in the development process to avoid delays. Vince Faranda South Ying Fire and Rescue 253-946-7242 vince.faranda outhkin fire.or • The required fire flow for this project is 2250 gallons per minute. The fire flow can be reduced to 1500 gallons per minute if a sprinkler system is installed. A Certificate of Water Availability shall be provided indicating the fire flow available at the site. A hydraulic fire flow model shall be requested from the water district. ■ This project will require 2 fire hydrant(s). 1 hydrant if an NFPA 13D sprinkler system is installed. Fire hydrants shall be in service PRIOR to and during the time of construction. Fire apparatus access roads shall be provided when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. EXCEPTION: When buildings are completely protected with an approved automatic fire sprinkler system, these provisions.may be modified by the chief. Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2) Shall be desib ied and maintained to support the imposed load of a 75,000 pound fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 32 foot inside turning radius and not less than a 40 foot outside turning radius. 4) Gradient shall not exceed 12 percent. • Designated fire lanes shall be required for emergency access. This may be done during the plans check or as the project progresses. When required, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction by parking and other obstructions. • Fire apparatus access roads shall be installed and made serviceable PRIOR to and during the time of construction. CLOSING When resubmitting requested information, please provide a written response to each of the above - referenced items and six copies of corrected full size plans with the enclosed resubmittal form. Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed void. 15-1030 39 Doc I D 71763 Mr. Wolfe December 30, 2015 Page 4 If you have any questions regarding this letter or your development project, please contact me at 253-835- 2641, or becky.chapin@cityoffederalway.com. Sincerely, Becky Assistant anner enc: Resubmittal Form c: Ann Dower, Senior Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Vince Faranda, South King Fire & Rescue 15-103039 Doc I.D 71763 M Mr. Wolfe December 30, 2015 Page 4 If you have any questions regarding this letter or your development project, please contact me at 253-835- 2641, or becky.chapin@cityoffederalway.com. Sincerely, Becky Ch 0� Assistant . anner enc: Resubmittal Form C. Ann Dower, Senior Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Vince Faranda, South King Fire & Rescue 15-103039 Doc LD 7176, 1 RESUBMITTED"' ENT aF CUiVi� UNITY DEVELOPMENT SERVICES 33325 8`1' Avenue South -� Federal Way, WA 98003-6325 CITY OF �' SIB; `_ °' FEB 18 2016 253-835-2607, Fax 253-835-2609 Federal Way CITY OF FEDERAL WAY Nvww.6t offcdcralwa .corn CDS RESUBMITTAL INFORMATION This completed form MUST accompany all resubmittals. "Please note. Additional or revised plans or documents for an active project will not be accepted unless accompanied by this completed form. Mailed resubmittals that do not include this form or that do not contain the correct number of copies will be returned or discarded. You are encouraged to submit all items in person and to contact the Permit Counter prior to submitting ifyou are not sure about the number of copies required. ** ANY r!,'.ANI 13ES TO D,, 7A L MSNGS MUST DE CL DUDE,. Project Number: Project Name: Project Address: Project Contact: i irvH--rvye',v lavivHOME5 t(1215- K'-A�v C�5`s wbypc RESUBMITTED ITEMS: Phone: IF OT LxpieS "" uelallea vescnpuon UI RUM ** Always submit the same number of copies as required for your initial application. Resubmittal Requested by: Letter Dated: ! 1. (5t�ember) OFFICE USE ON Y RESUB A' Z Distribution Date � � (� BY, 21E Dept/Div Name # Description Building. Planning PW Fire Other Bulletin #129 —January], 2011 Page 1 of I k:\I-Iandouts\Resubmittal Information r' 3 February 16th, 2016 Becky Chaplin Re: File #15-103039-00-UP; Technical Comment Letter Dinh Tuyen Townhomes 29215 Military RD. S. Federal Way, WA 98003 This letter is intended as a response to the Technical Comment Letter dated December 30t", 2015. All responses are in the order received on the letter, and categorized by the City department and Project Reviewer of the corresponding City Department. Ann Dower, PW Development Services: 1) All drawings have been coordinated to share the same updated base map. 2) The Right of Way dedication is now shown on the general cover sheet as well as Civil Drawing 1 of 4 3) A tapper has been added to the North side of frontage improvements 4) All plans have been revised to reflect city drive way cut requirements per Detail 3-6A. 5) The first 50'-0" of the drive aisles has been adjusted to reflect the city requirements. See DWG. A1.1 for clarification. 6) See response above. 7) Note has been removed from drawing. 8) Note has been removed from cover sheet. 9) TIR revised to address all minimum requirements and special requiremeer ITTED i , !.1 t 4 10) Report updated with information from City of Federal Way. FEB 18 2016 11) Report has been updated, specifically part B & D of section IV. ,-� �, OF FEDERAL WAY r CDS 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com 7 12) Water quality will be provided with a storm filter CB. Vince Faranda, South King Fire and Rescue: ® A certificate of water availability will be provided as soon as it is available. m Two hydrants have been included in the design for this project. One at the intersection with Military Road South and one internal to the site. All portions of the exterior of the buildings are within a 150-foot length (measured around the perimeter of the buildings) from a fire truck located adjacent to the proposed hydrant on -site. ® The access serving this project maintains a 20-foot minimum width with vertical clearances far in excess of 13.5-feet, the final design will be able to handle a 75,000 Ibs fire truck load with all-weather driving surface. No turns internal to the site are proposed and the access grades proposed are less than 5%. 49 Fire lanes will be marked as such with either site signage or lane paint. 9 This comment is addressed in responses above. This comment is addressed in responses above. Per comment letter the remaining comments have been noted and will be addressed at a later date. If you have any questions please call me at 425.252.2153 Sincerely, Jesse Wolfe 2812 Architecture 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com f O'ER vASL 8U' c c m � DATE: 12/15/15 TO: Becky Chapin FROM: Ann ❑ow nd Erik Preston SUBJECT: DINH -TUYEN TOWNHOMES - (15-103039-00-UP) 29215 MILITARY RD S; Public Works and Traffic Review MEMORANDUM Public Works Department Plans and Technical Information Report dated 11/18/15 have been reviewed. Prior to approval, the following items must be addressed: 1. All of the sheets must use the same base map. The parking configuration is different between sheets. 2. Show the right-of-way dedication on the cover sheet. 3. Due to alignment issues with existing and future road improvements on Military Road S, eliminate the planter strip from the frontage improvements and align the curb and gutter with the existing curb to the south. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety purposes. Taper rate shall be WS^2/60 or as directed by the Public Works Director. 4. Provide a standard commercial driveway cut per City of Federal Way Detail 3-6A rather than curbed radii. 5. The 26' drive aisle width should not include the dedicated pedestrian walkwa even though it is flush with the pavement. 6. Traffic Department staff believes the 50-foot long 26' asphalt drive and 4' pedestrian walkway can still be achieved if the guest parking can be shifted south and some of the landscaping removed. They may also be able to add a guest parking space, or at least improve their garbage access by doing this. 7. Remove the note for a `trash 1 recycle 8" CMU Walls w/12' access gate" from the A1.1 plan. 8. On the cover sheet, "storm drain facilities" are listed as a public facility. Onsite facilities are privately owned and maintained. The public right-of-way improvements will be small enough that only conveyance will be required. Please clarify or remove this note. 9. The TIR will need to include all elements of Full Drainage Review. Since the project is not a single family residential or agricultural project, it does not qualify for small project drainage review. 10. King County does not keep records of drainage complaints for the City of Federal Way. Please contact Paul Heller, Engineering Technician, at 253-835-2754 for drainage complaints. Revise the downstream analysis accordingly. 11. Flow control is required for this project, since it creates more than 2,000 square feet of new or replaced impervious surface. However, your calculations indicate that Exception #1, page 1-39 (no more than 0.1 cfs increase in the existing site conditions 100-year peak flow), is applicable. This would eliminate Ln need for a flow control facility. However, small Lot BMP Requirements, as outlined in section 5.2.1.1 of the King County Surface Water Design Manual (KCSWDM), are still required. Revise the plans and Part D of the TIR. 12. Because the proposed pollution -generating impervious surface is now over 5,000 square feet (previously it was under 5,000 sf), and the value of the proposed improvements exceeds 50% of the assessed value of the existing site improvements, KCSWDM Section 1.2.8 #5 (p.1-69) under Target Surfaces applies. Water quality treatment is required for this project. The Enhanced Basic menu applies unless the applicant can show that the project meets one of the Exceptions to allow only the Basic Menu. Revise the plans and TIR accordingly. The following items in the TIR and plans do not have to be revised at this time, but will be required prior to approval of the construction plans: 1. A sediment trap is required during construction per the KCSWDM Appendix D, Sections D.3.5 and D.3.6. If perimeter protection is the only proposed method of treatment, explain how the criteria for treatment outlined in Section D.3.3 is met. 2. Address the KCSWDM Section D.3.9 requiring flow control during construction. 3. Bonding will be required for the project. Revise Section IX of the TIR. 4. Add a streetlight south of the driveway entrance. 5. A separate Right -of -Way permit will be required for utility company work within the public right- of-way. Boring is strongly recommended for any work within Military Road S. If utility work (water line) requires trenching, additional paving requirements may apply. Please contact the Right -of -Way permit desk at 253-835-2725 for further information. 6. Easements granted to Puget Sound Power and Light Company and Pacific Northwest Bell Telephone Company must be relinquished as part of the right-of-way dedication. It is the developer's responsibility to obtain easement relinquishments prior to dedication. This should begin early in the development process to avoid delays. c� DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES _ NOV1 � 2oi5 Federal 33325 81h Avenue South _.. Way, WA 98003-6325 CITY OF 253-835-2607; Fax 253-835-2609 F a �� cmq1 1IDDcRAL WAY &MM ityffederahvay.coln y RESUBMITTAL INFORMATION This completed form MUST accompany all resubmittals. *'"P/ease note • Additional or re vised plans or documents for an active project will not be accepted unless accompanied by this completed form. Mailed resubmittals that do not include this form or that do not contain the correct number of copies will be returned or discarded. You are encouraged to submit all items in person and to contact the Permit Counterpnor to submitting ifyou are not sure about the number of copies required *'F ANY CHANGES TO DRAWINGS MUST BE CLOUDED. Project Number: 1 6- 1 0"Z) 0, n 17- A a -(-) F Project Name: VwN " TU', r^N 'Tuw'r 41-10l~NCS Project Address: Project Contact: RESUBMITTED ITEMS: Phone: # of Copies ** Detailed Description of Item tl1�c 5tZ J'L NS 6 ► t R � �a " Always submit the same number of copies as required toryour initial application. -- Resubmittal Requested by: 11'4Letter Dated: l l3 1201,- Member) OFFICE IlWOJVI-Y RESUB #. Distrlbutlan Date. A I y BY.- C�b Dept/Div Name # Description Building Plannin es anst PW Fire Other t+f t,'L Bulletin #129 -- January 1, 2011 Page i of I k:\Handouts\Resubmittal Information aESUB 's i 4 i ED October 15th, 2015 Becky Chaplin Re: File #15-103039-00-UP; Dinh Tuyen Townhomes 29215 Military RD. S. Federal Way, WA 98003 Nov 18 20'15 CITY OF ERAI- WAY CDs Technical Comment Letter This letter is intended as a response to the Technical Comment Letter dated August 13t", 2015. All responses are in the order received on the letter, and categorized by the City department and Project Reviewer of the corresponding City Department. Becky Chaplin, CD Planning: The drive aisle is not just 20'-0" The first 50'-0" of the drive aisle have been expanded to 26'-0" to meet city standards. The remaining drive aisle is 24'-0" wide per city standard. The drive aisle consists of a 20'-0" wide asphalt plus an additional 4'-0" concrete path that is flush with the asphalt section. The combination of these 2 features creates a drive aisle that meets city standards. See comment above. The proposed aisle for the first 50'-0" of the drive aisle has been updated to 26'-0". This includes the section adjacent to the parking stalls. This change creates a drive aisle that complies with city standards. Erik Preston, PW Traffic: The proposed drive aisles have been expanded to 26'-0" for the first 50'-0" of the drive aisle. See DWG. A1.1 Ann Dower, PW Development Services: • The Group trash enclosure has been removed. Private trash areas have been provided within the unit. 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com • The new site plan reduced the total amount of impervious surfaces proposed on the site to less than 10,000 sf. Therefore, the King County Figure 1.1.2.A was revisited and it was determined that this project is only required to provide Core Requirements 1,2,4,5,6,7 & Special Requirement 4. Therefore, flow control is no longer required and the drainage report has been revised to reflect this. In addition, the comment about providing BMPs for 2,037 sf of new impervious goes away since that is part of the flow control standards. ■ Easements have been added to site plan A1.1. Dedication documentation will be handled by the developer. Y Road Cross Section added to sheet 3. • Streetlights and Street trees now shown on site plan dwg. A1.1. Brian Asbury, Lakehaven Utility: ■ Water will be requested by contractor once they have been determined. Per comment letter the remaining comments will be addressed at a later date. If you have any questions please call me at 425.252.2153 Sincerely, Jesse Wolfe 2812 Architecture 2812 Colby Avenue P (425)252-2153 F (425)742-8130 Everett WA 98201 www.2812architecture.com FILE. August 13, 2015 Jesse Wolfe 2812 Architecture 2812 Colby Ave Everett, WA 98201 Je6,era 2SIP Jim Ferrell, Mayor RE: File #15-103039-00-UP; TECHNICAL COMMENT LETTER Dinh -Tuyen Townhomes, 29215 Military Road South, Federal Way Dear Mr. Wolfe: City staff has completed review of your Process II Master Land Use (MLU) application for the proposed Dinh-Tuyen Townhomes development. Site improvements submitted with the June 23, 2015, MLU application include construction of five new townhomes within two building. Open space, landscaping, and associate site improvements are also included. The application was deemed complete at submittal. TECHNICAL COMMENTS Unless otherwise noted, the following comments provided by staff reviewing your project must be addressed prior to land use approval. Please direct questions regarding any of the technical comments to the appropriate staff representative. Becky Cha in CD Planning, 253-835-2641 beck .cha in ci offederalwa .cone • The 20-foot-wide drive aisle does not meet the drive aisle requirements of the parking lot design criteria (enclosed) and must be widened to meet these standards. • Please depict the row width of the two surface parking stalls. The -row width must meet the parking stall size requirements of the parking lot design criteria. Erik Preston PW Traffic 253-835-2744 erik. reston(a-)citvoffederalwa .coin ■ The driveway is too narrow and should be widened to 26 feet for the first 50 feet from the traveled way. Ann Dower PW Development Services 253-835-2732 ana.dower .citvoffederal-tvay.corn • The proposed trash and recycling enclosure will require trucks to exit the site by backing onto Military Road, which is a safety hazard. Since there is no safe alternative, individual curbside 33325 8th Avenue South, Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Mr•'WOife ~ -:` f,"Augugr 13, 2A5 Page 2 recycling and trash service will be provided instead. The developer is required to keep the internal collection areas as shown on the site plan, Al.1, but may remove the group trash and recycling enclosure. ■ The TIR states that small site BMP's are not required because the difference between predeveloped and developed conditions is 0.105 cfs (for the 100 year storm). I am unaware of how that applies to BMP's. Please cite where this is referenced in the 2009 King County Surface Water Design Manual (KCSWDM). Otherwise, provide a BMP for at least 2,037 square feet of impervious area, per section 5.2.1.1 of the KCSWDM. The 0.1 cfs difference can be an exception for requiring a flow control facility (the vault), per KCSWDM 1.2.13. Exceptions (2). If the cfs difference can be reduced below 0.1 cfs through the use of BMP's, then a vault may not be necessary. ■ Show existing and proposed easements. Do not grant new easements within the right-of-way dedication area. Existing easements within the dedication area must be relinquished. It is the developer's responsibility to obtain and record the relinquishments. ■ Provide a roadway cross section showing the improvements on Military Road S. ■ Show streetlights and street trees on the site plan. The following issues do not need to be addressed until the construction drawings are submitted, but are included for informational purposes. Minimum orifice diameter is 0.25", per KCSWDM 5.4.3.1. The vault will need to be redesigned. ■ Section D.3.6 of the KCSWDM requires a sediment trap during construction. Section D.3.9 requires detention of the 10-year storm during constriction. The TESC plan will need to be revised. ■ Contrary to the statement in the TIR, a bond will be required prior to construction. Brian Asburv. Lakehaven Utility District 253-946-5407 BAsbu lakehaven.or • No application submitted to Lakehaven for either Developer Pre -Design or Developer Extension Agreement (new onsite hydrant/main). This construction will require crossing of Military Rd S (existing water main on eastern side of ROW). Open -cut will presumably be requested by Developer/Contractor (if allowed), otherwise trenchless/bore construction will be employed as necessary to avoid asphalt pavement cuts, concrete under -panel cuts &/or to reduce traffic impacts. CLOSING When resubmitting requested information, please provide a written response to each of the above - referenced items and six copies of corrected full size plans with the enclosed resubmittal form. Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed void. 15-103039 Doc I D. 70337 4 ' i Mr Wolfe August 13, 2015 Page 3 If you have any questions regarding this letter or your development project, please contact me at 253-835- 2641, or becky.chapin@cityoffederalway.com. Sincerely, Be"Cha AAFCI\- Assistant Planner enc: Parking Lot Design Criteria Handout Resubmittal Form Ann Dower, Senior Engineering Plans Reviewer Erik Preston, Senior Traffic Engineer Brian Asbury, Lakehaven Utility District 15-103039 Doc. I.D. 70337 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT DEPARTMENT DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: July 2, 2015 TO: E.J. Walsh, Development Services Manager Rob Van Orsow, Solid Waste/Recycling Coordinator Rick Perez, City Traffic Engineer Scott Sproul, Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, South King Fire & Rescue Tanya Noscimento, Federal Way School District FROM: Becky Chapin FOR DRCMTG. ON. Application is complete at intake. Please email any technical comments. becky.chapin@cityoffederalway.com FILE NUMBER(s): 15-103039-00-UP RELATED FILE NOS.: 12-103452-00-PC PROJECT NAME: DINH TUYEN Townhomes PROJECT ADDRESS: 29215 Military Road South ZONING DISTRICT.- RM 1800 PROJECT DESCRIPTION: Construct (2) new town home buildings with (5) units. Building 1 is 3,146 square feet and building 2 is 4,719 square feet. LAND USE PERMITS: Process II PROJECT CONTACT: Jesse Wolfe 2812 Architecture 2812 Colby Ave Everett, WA 98208 MATERIALS SUBMITTED: • Master Land Use Application ■ Project Narrative ■ Title Report ■ Exterior Elevations • T1R • Site, Civil, Architectural, and Landscape Plans CITY OF Federal Way APPLICATION NO(S) Project Name MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`h Avenue South Federal Way, WA 98003-6325 253-835-2607;Fax 253-835-2609 11; 1nzn-4q-t)0 UP.T1 DIHN TUYEN TOWNHOMES Property Address/Location 29215 Military Road S. Parcel Number(s) 042104-9128 JUN 23 2015 Date CITY OF FEDE=AL WAY CDS Project Description Construction of 2 new town home buildings with a total of 5 units. Building 1 is 3,146 sf, and building 2 is 4,719sf PLEASE PRIf4'1' Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone _ Land Surface Modification _ Lot Line Elimination Preapplication Conference Process I (Director's Approval) X Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only _ Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial/Residential Required Information RM 1800 Zoning Designation __dF Comprehensive Plan Designation 0 Value of Existing Improvements 1.9 Mil Value of Proposed Improvements International Building Code (IBC): R-2 Occupancy Type TvnP-V Construction Type n Applicant Name: 2812 Architecture- Jesse Wolfe Address:2812 Colb Ave. City/State:Everett, WA Zip:98208 Phone: (425)478-9978 Fax: Email:Jesse 1 2architectu re. cq� Signature:�� Agent (if different than Applicant) Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name -Andy Tran Address:915 SW 122nd St. City/State: Burien, WA zip:98146 Phone: Fax: Email: Tra ndevelo ment@yahoo.com Signature: Bulletin #003 — January 1, 2011 Page I of 1 k:\Handouts\ivlaster Land Use Application T February 11, 2015 City of Federal Way Department of Community Development Services 33325 8'h Avenue South Federal Way, Washington 98003-6325 Re: Dihn Tuyen Townhomes 29215 Military Road South Federal Way, Washington 98003 Land Use Project Narrative Project Tracking Number: 12-103452-00-PC Tax Account File Number: 0424049128 On behalf of our client, Mr. Andy Tran, we would like to submit the following project narrative for the Master Land Use application, including land use, site design and building design review topics. This letter includes a narrative of the proposed scope of work for the project, descriptions of how the proposed site and building design address the specific requirements of the city design guidelines and applicable sections of the Federal Way Revised Code; and, responses to the issues noted in the pre -application conference summary letter, dated 09.05.12. The initial sections of this narrative discuss the site and unit / building design criteria and goals, followed by more detailed notes regarding specific land use and building design requirements. Project Narrative — Site Design: The proposed project consists of five townhome units arranged in two buildings along the south side of the project site. The site has been configured with the access driveway along the northern side of the property, with the townhomes arranged in a linear fashion along the southern side. Building A consists of two townhome units with guest parking located to the east and public open space to the tr,��lilding B 61�1 LT consists of three townhome units, located to the west of the public open space. JUN 2 3 2015 CITY OF FEDERAL WAY rrzr 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 vwvw.2812architecture.com The townhome units are comprised of a ground level enclosed parking garage, containing two parking spaces for the unit, a main floor level above containing the main living, dining and kitchen spaces; and, an upper level containing the bedrooms and baths. The proposed units are 26 feet wide and 25.5 feet in depth and consist of a total of 1130 square feet of living space and 443 square feet of garage / storage space. The site contains a minimal slope upwards to the west; consequently, each townhome unit has been designed to step with the existing topography to minimize the need for grade disruption and to provide modulation of the roof lines for each building. Please see the Project Narrative — Townhome Design section below for additional notes regarding the design of the units and buildings. The site was designed to align the townhomes in a linear, row -house configuration along the south property line, to provide sunlight access to the private outdoor spaces and to the living room and master bedroom areas. The two buildings are configured with two units in Building A and three units in Building B, with the common open space area between the buildings. By locating the common open space between the two buildings, the overall facade length of the units is reduced, the common open space is centrally located, providing convenient access for the unit occupants; and, allows visual oversight of the open space duetounit windows located on the east a..nd_wesi sides. Additionally, the unit entries of the adjacent townhomes are at the northeast and northwest corners of the open space, thus providing additional oversight. The open space is proposed to be enclosed for safety on the north side with a low landscape fence with access gate, on the south side by a landscape fence, on the east and west sides by the unit exterior walls. The driveway for the project is proposed to be 20 feet wide and is located adjacent to the north landscape buffer, providing parking and fire access to each townhome unit. The west end includes an extended segment to facilitate backing of vehicles from Unit B3, please see the Land Use I Site and Building Design section below regarding the proposed landscape buffer width modification in this area. A pedestrian walkway is proposed to be located to the south of the driveway and adjacent to the townhome units. The walkway is intended to provide access from the sidewalk located in the right-of-way, as well as access between the units, the public open space, guest parking, and the trash / recycling enclosure. The path is intended to be constructed from colored and scored concrete, to visually define it from the asphalt driveway, as noted in FWRC 19.115.050(4). Additionally, special paving is also proposed to clearly delineate the individual unit entries as well as the entry to the common open space area. By locating the access pathway adjacent to the townhome units, pedestrians will not need to cross the driveway, the adjacent unit entries and windows will assist with visual surveillance of the site; and, building mounted lighting will illuminate the pathway at night for safety, without causing excessive light levels within the unit living spaces or onto the adjacent property to the north. 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com Parking for the unit occupants is provided in the enclosed two -car garage within each unit. Additionally, two guest parking stalls are provided per the pre -application conference summary letter, dated 09.05.12. The guest parking has been located to the east of Building A, so that is easily identified and accessed by visitors to the site; and, to provide a buffer between the trash / recycle enclosure and Unit Al. Interior parking lot landscaping has been provided on the west and south sides of the guest parking, please see the specifics noted in the Land Use I Site and Building Design section below. The trash and recycle enclosure is proposed to be located to the east of the guest parking, to provide easy access for the service provider as well as access to the unit occupants via the pedestrian pathway. Additionally, space has been allocated within each townhome unit for private trash and recycle collection. Please see the more detailed notes regarding the specifics of the proposed site design requirements in the Land Use I Site and Building Design section below. Project Narrative — Townhome Design: The proposed project consists of five, two -bedroom townhome units arranged in two buildings. On the ground level, each unit has a separate, private entry accessed via the site pedestrian path, as well as internally directly from the adjacent two -car garage. Within each garage is a storage recess to facilitate trash and recycle collection. A private terrace on grade is located on the south side of each unit, which is separated from the adjacent units by privacy walls on the east and west and by the landscape buffer to the south. The main and upper levels contain the main living spaces and bedrooms, with windows on the north and south sides for natural light and for visual surveillance of the site. An exterior deck is also provided adjacent to the living room to provide additional private open space for each individual unit. Due to the narrow width of the site, the building design was inspired by a traditional row -house configuration to create a feeling of community, while simultaneously giving each unit a unique identity. Each townhome unit steps slightly with the grade, to facilitate the natural topography of the site, while also allowing for modulation of the roof forms. The orientation of each unit has also been adjusted to provide privacy between adjacent units as well as to avoid repetition in each of the building's facades. The result is a gradual stepping of the building elements including roof forms, projecting bays, windows, siding and trim. The ground level of each building is comprised of a distinct base element to provide a visual connection to the site. This level will be sheathed in painted horizontal siding, to emphasis the linear nature of the connection to the site. The main and upper levels of each building comprise the middle section of the composition, separated from the base level by a horizontal trim band. This middle section utilizes vertical board and bait siding in a lighter paint color, emphasizing the vertical nature of the row house. A projecting bay is also included at the north and south sides of each unit to modulate the building facade and provide additional living space with each unit. These bays are clad in panel and batt 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com siding, painted with an accent color, to help provide modulation. Each bay has a gable roof oriented perpendicular to the main roof, providing additional facade modulation and character. Each unit entry is slightly recessed to provide a distinct entry and a sheltered area, with a canopy above for weather protection. Windows are provided at the north and south sides of each unit to bring natural light and ventilation into the main living spaces on each level; and, provide oversight of the adjacent portions of the site for security. Additional windows on the east and west sides of the end units provide visual oversight of the adjacent public open space and guest parking areas. Please see additional specific notes as they relate to the community design guidelines in the Land Use Site and Building Design section below. Land Use I Site and Building Design: Zoning — FWRC 19.205.010, Note 1: The project is located within the RM 1.8, Multi -Family zone, with townhomes permitted subject to the regulations in FWRC as attached dwelling units, at a density of 24 units per acre. The site consists of 14,496 square feet total, minus the required 9 foot wide right-of-way dedication (noted below) of 602 square feet, resulting in a total site area of 13,894 square feet. This results in an allowable density of 8 units; consequently, the proposed 5 units are within the density allowed per FWRC 19.205.010. Yards — FWRC 19.205.010: Required yards per the Use Zone Chart are 20 foot front setback and 5 foot side and rear yard setbacks. However, other land use requirements determine the proposed building setbacks, including landscape buffer requirements and right-of-way improvements, which are discussed in further detail below. Right -of -Way Improvements I Dedication — FWRC 19.135.210: Based on the designation of Military Road South as a Principal Arterial, Type "K" Street, a 78 foot right-of-way is required, resulting in a 9 foot right- of-way dedication requirement for this project. The 9 foot dedication is depicted on the site plan, as well as the assumed symmetrical cross section roadway width of 44 feet (including curb and gutter), the 6 foot wide planter strip and 8 foot wide sidewalk. Landscape Buffers — FWRC 19.125.060 (3)(a) & (3)(c): A 20 foot wide Type III perimeter landscape buffer is required along the east property line (Military Road South); and, 10 foot wide Type III perimeter landscape buffers are required along the north, south and west property lines. The project proposes to comply with the landscape buffer requirements as follows: 1. East Property Line (Military Road South): The required 20 foot wide landscape buffer will be provided and is depicted on the site plan per FWRC 19.125.060(3)(a). 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com 2. North and South Property Lines: The required 10 foot wide landscape buffer is proposed to be modified according to the option outlined in FWRC 19.125.100(6). Due to the narrow width of the site, the allowable 25% reduction in landscape area will allow for a 20 foot wide driveway (minimum allowed for fire access), a 4 foot wide pedestrian site access walkway, a 20 foot deep garage for the dwelling units (minimum practical depth); and, a 5.5 foot wide outdoor living space on grade for the unit occupants. At the south property line, the adjacent property is zoned RM 1.8; and, at the north property line, the adjacent property is zoned BN. Consequently, the adjacent abutting properties are of the same or more intensive land use zoning, as required by subsection (6) for the 25% landscape buffer area reduction. Additionally, the proposed townhome units do not overhang into the proposed 7.5 foot landscape buffers. Please see the site plan for the associated area calculations for the proposed buffer reduction. 3. West Property Line: The required 10 foot wide landscape buffer is also proposed to be modified according to the options in FWRC 19.125.100(5) and (6). The adjacent property to the west is zoned RM1.8; and thus, is of the same land use intensity as the project site. Consequently, the west landscape buffer area is proposed to be reduced by 25%, per subsection (6). Additionally, the resulting landscape buffer area is proposed to be averaged per subsection (5). The resulting buffer provides for the minimum 50% reduced buffer width of 5 feet; and, the southwest portion of the buffer, adjacent to the townhome unit has been expanded. This proposal will allow for additional back-up room for the garage parking in the adjacent townhouse unit B3, as well as provide additional landscape buffer between the proposed new townhouse unit B3 and the existing apartment building on the adjacent property. Please see the site plan for the area calculations for the proposed buffer reduction and averaging. Open Space — FWRC 19.205.010, Note 6: 400 square feet of open space per unit is required per Note 6, resulting in a total of 2000 square feet required for the proposed project. 200 square feet per unit is required for private open space; and, the balance provided in common open space. Additionally, as the proposed project contains more than 4 units, the common open space is required to have a length and width of 25 feet minimum for each dimension. 1. Public Open Space: The proposed public open space consists of a centrally located open space / children's play area and the landscape buffer along the east property line. The centrally located open space is 25 feet wide and 25.5 feet in depth, as per the minimum open space dimension requirement. Additionally, the southern portion of the open space is proposed to include children's play equipment in excess of the minimum 10% area required. 2. Private Open Space: 258 square feet of private open space is proposed for each townhome unit, comprised of a ground level terrace and main level deck, accessed via the main living space, which exceeds the minimum 200 square foot per unit requirement. 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com 3. Total Open Space: The resulting proposed open space area is 2,612 square feet, which exceeds the minimum 2000 square foot requirement. Please see the site plan for the area calculations for the open space requirement. Guest Parking — FWRC 19.130.020(2): Two guest parking spaces have been provided as noted in the pre -application conference summary letter, dated 09.05.12; and, parking lot landscaping per FWRC 19.125.070 has also been provided. The pre -application conference letter notes that 20 square feet of interior lot landscaping is required; however, subsection (a)(ii) notes a 15 square foot requirement for residential projects. 123 square feet of Type IV interior landscaping is proposed, exceeding the 30 square foot total requirement, please see the site plan for the area calculation. Trash I Recycle Enclosure — FWRC 19.125.150: As noted above, each townhome unit contains a recessed area within the garage for the collection of individual trash and recycling. A common trash recycle enclosure is proposed at the east side of the property, to provide access for the service provider. Each unit is connected to the common trash enclosure by the main pedestrian pathway, which leads to a separate entrance gate to the enclosure. The enclosure footprint is 224 square feet, with an interior space of 193 square feet; and, the main access gates have been angled to facilitate servicing from the driveway. The walls of the enclosure are proposed to be solid and screened on the east by the 20' wide landscape buffer and on the south by the proposed perimeter landscape buffer per FWRC 19.125.040 (4) and (5). Community Design Guidelines — FWRC 19.115.050 Site Design: 1. Pedestrian Amenities — Sections (1)(b) & (c): A public open space is located centrally on the site, to provide easy access from the townhome units. The open space is accessed via the main site walkway, which runs the length of the site in an east -west direction. The open space consists of a children's play area, an open terrace with benches and adjacent landscaping. Due to the central location, the open space is easily recognized and accessed from each unit via the adjacent walkway. The open space is enclosed on the east and west, with unit windows overlooking for security; and, is open on the north and south sides to allow natural sunlight and views to the perimeter landscaping. 2. Design Continuity — Section (1)(d): The design of the townhome buildings uses similar architectural elements of roof forms, projecting bays, windows, siding and trim for continuity between each townhome and each building. Siding materials and colors are used to emphasize the different elements of the buildings and will be consistent throughout the project. 3. Natural Surveillance — Section (1)(e): All public areas of the site are located to be highly visible and are subject to visual surveillance. The trash / recycle enclosure and guest parking are located near the entrance to the site; and, windows in the townhome adjacent provide oversight. The main driveway is visible from the majority of the site and from the townhome interiors via windows and the main unit entries. The public open space is visible from the driveway and pedestrian walkway to the north; and, from the townhome units located on either side. 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com 4. Ownership Reflection — Section (1)(g): Each of the townhome units has an individual entry, which has been slightly recessed for weather protection and to provide a small space for personalization of the entry. Special paving is proposed at each entry as well, to distinguish each entry. A low fence is proposed at the common open space, for protection and to add character to the area. A perimeter security fence is also proposed at the north, south and west property lines to provide protection for the site and for the individual outdoor terraces on the south side of each of the townhome units. 5. Pedestrian Pathways - Section (4)(a), (b) & (c): As noted above, a centrally located pedestrian walkway provides the main circulation path from the public right-of-way though the site. The pedestrian walkway connects the individual townhome units to the common site features of public open space, guest parking and trash / recycle enclosure; and, continues to the public sidewalk. The walkway is intended to be constructed of colored concrete, to differentiate the walkway from the adjacent asphalt driveway. Additionally, special paving is proposed at the entries to each townhome unit and the common open space. 6. Outdoor Furniture — Section (4)(e): Site benches and outdoor lighting are proposed at the common open space; and, the pedestrian walkway will be lit along its length by adjacent building lights at the townhome unit entries and between garage doors. 7. Site Lighting — Section (7)(a): The majority of the site lighting will be located along the central pedestrian walkway, which will provide illumination for the walkway, adjacent driveway and the unit entries. Consequently, the site lighting will be sufficient for those areas that require illumination for safety; but, will not spill onto adjacent properties. _ rJ Community Design Guidelines — FWRC 19.115.090 Section (4)(c) District Guidelines: 1. Light Fixtures — Section (1)(j): As noted above, the site lighting will be mounted on the north side of the townhome buildings at the ground floor, providing illumination for the pedestrian walkway, the adjacent driveway and the unit entries. 2. Common Open Spaces — Section (1)(1): The proposed common open space is located between the two townhome buildings, with windows from the adjacent townhome units A2 and B1 providing oversight. 3. Private Outdoor Spaces — Section (1)(m): Each townhome unit has a private outdoor space on the ground level, which is separated from the adjacent units by privacy walls and the perimeter landscape buffer. 4. Roof Pitch — Section (1)(n): The proposed roof pitch is 8:12, which is within the 4:12 to 12:12 range required. 5. Garages — Section (1)(o): No garages or carports are proposed within the front yard setback. 6. Design Features — Section (1)(r): Residential design features that have been incorporated into the design of the townhome buildings and units include stepped roof forms, recessed unit entries with protective canopies above, projecting bays, upper level exterior decks, individual and varied window 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com shapes, varied siding materials and colors to emphasize building forms, and window, door and siding trim. Crime Prevention Through Environmental Design — FWRC 19.115.010(2): Section 1.0 Natural Surveillance 1.1 Blind Corners: The pedestrian walkway runs straight through the site and is visible from the adjacent units, the driveway, the common open space and the right-of-way. 1.2 Site and Building Layout: The main townhome entrances are oriented towards the access driveway and are visible from the right-of-way. Windows from the main entry, kitchen, dining room, master bath and second bedroom overlook the front of the unit, adjacent pedestrian walkway and the driveway. Multiple windows on the north and south sides of the units (and east and west sides of the end units) provide oversight of the adjacent areas while protecting privacy. The guest parking area is located off the main pedestrian walkway and is visible from the walkway, the driveway and windows in the adjacent townhome unit. The common open space is clearly designated and accessed via the main pedestrian walkway; and, is visible from the walkway, the driveway and from windows in the adjacent units. 1.3 Common Open Space: Windows in the adjacent townhome units overlook the common open space, which is also visible from the adjacent pedestrian walkway and from the driveway. The unit entries for the adjacent townhomes are located at the northeast and southeast corners of the common open space for further oversight. The trash / recycle enclosure is fully screened; however, it is located at the main entrance to the project and is visible from the driveway, guest parking area, and the adjacent townhome unit to the west. 1.4 Entrances: The townhome entries are slightly recessed to allow visitors to stand out of the walking path and out of the weather; however, the entries are clearly visible from the adjacent walkway and driveway, prior to entering. 1.5 Fencing: Security fencing is proposed at the north, south and west property lines. The proposed fence at the north side of the common open space is intended to be 42" high with an open design to allow visibility in both directions, while also providing safety so that children can be within a protected enclosure. 1.6 Landscaping: Please see the proposed landscape plan for details of tree, shrub and groundcover spacing and sizing, to maintain visibility around the common open space, guest parking area and trash / recycle enclosure. The townhouse unit entries are fully visible. 1.7 Exterior Lighting: As noted above, the majority of the site lighting will be building wall mounted lights along the main pedestrian walkway, which forms the circulation spine for the project. These lights will provide illumination for the walkway, unit entries, garage entries and along the length of the driveway. Additional wall mounted lighting will be provided in the common open space and in the trash / recycle enclosure. Elevated light fixtures are not proposed for this project. The pedestrian walkway will constitute the "safe route" as it represents the sole path for pedestrians to traverse the site. 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com 1.8 Mix of Uses: Not applicable for this project. 1.9 Security Bars, Shutters and Doors: Not applicable for this project. Section 2.0 Access Control: 2.1 Building Identification: The project is proposed to have a name and street numbers visible from the right of way; and, each townhome unit will have an identifying building and unit number. 2.2 Entrances: The townhome unit entries are easily recognizable by special paving, the recessed entry alcove, wall mounted entry light, and the protective canopy above. 2.3 Landscaping: The site has landscape buffers on all four sides; and, a security landscape fence is proposed along the north, south and west property lines. 2.4 Landscape Location: No landscaping is proposed that would allow access to upper level windows or decks. 2.5 Security: Each townhome unit will be individually keyed for secure access by the tenants. 2.6 Signage: Not applicable for this project. Section 3.0 Ownership 3.1 Maintenance: Each townhome unit has a separate entry, with a recessed alcove, to allow space for personalization by the tenants. 3.2 Materials: The benches installed in the common open space are proposed to be permanently secured to the concrete terrace. For further questions regarding the project please contact us at (425)252-2153 or by email at jesse _2812architecture.com. Jesse Wolfe 2812 architecture 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com r� CIT Federal Way DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8"' Avenue South Federal Way, WA 98003-6325 253-835-2607;Fax 253-835-2609 www.dUaffederalway.com Crime Prevention Through Environmental Design (CPTED) Checklist Directions Please fill out the checklist to indicate which strategies have been used to implement CPTED principles in your proposed project. Please check all strategies that are applicable to your project for each of the numbered guidelines. You may check more than one strategy for each guideline. Your responses will be evaluated by City Staff, and will be integrated into the Site Plan and/or Building Permit review process. Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy ■ Applicable during Site Plan Review 6 Applicable during Building Permit Review Section 1.0 Natural Surveillance 1.1 Blind Corners —Conforms Avoid blind corners in pathways and parking lots. _Revise _NA Comments: Pathways should be direct. All barriers along pathways should 14 be permeable (see through) including landscaping, fencing etc. ■ Consider the installation of mirrors to allow users to see ahead of them and around corners. e Other strategy used: 1.2 Site and Building Layout TConforms Allow natural observation from the street to the use, from the —Revise use to the street, and between uses _NA Comments: Bulletin #022 — January 1, 2011 Page 1 of 9 k:\Handouts\CPTED Checklist '—t Section and ✓ Functional Area Performance Performance Standard Standard Strategy f Applicable during Site Plan Review e Applicable during Building Permit Review Orient the main entrance towards the street or both streets on For Non -Single corners. ■ Family Development Position habitable rooms with windows at the front of the dwelling. ■ Access to dwellings or other uses above commercial/ retail development should not be from the rear of the building. A Offset windows, doorways and balconies to allow for natural observation while protecting privacy. ■ ❑ Locate main entrances/exits at the front of the site and in view of the street. ■ For Commercial/ Retail/ Industrial If employee entrances must be separated from the main and Community ❑ entrance, they should maximize opportunities for natural Facilities surveillance from the street. ■ In industrial developments, administration/offices should be located at the front of the building. a Avoid large expanses of parking. Where large expanses of For Surface ❑ parking are proposed, provide surveillance such as security Parking and NA cameras. ■ Parking Structures Access to elevators, stairwells and pedestrian pathways should be clearly visible from an adjacent parking area. ■ ® Avoid hidden recesses. ■ ® Locate parking areas in locations that can be observed by adjoining uses. ■ Open spaces shall be clearly designated and situated at For Common/ locations that are easily observed by people. Parks, plazas, Open Space common areas, and playgrounds should be placed in the front Areas of buildings. Shopping centers and other similar uses should face streets. ■ Other strategy used: 0 Bulletin #022 — January 1, 2011 Page 2 of 9 Evaluation for Agency Use Only k:\Handouts\CPTED Checklist Ohl Section and Performance Standard 1.3 ✓ IFunctional Area Performance Standard Strategy ■ Applicable during Site Plan Review 6 Applicable during Building Permit Review Evaluation for Agency Use Only Common/Open Space Areas and Public On -Site Open —Conforms Space —Revise Provide natural surveillance for common/open space areas. _NA Comments: Position active uses or habitable rooms with windows adjacent to main common/open space areas, e.g. playgrounds, swimming pools, etc., and public on -site open space. ■ Design and locate dumpster enclosures in a manner which screens refuse containers but avoids providing opportunities to hide. ■ Locate waiting areas and external entries to elevators/stairwells ❑ close to areas of active uses to make them visible from the NA building entry. e I4 Locate seating in areas of active uses. e Other strategy used: El 1.4 Entrances —Conforms Provide entries that are clearly visible. —Revise _NA Comments: Design entrances to allow users to see into them before entering. M Entrances should be clearly identified (Signs must conform to ❑ FWRC 19.140.060. Exempt Signs. (Applicable during Cer# acate of OccupancyOccupawy Ins ection . Other strategy used: 1.5 Fencing —Conforms Fence design should maximize natural surveillance from the Revise street to the building and from the building to the street, and _NA minimize opportunities for intruders to hide. Comments: Bulletin #022 — January 1, 2011 Page 3 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Performance Performance Standard Standard Strategy i Applicable during Site Plan Review 6 Applicable during Building Permit Review Front fences should be predominantly open in design, e.g. pickets or wrought iron, or low in height. e Design high solid front fences in a manner that incorporates ❑A oepen elements to allow visibility above the height of five feet. If noise insulation is required, install double -glazing at the ❑ front of the building rather than solid fences higher than five NA feet. e Evaluation for Agency Use Only Other strategy used: ri 1.6 Landscaping .Conforms Avoid landscaping which obstructs natural surveillance and _Revise allows intruders to hide. _NA Continents: Trees with dense low growth foliage should be spaced or their crown should be raised to avoid a continuous barrier. ■ Use low groundcover, shrubs a minimum of 24 inches in height, or high -canopied trees (clean trimmed to a height of eight feet) around children's play areas, parking areas, and along pedestrian pathways. 0 ® Avoid vegetation that conceals the building entrance from the street. r Other strategy used: El 1.7 Exterior Lighting Conforms Provide exterior lighting that enhances natural surveillance. —Revise (Refer to FWRC 19.115.050(7)(a) for specific lighting _NA requirements.) Comments: Prepare a lighting plan in accordance with Illuminating Engineering Society of America (IESA) Standards, which [R addresses project lighting in a comprehensive manner. Select a lighting approach that is consistent with local conditions and crime problems. ■ Bulletin #022 - January 1, 2011 Page 4 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Performance Performance Standard Standard Strategy 0 Applicable during Site Plan Review 6 Applicable during Building Permit Review Locate elevated light fixtures (poles, light standards, etc.) in a ❑ coordinated manner that provides the desired coverage. The useful ground coverage of an elevated light fixture is roughly NA twice its height. ■ For areas intended to be used at night, ensure that lighting ® supports visibility. Where lighting is placed at a lower height to support visibility for pedestrians, ensure that it is vandal - resistant. e ® Ensure inset or modulated spaces on a building facade, access/egress routes, and signage is well lit. e In areas used by pedestrians, ensure that lighting shines on pedestrian pathways and possible entrapment spaces. e Place lighting to take into account vegetation, in its current and ® mature form, as well as any other element that may have the potential for blocking light. e Avoid lighting of areas not intended for nighttime use to avoid giving a false impression of use or safety. If danger spots are usually vacant at night, avoid lighting them and close them off to pedestrians. e Select and light "safe routes" so that these become the focus of legitimate pedestrian activity after dark. M ❑ Avoid climbing opportunities by locating light standards and NA electrical equipment away from walls or low buildings. e Use photoelectric rather than time switches for exterior lighting. e In projects that will be used primarily by older people (retirement homes, congregate care facilities, senior and/ or NA community centers, etc.) provide higher levels of brightness in public/common areas. e Other strategy N 1.8 Mix of Uses NA In mixed use buildings increase opportunities for natural surveillance, while protecting privacy. Evaluation for Agency Use Only ,Conforms .Revise NA Comments: Bulletin #022 —January 1, 2011 Page 5 of 9 k:\Handouts\CPTED Checklist Section and Performance Standard ✓ Functional Area Performance Standard Strategy a. Applicable during Site Plan Review 6 Applicable during Building Permit Review Evaluation for Agency Use Only Where allowed by city code, locate shops and businesses on lower floors and residences on upper floors. In this way, ❑ residents can observe the businesses after hours while the residences can be observed by the businesses during business hours. ■ ❑ Include food kiosks, restaurants, etc. within parks and parking structures. i Other strategy: used 1.9 NA Security Bars, Shutters, and Doors —Conforms When used and permitted by building and fire codes, security —Revise bars, shutters, and doors should allow observation of the street ,_,_,NA and be consistent with the architectural style of the building. Comments: ❑ Security bars and security doors should be visually permeable (see -through). e Other strategy used: El Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy ■ Applicable during Site Plan Review e Applicable during Building Permit Review Section 2.0 Access Control 2.1 Building Identification —Conforms Ensure buildings are clearly identified by street number to —Revise prevent unintended access and to assist persons trying to find _NA the building. Identification signs must conform to FWRC Comments: 19.140.060. Exempt Signs. Street numbers should be plainly visible and legible from the street or road fronting the property. e Bulletin #022 —January 1, 2011 Page 6 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Performance Performance Standard Standard Strategy ■ Applicable during Site Plan Review e Applicable during Building Permit Review In residential uses, each individual unit should be clearly numbered. In multiple building complexes, each building entry ® should clearly state the unit numbers accessed from than entry. In addition, unit numbers should be provided on each level or floor. e Street numbers should be made of durable materials, preferably reflective or luminous, and unobstructed (e.g. by foliage). e For larger projects, provide location maps (fixed plaque ❑ format) and directional signage at public entry points and along NA internal public routes of travel. e Evaluation for Agency Use Only Other strategy used: 2.2 Entrances Conforms Avoid confusion in locating building entrances. —Revise _NA Comments: Entrances should be easily recognizable through design �J features and directional signage. (Signs must conform to FWRC 19.140.060. Exempt Signs. ■ IC4 Minimize the number of entry points. ■ Other strategy used: 2.3 Landscaping _Conforms Use vegetation as barriers to deter unauthorized access. _Revise _NA Comments: ❑ Consider using thorny plants as an effective barrier. e Other strategy used: all fni it chips of site 2.4 Landscaping Location —Conforms Avoid placement of vegetation that would enable access to a _Revise building or to neighboring buildings. __NA Comments: Bulletin #022 — January 1, 2011 Page 7 of 9 k:\Handouts\CPTED Checklist r Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy ■ Applicable during Site Plan Review e Applicable during Building Permit Review Avoid placement of large trees, garages, utility structures, ® fences, and gutters next to second story windows or balconies that could provide a means of access. ■ Other strategy used: 2.5 Security —Conforms Reduce opportunities for unauthorized access —Revise —NA Comments: Consider the use of security hardware and/or human measures t4 to reduce opportunities for unauthorized access. (Applicable during CertiLcate of OccunaMcv InS ection. Other strategy used: .❑ 2.6 NA Signage _Conforms Insure that signage is clearly visible, easy to read and simple to _Revise understand [Signs must conform to FVWRC 19.140.060. Exempt —NA Signs]. Comments: ❑ Use strong colors, standard symbols, and simple graphics for informational signs. e Upon entering the parking area, provide both pedestrians and For Surface ❑ drivers with a clear understanding of the direction to stairs, Parking and elevators, and exits. e Parking Structures In multi -level parking areas, use creative signage to distinguish ❑ between floors to enable users to easily locate their cars. e ❑ Advise users of security measures that are in place and where to find them, i.e. security phone or intercom system. e ❑ Provide signage in the parking area advising users to lock their cars. e Bulletin #022 — January 1, 2011 Page 8 of 9 k:\Handouts\CPTED Checklist Section and ✓ Functional Area Evaluation for Performance Performance Standard Agency Use Only Standard Strategy ■ Applicable during Site Plan Review e Applicable during Building Permit Review ❑ Where exits are closed after hours, ensure this information is indicated at the parking area entrance. e Other strategy used: Section 3.0 Ownership 3.1 Maintenance Conforms Create a "cared for" image —Revise _NA Comments: Ensure that landscaping is well maintained, as per FWRC 19.125.090, in order to give an impression of ownership, care, and security. (Ongoing). Where possible, design multi -unit residential uses such that no �Q more than six to eight units share a common building entrance. ■ Other strategy used-- 3.2 Materials Conforms Use materials, which reduce the opportunityfor vandalism. —Revise _NA Comments: Consider using strong, wear resistant laminate, impervious glazed ceramics, treated masonry products, stainless steel ❑ materials, anti -graffiti paints, and clear over sprays to reduce NA opportunities for vandalism. Avoid flat or porous finishes in areas where graffiti is likely to be a problem. e Where large walls are unavoidable, refer to FWRC NA 19.125.040(21) regarding the use of vegetative screens. e Common area and/or street furniture shall be made of long wearing vandal resistant materials and secured by sturdy anchor points, or removed after hours. e Other strategy used: Bulletin #022 - January 1, 2011 Page 9 of 9 k:\Handouts\CPTED Checklist Letter of Transmittal June 23, 2015 TO: City of Federal Way 33325 8th Avenue South Federal Way, WA 98003-6325 Attn.: Becky Chapin Process II Submittal: Dihn Tuyen Townhomes TRANSMIT: (1) Process II Application (1) Process II Checklist (2) Title Reports (4) Civil TIR Report (4) Design Narratives (8) Full Size Drawing Sets (8) Material Boards Sincerely, Jesse Wolfe 2812 Architecture Job. No. 12c-3264 RECEIVEV JUN 2 3 2015 CITY OF FEDERAL WAY CDS 2812 Colby Avenue Everett WA 98201 P (425)252-2153 F (425)742-8130 www.2812architecture.com SUBDIVISION Issued By: *,) CHICAGO TITLE INSURANCE COMPANY CHICAGO TITLE INSURANCE COMPANY a corporation, herein called the Company GUARANTEES Lisa Tran and the City of Federal Way Guarantee/Certificate Number: 0032755-06 herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A. LIABILITY EXCLUSIONS AND LIMITATIONS 1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A or with respect to the validity, legal effect or priority of any matter shown therein. 2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount set forth in Schedule A. Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you wish additional liability, or assurances other than as contained herein, please contact the Company for further information as to the availability and cost. Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Countersigned By:,w� Authorized Officer or Agent Subdivision Guarantee/Certificate Chicago Title Insurance Company By: Attest: President Secretary JUN 2 3 2015 CITY OF FEDEriAL WAY CDS Printed: 02.19.15 @ 01:38PM Page 1 WA-CT-FNSE-02150.622476-SPS-1-15-0032755-06 CHICAGO TITLE INSURANCE COMPANY SCHEDULE B (continued) GUARANTEE/CERTIFICATE NO. 0032755-06 A deed of trust to secure an indebtedness in the amount shown below, Amount: $209,000.00 Dated: August 30, 2005 Trustor/Grantor: Tuyen N. Dinh and Thuy T. Tran, husband and wife Trustee: Ticor Title Company Beneficiary: Argent Mortgage Company Loan No.: 0086092277-9503 Recording Date: September 14, 2005 Recording No.: 20050914001239 An assignment of the beneficial interest under said deed of trust which names: Assignee: Deutsche Bank National Trust Company, as trustee for, Argent Securities Inc. Asset -backed Pass -through Certificates, Series 2005-W4, under the Pooling and Servicing Agreement dated November 1, 2005 Loan No.: 4000875494 Recording Date: February 20, 2009 Recording No.: 20090220001002 7. Your application for title insurance was placed by reference to only a street address or tax identification number. Based on our records, we believe that the legal description in this report covers the parcel(s) of Land that you requested. If the legal description is incorrect, the seller/borrower must notify the Company and/or the settlement company in order to prevent errors and to be certain that the correct parcel(s) of Land will appear on any documents to be recorded in connection with this transaction and on the policy of title insurance. END OF EXCEPTIONS NOTES The following matters will not be listed as Special Exceptions in Schedule B of the policy. There will be no coverage for loss arising by reason of the matters listed below because these matters are either excepted or excluded from coverage or are not matters covered under the insuring provisions of the policy. Note A: Note: FOR INFORMATIONAL PURPOSES ONLY: The following may be used as an abbreviated legal description on the documents to be recorded, per Amended RCW 65.04.045. Said abbreviated legal description is not a substitute for a complete legal description within the body of the document: Prtn of NE 1/4 of Section 4-21 N-4E Tax Account No.: 042104-9128-05 Note B: Note: Any map furnished with this Commitment is for convenience in locating the land indicated herein with reference to streets and other land. No liability is assumed by reason of reliance thereon. END OF NOTES Subdivision Guarantee/Certificate END OF SCHEDULE B Printed: 02.19.15 @ 01:36PM Page 6 WA-CT-FNSE-02150.622476-SPS-1-15-0032755-06 CHICAGO TITLE INSURANCE COMPANY GUARANTEE/CERTIFICATE NO. 0032755-06 Title Officer: Commercial / Unit 6 Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Main Phone: (206)628-5610 SCHEDULE A Liability Premium Tax $1, 000.00 $350.00 $33.25 Effective Date: February 13, 2015 at 08:OOAM The assurances referred to on the face page are: That, according to those public records which, under the recording laws, impart constructive notice of matter relative to the following described property: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF Title to said real property is vested in: Tuyen N. Dinh and Thuy T. Tran, husband and wife subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their priority. END OF SCHEDULE A Subdivision Guarantee/Certificate Printed: 02.19.15 @ 01:38PM Page 2 WA-CT-FNSE-02150.622476-SPS-1-15-0032755-06 EXHIBIT "A" Legal Description That portion of the southwest quarter of the northeast quarter of Section 4, Township 21 north, Range 4 East, W.M., in King County, Washington, described as follows: Beginning at a point of the west line of said subdivision distance north 00°24'24" west 1,238.80 feet; Thence south 89°57'39" east parallel with the south line of said subdivision of the westerly line of Old Military Road Revision as conveyed to King County by deed recorded under recording number 3022385 and the true point of beginning; Thence north 89057'39" west 215 feet; Thence south 00°02'21" west 65 feet; Thence south 89057'39" east to the westerly line of said Old Military Road; Thence northerly along the said westerly line to the true point of beginning. Subdivision Guarantee/Certificate Printed: 02.19.15 @ 01:38PM Page 3 WA-CT-FNSE-02150.622476-SPS-1-15-0032755-06 CHICAGO TITLE INSURANCE COMPANY SCHEDULE B GENERAL EXCEPTIONS GUARANTEE/CERTIFICATE NO. 0032756-06 H. Reservations and exceptions in United States Patents or in Acts authorizing the issuance thereof. Subdivision Guarantee/Certificate Printed: 02.19.15 0 01:38PM Page 4 WA-CT-FNSE-02150.822476-SPS-1-15-0032755-05 CHICAGO TITLE INSURANCE COMPANY SCHEDULE B (continued) SPECIAL EXCEPTIONS GUARANTEE/CERTIFICATE NO. 0032755-06 Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: Pacific Northwest Bell Telephone Company, a Washington corporation Purpose: Underground communication lines Recording Date: June 4, 1990 Recording No.: 9006040764 Affects: The east 4 feet Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: Puget Sound Power and Light Company, a Washington corporation Purpose: Electric transmission and/or distribution lines Recording Date: March 4, 1991 Recording No.: 9103040481 Affects: South 40 feet of the east 3 feet 3. Right to make necessary slopes for cuts or fills upon property herein described as granted or reserved in deed In favor of: King County Recording Date: December 2, 1938 Recording No.: 3022385 4. Terms and conditions of notice of charges by water, sewer, and/or storm and surface water utilities, recorded under recording number 8106010916. 5. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties): Year: 2015 Tax Account No.: 042104-9128-05 Levy Code: 1205 Assessed Value -Land: $72,000.00 Assessed Value -Improvements: $113,000.00 General and Special Taxes: Billed: $2,724.87 Paid: $0.00 Unpaid: $2,724.87 Note: If the tax amount is not evenly divisible into two payments, King County will require the half payment to be rounded up to the next cent. Failure to round up the half payment may result in rejection of the tax payment by the county. Subdivision Guarantee/Certificate Printed: 02.19.15 @ 01:38PM Page 5 WA-CT-FNSE-02150.622476-SPS-1-15-0032755-06 Ann Dower From: Erik Preston Sent: Wednesday, December 02, 2015 3:50 PM To: Becky Chapin Cc: Ann Dower; Sarady Long Subject: Dinh Tuyen Townhomes TR Comments Follow Up Flag: Follow up Flag Status: Flagged Becky, As discussed, I feel a quick meeting in person would be the most efficient way to effectively communicate my comments, summarized below, to the applicant and their design team: The 26' drive aisle width should not include the dedicated pedestrian walkway even though it is flush with the pavement. + 1 believe the 50-foot long 26' asphalt drive and 4' pedestrian walkway can still be achieved if the guest parking can be shifted south and some of the landscaping removed. They may also be able to add a guest parking space, or at least improve their garbage access by doing this. • The southern curb radius opening does not align with the southern drive -aisle curb line and must move south about 4 feet. The curb radii are too small to safely accommodate inbound and outbound traffic to/from the 40 mph street. A minimum 25-foot radius would be required on the north and south side of the driveway opening. If smaller radii are desired, an Auto -Turn turning analysis should demonstrate that a delivery truck/moving van/garbage truck can enter without encroaching on the exiting traffic. Please check if the landscaping they show can be reduced south of the guest parking. Erik x.2744 DIHN TUYEN TOWNHOMES TIR SITE LOCATION: 29215 Military Road S. Federal Way, WA 98003 OWNER: Andy Tran APPLICANT: 2812 Architecture Adam Clark, AIA 2812 Colby Ave. Everett, WA 98201 Prepared by: Joseph M. Smeby, P.E. Job No: 13-0206 May 2015 Revised: Oct. 2015 Feb. 2016 RESUBMITTED FEB 18 2016 Ca Y OF FEDERAL WAY CDS TABLE OF CONTENTS I. PROJECT OVERVIEW.............................................................................................1 II. CONDITIONS AND REQUIREMENTS SUMMARY..................................................4 A. Core Requirement #1: Discharge at the Natural Location........................:...........4 B. Core Requirement #2: Off -site Analysis................................................................4 C. Core Requirement #3: Flow Control......................................................................4 D. Core Requirement #4: Conveyance System.........................................................4 E. Core Requirement #5: Temporary Erosion and Sediment Control Plan................4 ........... F. Core Requirement #6: Maintenance & Operation .................................................. G. Core Requirement #7: Financial Guarantees & Liability........................................4 H. Core Requirement #8: Water Quality....................................................................4 I. Special Requirement #1: Other Adopted Area -Specific Requirements .................4 J. Special Requirement #2: Flood Hazard Delineation..............................................4 K. Special Requirement #3: Flood Protection Facilities.............................................4 L. Special Requirement #4: Source Controls............................................................5 M. Special Requirement #5: Oil Control.....................................................................5 Ill.. OFF -SITE ANALYSIS...............................................................................................5 IV. FLOW CONTROL & WATER QUALITY FACILITY ANALYSIS & DESIGN .............8 PartA. Existing Conditions...........................................................................................8 Part B. Developed Conditions...............................................................................I......8 D Part C. Performance Standards.................................................................................1 a PartD. Flow Control System....................................................................I.................1 V. CONVEYANCE SYSTEM ANALYSIS and DESIGN..............................................13 VI. SPECIAL REPORTS and STUDIES.....................................................................13 VII. OTHER PERMITS...................................................................................................13 VIII.TESC ANALYSIS AND DESIGN............................................................................13 IX. BOND QUANTITIES...........................................................................................13 X. OPERATIONS & MAINTENANCE MANUAL.........................................................13 LIST OF FIGURES FIGURE 1 VICINITY MAP FIGURE 2 SOIL SURVEY FIGURE 3 DOWNSTREAM MAP FIGURE 4 SENSITIVE AREAS FIGURE 5 EXISTING CONDTIONS MAP FIGURE 6 DEVELOPED CONDITIONS MAP I. PROJECT OVERVIEW The site is approximately 0.34-acre in size and is located at 29215 Military Road S, Federal Way, WA 98003, in the City of Federal Way (see Vicinity Map: Figure 1). No critical areas have been identified on or adjacent to this site. The current site contains an existing SFR with gravel driveway and landscaping. Based on the site survey runoff from the existing site drains to the east with all site surface runoff draining into the existing road -side conveyance system along the west side of Military Road S. The existing conveyance system drains to the south for approximately 400 feet before turning east beneath Military Road and discharging to a broad drainage area. This drainage area flows to the east through what is mapped as a wetland area for approximately 500-feet before combining with a more well defined drainage channel identified as a stream on the City of Federal Way critical areas map. This channel flows north and northeast along the west side of a mobile home park. The channel then turns east and into the park before leaving that property and entering the 1-5 R.O.W. This Technical Information Report (TIR) is submitted in support a City of Federal Way Building Permit for the proposed townhomes and driveway access. A Critical Areas Mitigation Plan will not be necessary since no on -site critical areas were found on this. The proposed access and townhomes have been located and sized to minimize the impacts to the existing and surrounding parcels. (See site civil engineering plans prepared by Omega Engineering, Inc.). Project Site Data: Total Site Area: Address: 0.34 Acres 29215 Military Road S., Federal Way, WA 98003 Parcel Number: 0421049128 Zoning: RM 1800 Community Plan Federal Way Water District: Lakehaven Utility District Sewer District: Lakehaven Utility District Fire District: South King Fire & Rescue Existing Adjacent Development: Existing development adjacent to the site includes the following: North — Single Family Residence South — Apartments East - Road R.O.W./Single family residence West — Apartments Determination of Drainage Review Specific to Project: Figure 1.1.2.A of the 2009 King County Surface Water Design Manual (SWDM) was used to determine the required drainage review for this project (See attached figure). Using the referenced flow chart this project is able to answer yes to the conditions within the first box in the upper left-hand corner of the sheet. o This project results in >2,000 sf of new and/or replaced impervious surfaces. o This project results in <10,000 sf of total impervious surface added since 2001. (Total project impervious surfaces = 9,840 sf). With 6,931 sf of existing impervious surfaces this project proposes a total of 2,909 sf of new impervious surfaces and <35,000 sf of pervious surfaces. Therefore, based on the flow chart at a minimum Full Drainage Review is required. Following on to Table 1.1.2.A (see attached) of the SWDM, Full Drainage Review requires the project to meet Core Requirements 1-8 & Special Requirements 1-5. 2 1.1.2 DRAINAGE REVIEW TYPES AND REQUIREMENTS FIGURE 1.L2.A FLOWCHART FOR DETERMINING TYPE OF DRAINAGE REVIEW REQUIRED Is the project a single family residential or agricultural project that results in a2,000 sf of new andlor replaced impervious surface or 27,000 sf of land disturbing activity, AND meets one of the following criteria? • The project results in s10,000 sf of total impervious surface added since 1/8/01, s5,000 sf of new impery surface, and 535,000 sf of new pervious surface (for RA, F, or A sites, new pervious surface is _c52,500 sf or remainder of site if z65% is preserved in native vegetation), OR • The project results in s1 o,000 sf of total impervious surface added since Yes 1/8/01 and new pervious surface is _<35,000 — 3.25 x new impervious surface (for sites �!22,000 sf, use 2.25, and for RA, F, or A.sites, increase by 50% or use remainder of site if >_i35% is preserved in native vegetation), OR • The project results in .,0% total impery surface and <_15% new pervious surface on a single parcel site zoned RA or F, or a singlelmultiple parcel site zoned A, and all impervious area on the site, except 10,000 sf of it, will be set back from natural location of site discharge at least 100 ft per 10,000 sf of total impervious surface? No Does the project result in z2,000 sf of new and/or replaced impervious surface or>_7,000 sf of new pervious surface, OR is the project a redevelopment project on a parcel or combination of parcels in which new No plus replaced impervious surface totals >_5,000 sf and whose valuation of proposed improvements (excluding required mitigation and frontage improvements) is >50% of the assessed value of existing improvements? Yes SMAI.1- PROJECR"W URA I NA . IZE'V€E Section 1.1.2.1, rVots; eprvyeGtmay fsvbe subject Targeted rainage RevibW as. eterrr+i .ed be.'law. Does the project have the characteristics of one or more of the following c ories of projects (see more detailed threshold language o 15}? 1. Projec ntainIng or adjacent to a flood, erosion, or ep slope hazard area; • cts within a Critical Drainage a or Landslide Hazard Drainage Ars , r projects that propo z7,000 sf (1 ac if project is in Small Project ge Reviavg of land disturbing activity. 2. Projects proposing to const ormodi rainage pipe/ditch that is 12" or larger or rec ' s runoff from a 12" or far ra€nage pipe/ditch. 3. Re opment projects proposing Z$100,000 in Improvem s to an existing high -use site. Kin Yes required 1.1.1 (p. Is the project an Urban Planned Development (UPD), OR does it result in >_50 acres of new impervious surface No within a subbasin or multiple subbasins that are hydraulically connected, OR does it have a project site>_50 acres within a critical aquifer recharge area? Yes- r,ULL DRAINAGE REVIEW Section 1.1.2.3 PROTECT .2.4 . 2009 Surface Water Design Manual 141 1/9/2009 SECTION 1.1 DRAINAGE REVIEW TABI,E 1.1.2.A If EQUIREMENTS APPIARD UNDER EACH DRAIN AGE REVIEW 1'YPF. Small Project Targeted Full Large Project Drainage Drainage Drainage Drainage Review Review Review Review Single family Projects that are not subject to Full or All projects that UPDs. OR residential Large Project Drainage Review, AND result in >_2,000 projects that projects and have characteristics of one or more of sf of new and/or result in >_50 agricultural the following categories of projects: replaced acres of new projects that 1. Projects containing or adjacent to a impervious impervious result in >_2,000 flood, erosion, or steep slope surface or within a sub- sf of newand/or hazard area; projects within a >_7,000 sf of basin or mul- replaced Critical Drainage Area or Landslide land disturbing tiple subba- impervious Hazard Drainage Area; or projects activity but are sins that are surface or proposing 2:7,000 sf of land not subject to hydraulically >_7,000 sf of disturbing activity (1 ac if in Small Small Project connected, land Project Drainage Review). Drainage OR project disturbing 2. Projects that construct or modify a Review, OR sites>_50 activity but do drainage pipe/ditch that is 12" or redevelopment acres within a not exceed the larger or receive runoff from a 12" or projects meet- critical aqui- total impervious larger drainage p[pe/ditch. ing drainage fer recharge surface and 3. Redevelopment projects with review threshold area. new pervious ?$100,000 in improvements to a #7 in Section surface thres- high -use site() 1.1.1 (p. 1-9). holds specified in Sec. 1.1.2.1 Category Category Category t1).1-13). 1 1 2 3 SMALL PROJECT DRAINAGE REQUIREMENTS CORE REQUIREMENT #1 -F Discharge at Natural Location CORE REQUIREMENT #2 (2) .% 3) ✓(3} Analysis 4(3)Offsite CORE REQUIREMENT #3 (2) ✓(3) Flow Control CORE REQUIREMENT #4 (2) Conveyance System. 4 CORE REQUIREMENT #5 Erosion & Sediment Control CORE REQUIREMENT #6 (2) �I Maintenance & Operations CORE REQUIREMENT #7 *(2) (3) (3) ✓(3) (3) Financial Guarantees & Liability CORE REQUIREMENT #8 Water *(2) ✓(3) [s1 Quality SPECIAL REQUIREMENT #1 (3] �(3] ►r Other Adopted Requirements SPECIAL REQUIREMENT #2 Flood Hazard Area Delineation SPECIAL REQUIREMENT #3 ✓(3) 3Y Flood Protection Facilities SPECIAL REQUIREMENT #4 3) ✓(3) (3} Source Control SPECIAL REQUIREMENT#5) _/(3) ✓(3) Oil Control " (1) Category 3 projects installing oil contr is that construct or modify a 12-inch pipe/ditch are also Category 2 proje s. (2) May be applied by DDES based on project or site -specific conditions. (3) These requirements have exemptions or thresholds that may preclude or limit their application to a specific project. 1/9/2009 2009 Surface Water Design Manual 1-12 vr OMEGA ENGINEERINGy INC. DINH 2829 Rockefeller Ave. I DATE L�0verett WA 98201 {jl ]425.i87.3820 [f} 425.259.1958 5-11-2015 FIG. 1 VICINITY MAP TUYEN TOWNHOMES JOB N0, SCALE SHEET 13-0206 1 -1" = 500' 1 1 OF CONDITIONS AND REQUIREMENTS SUMMARY A. Core Requirement #1: Discharge at the Natural Location The proposed on -site conditions will emulate those of the existing site conditions. The developed site runoff from the access driveway and roof areas will be collected, managed and released to the drainage system within the Military Road S. R.O.W. No significant or adverse drainage related impact to down -gradient properties is anticipated or expected to result from the proposed project. B. Core Requirement #2: Off -site Analysis See Section II. C. Core Requirement #3: Flow Control See Section IV. D. Core Requirement #4: Conveyance System The peak 100-year flow rate for the developed project is 0.132 cfs, the proposed 12" diameter CPEP pipes with a 0.5% slope have a conveyance capacity of 2.7 cfs which far exceeds the required rate. Refer to Section V for additional detail E. Core Requirement #5: Temporary Erosion and Sediment Control Plan An erosion and sediment control plan, which will serve to minimize soil erosion/sedimentation during the proposed site construction, has been prepared for approval by the City. Refer to Section Vill for additional detail. F. Core Requirement #6: Maintenance & Operation The on -site stormwater system will be privately owned and maintained by the property owner or HOA. G. Core Requirement #7: Financial Guarantees & Liability Financial Guarantee & Liability commitments, if any, between the property developer and the City will be established at the time of permit issuance. H. Core Requirement #8: Water Quality See Section IV. I. Special Requirement #1: Other Adopted Area -Specific Requirements No area specific requirements apply to the drainage design for this project. J. Special Requirement #2: Flood Hazard Delineation This project is not located within a flood hazard area K. Special Requirement #3: Flood Protection Facilities None required for this project. 4 L. Special Requirement #4: Source Controls The project scope of work is the clearing, and construction of a small townhome complex, driveway/access and frontage improvements. Source controls for the proposed project are not warranted. M. Special Requirement #5: Oil Control Not required for this project, see item L above. OFF -SITE ANALYSIS Adopted Basin Plan: The project site is located within the Duwamish-Green River Drainage Basin. Downstream Analysis: A Level One Off -Site Analysis was performed on March 23, 2013. The weather was overcast and the temperature was approximately 50 degrees. Please see the downstream map that follows. Existing Conditions & Downstream Drainage System: A visual site inspection was performed of the drainage system downstream of the subject property utilizing site specific survey mapping and on-line records obtained from the County's IMAP website. Due to heavy vegetation and right -of -entry constraints the entire downstream drainage system was not accessed. The property is characterized with existing impervious surfaces and landscaping. All of the site runoff leaves over the eastern property and is collected by the drainage system within the Military Road S. R.O.W. No runoff was observed within the drainage ditch in the R.O.W. at the time of the site visit. Based on visual observations, no signs of significant drainage related problems were observed during the downstream reconnaissance. See Figure 3: Downstream Path Map for a graphical depiction of the following descriptions. The downstream vegetation consists of landscaping/grasses, road side ditches and pipe conveyance system. Drainage leaving the subject property does so as sheet flow over the eastern property line and is collected by the roadside ditch and conveyance system along the west side of Military Road S. The conveyance system drains to the south for approximately 400-feet before turning east and discharging to a broad area that continues to the east. The runoff then enters a more well defined drainage channel along the west side of the trailer park which flows to the north and then east through the park before entering the 1-5 R.O.W. This point is more than a % mile downstream from this project. Problem Description: The downstream system is composed of open channels and pipes. At no point during the site reconnaissance was any significant signs of soil erosion, bank sloughing, or other drainage related problems observed. Downstream Drainage Complaints: Paul Heller with the City of Federal Way was contacted to obtain any available downstream drainage complaints for this project, and he responded 5 stating that there were no complaints on -file downstream from this project. King County Sensitive Area Maps: A review of King County Sensitive Area Maps indicates that sensitive areas do not exist within one -quarter mile downstream of the site. Please refer to the Figure 5: Sensitive Areas map that follows this section. A summary of the sensitive area review is as follows: Streams: Unnamed stream mapped within the one quarter mile area 100 Yr. Floodplain: None mapped within the one quarter mile area Wetlands: Offsite wetland mapped within the one quarter mile area Erosion: None mapped onsite or within the one quarter mile area Landslide: None mapped onsite or within the one quarter mile area Seismic: None mapped onsite or within the one quarter mile area. Coal: None mapped onsite or within the one quarter mile area Soil Survey.- Based on the Soil Survey the on -site soils in the area of disturbance are mapped as Alderwood gravelly sandy loam with slopes of 6-15% (See Figure 2). Alderwood series are -moderately well drained; runoff potential is slow, and a moderate erosion. hazard. Conclusion: There are no downstream drainage complaints documented with the City of Federal Way within the actual Y2 mile -downstream flow path for this project, and no -obvious drainage problems observed during a field inspection of the downstream drainage way. The downstream system appears to have adequate capacity to handle the developed flow of the proposed project. The changes proposed for the existing site should not have any noticeable or significant adverse impacts on the downstream system. A At I 4_U'6"UJ_'J L4 nw Fl— t qp, 33 _-.y.�,a -'_ /';. $ is .• t .. o„ �' r -"�-•• { �}�3ra- •-¢;.. .:r>-.'.a � i rr�':aL; 't+s,_� �51+...� ;-� � sy d. �If '�.w' lka�� ' Yi.' •7''�'t •,�^ - .ef • �'�' .� • , i_vaGSt+.-[9.` � ' . i f• � �• 8C• t � E 11�r-W�.+ - _�, ! ! 4 y, � k Y ..y0,Y '.,fkn r y r +n.}q • „ .x 7 ll�• ` i 'y �1 p� = J.F•� .!"y i:; 'rtYil i'��•y \%� { � :_i•�'{-`i�A•'. 1'I� j'.f'� µSG �•� �'S-.:. �a't-m -w..rwr-.-s:L�,-. R E�i-- �+r:� rI,; ,ryy _� .. ��'�' �'�.�lf - �srl: �hw ,{ }1. r-�,;:w�y44,r •]•r YY �`a FFF [.:i,.• ..�r�r� „k,,.. S.., � ��.•L.raat7'!Y�,f�.�r•'�- '� y I 'f�- ..�¢%�Ff, Y rd•1 •r ,� � y=.i• .�« ,; .+a,' '� �,3. f �Y,.��� - ..r� � [�4 ' � -� y ,� [, T' SR ? i� ��-�"-�k�,.a� .� � .X '�' �.�-• ��•„� ter$ 3 pn� . . i yL,SBE� � ���•.� ..}} rr i� '1 �v'{��Sm' : Y' • igx r .I..� d., j Y�. - 8 _ . �i.5 =_ P. �1�� ,. �.l��. �I. �.... y�-,��i �, N _� F � � . f� �:r '� S I � ' Y r 1 t ^:iF�''� � _ 't•� %'lr'.i•+•r. �'t'' I{I� ` � 1 • i : • . �-'z.. T �'. ,{ S f • � � k � ' +� .,f;1�.. � .[ �E�•.�y� �! :�. �' �'���"n:-� �.�,., i ,�' 7:• s�fhhhy777 i� _. t •}4k r_�a:..,: yE•-� A' ^�•ti•''r� [� s"'r'-,]�, g ����`E ,�. ^"ri-,"i-.. ��fti��# , � y��.�'.''+ •ti Gv- i �h• L �`�._�ry � .:?��] 1�• �,�•i r n� � ��• ., `'-'��4•r. �/..�� aT� 7� .yak rr�i_ - r, r..y �� 3: :�►rsres.�::, {'?�+1.. ',` 9[�: ..i�:t'-- nz x�.'� �+�y� i hF =i"k'� e� T�-•Y'F ...- ! co• 'au!(Yx-rl� i'• , S F ez•# k's - r.:_ .. '� 5��].� M1 �^r'^.•:Eti � `,f f�!-,�' .5 ,� � - .E wal �,} � ��". _ IS • , �- �E.�.'...��i ' +-�. -'" - �""'� � ' � fir- 'P [,� ,_..,:� J , '� ��r ] - led r �dA�r E ���`�•�-'. - f._��1 Ir T�, , xY-!E :e' _ _ -•ram .i.. E"` f �s„��es .-e- �: =:r1...[�;- ,.. ss4N - " L- •' yy'} ''y,'•'•''' .r,•;r �:.F ?.. �,,V.F �'j y-r---'�'^T TI •�;- w_rNy "-- •yG - ...-�:--�M1". .�.__�+ +ij� -r •}-• L - 1h��1,•� 31: - �✓.�r"f-%..r'•'' =R �N.-�Jfn^y Y ,;} S �31; - �'rc .. r ..I ti • : ._ R - r..^f�� _ ']1x.= � � .. '- •.F_,i�•• _ •- is ,�+-.fy11i_R.h ly 'If�=+•i�",y tiG-4'. �f - • , J _ �.�-_ _rd •.^ r ;'?S. _ + T�-` • ea;:a�yyv � --�� 1 .C," '---.may-,-.:�,.b "--;s' �� w..' .. R lam,' a� �;b v. �••-. F. "P. •7WI� ` - 'd,�•;-F'x'" .ti+ �•.. -. 7' .�'�r ^f - _ _ •+�...�. -. : = : . `-�.:,.-�.a..s_..�. i i lr�ps.'1.�', S m �• y=..If3 � ��,;,Y�--} 9,^�`=,ri4`3.i.;;T � � �!� ��.�-r�,�• +'; e: '-�� r'i .:r.13 r': y.�R- `�'^•�aayr�.i.,�g�k•�„d2 �;..• .�. '�•s;.y �1.� ^t_+-�'b• Kt� �A-- 1�,( 'L , a +yii� r' • ! •...+gal Y. � .1i _- f' 1 _� �,S �y�:;r Y; - "�•; �'-.� .�:.}� �'� J' Orr #{� . �' � s':�vil : � �. 1- ;l"'.r>a' 4 r� .><'wir . 's:., ;,.,,,M� �;,, ^ �, � �` �'•" � ' Y �`� �r � ., _ - sue"• �' `i ���, i{ 5-/• �[��' r ' 7t'• 1 i• k� }' _ . S { awn + .. ,xz ,ya �, • �--•� �' `'1 '^' iy }` 3�T1'SV� �? • �� �[� Sven + F'- � . � i } . � Y• ..}YT' - 'A1q� ]� � x; �« Y +:!- ti -cf�, •.:w • 4 i ��`��'^'�'�'�r } Y . �•^ x� C�':_'1 / .�ve.�""'" . Y • � ,�y- Y 7�s f::a �`�gry}'�.r . . � � 1�� �--[^y '+ r�,1� r �� ?5,�� � , 4,/ ( � I _� 1 j''r• 1 T•"� ,fi' �S 'ip � "-YA r� d 9 � �� �� i+ ° ' '. ryt�`�ti'�s,.�r��`i`'+. �, • � �tX S � r r � k x L • �Y.f "�,C ••-� y i - i��. '��b.-. "�• � �,i� y 4 '.'� �J' ..,�1� "Y; µ,d'+ � '.�?�� �L L1+•';-�`. b"saaa."n^^,`':TrMS�-,¢ - ,rn� -�_ iw '�-'y+•��.+�"ri _ ..{� aR• YY r.., y. Y "' :.k� '�'.r�+i � �--,E` _ ."'' •• "*.T_+d i. -r �`� • �,- r .,F - Fs,Y"� ,w.- � Y •y`�: 3'.. �.. 1 :� - 'r�"''s) � _ ., l I � T FF''�'. }�'P . ��r• is • Ems, 1 � 1,. _. 3+.•yi:.z:;*y' ^��' .%� - -a1 ` �.�-• >� �? �� _`�" �d': 1 aF' ' 1 ..'•�..x� i„• •,;e, :� �s_ � erne ! "fib � • _ G _�3w."'' �. f j•Li, ��'�� �'�l;��i [ •� - �i. sa+r"'w ..:,_�'� - ,. �.-- ��..,,R,r...: �TS' .Ba�. _._�>� .r •�1 � • .�.. -- ` �,�i5•.. _ r. ? , yr, •���. sue' � .� �' S "' y. � >_ : v •i, ..,Z. 404 IL WW a}_� c'• +� •� � f _ 3�y'w'�:':' :�Ijv` ,a .'i°` �"r 1� =�'� E . 2 .1� ~; �� ,j!� .viAT ` P-' w,,,¢•„ry.yrr..."_ •.•+,.,r -, ,I,• .T 3 ,.�, .i. .,Q{q •• '.ma's- .. .,�:�"'[�•,�' - -.. � 9•.*. +• uF I - :: :.: +�• [ � ��I,r .3r��.-ie.• - �•.._�":'�_ .. _ vr% .��iy-":aT _ '`ii�(f1 .. S 5�1�� 3 y.- * - . rr11}; :: •�riry .•�V - , Y'�-�v+.,-E.« 1• •.T]r i' � 'fir: ^ '1,1,'u."L;r. • a. l•�.� % 1144�� �, .1 fs %=,5-. `�� ��µi� ., +�'y}v: ` •�•�;; •�r.1.S --.rb r=.-• fsr''Y• �:�•4 Y-►s , �r a . � ',y • .�t.e ti>'' k•, '� `f.�??�.r'_�.�- •.ice y' J' `" z. •'M •� !'.F- ,�� J {44 , *i.- � _ •y•r��. `•P' r. • a,: ,_�". o +�i �••�Y6-z ;•:..,,• • s • i8�_ _ •j.xr+. y�:� � '.+Y_s•tl" :x,'•.:t�..• hy•- { � '�F�:.:. i..,i-',✓^`�1' 1�ti4� 1 :`�-rbfi,.:f �r-�b, ;��• bra' ,}�?I"�'' �p{4e . �rl.' �' r. ` 4•,•}� _� r.. f$��-+[. M1 �• J7r't 'r1h ' [ r - '}` � '.L.'a�.r �.+?`4y� i F lt�.�r' ` ¢V�"' *.n-�4 r �) � ,.1 A,�� .�'_4. rx � •� y 13�Jt' ` � �. �'Y `•{ - i � � � t:i .: '1y4,. r.• rti .>', r• rla. jd" y+,k� i• x• e� f� '�,ti�?-: •• �+�;: •� •r- :� • iii • a�.. f :�.�.•� .- �q-Y ,¢,;-.`.�•,•• t'r�•:.. "��i � 3�':r :-•• fe'rr �.�'" ''f ,, �,''' - �.. � . r' "ar:.° � r ,; 4" i>_= �°p'�`� �.rFr• `ryr'y rl" �la,�� -�e E S•4'• .�rK� •,� -'�• �k •[' )1• •;e _ .�,�_ � � _ � �� �=,'zti` �! :rr 'ems:" •� _w x `, - L d.._ [ _. i��'un:.x•�C i S■ .,.,�"s'43 '�r• ��,• _• n �y',_a'r� •'r.�s"� :; �r•,' ' � r 'Y�?'7^ G ` K'^'etc.- ' i�•, 1 �y��t; °n�`'"r��: �,X {� '' ; G�'�q � � 4 ��S • i'�5�� . n � ri'r+.�:-::�"...; �•! �� ' ? i�' : / �• �• , ��, ' }� � ep. 9 ��11ff Y �� .!i Q�i{� 'i.�.4'`= �r'fr'i;;'t adp a{1y�rr• • 1 :{. ��%. r� � -'•�1 uy �H:i fs'�`-k�_ r'9y�.: '. cf-a+�.::�,. �`,� �.� .i ,� '��:; r: '' ')r'+i. r-, • �` � C��' ,, `�-, .. sir Y� i'c� �����••• { .�.��.�� �� 35�'-��lir_ i. � .x G�.i - r�y: •?: •-, ��� � 57, .;? z `'.w•;1tr� �: TY:;•R.7 i- .. • a� - i• . i }A�:,y^, �r3isi• r y +~ a � ,.� . �,__ 1 � ' �hp'�+. � a. as --� ', E: y» ;,,,� :.id;�F,`�•'ti",. f?Y 1;7?'j.:;,Y s .! •y�- Jaj.�.r '. „'r k•R '_� '}�.o•� � fr- ` ��1y �+'l �k�.Wj2 i.r�1 ( ,,�.'� `S" }.'n �+Jll�r' •y'.��"J'..-.,, .•--, @�j• , +yry'r:�T,•���'� : y,�'.,1..,. - �'�i�-,d�+'�c ar�'•+c�'+•'l'-4;j�,'R�•�s.:y'ir-S}�i.., .. d � � .:� c;��2�r~• ?,�• . a.,.:. IV. FLOW CONTROL & WATER QUALITY FACILITY ANALYSIS & DESIGN Part A. Existing Conditions The property contains landscaping and existing impervious surfaces. The site topography is moderate (5 to 15%). Natural runoff appears to discharge as sheet flow over the eastern property line (see Figure 5: Existing Conditions Map). Permitting the project requires the site to meet the conservation flow control standards which require the existing site to be modeled as forested and the developed flow durations to match the 2-year through the 50-year event. The area to be developed is limited to the existing parcel plus a small portion of the existing R.O.W. as shown on the engineering plans prepared by Omega Engineering, Inc. and submitted with this TIR. This area is 0.34 acres. Disturbed areas outside the approved area will be restored to pre-existing/native condition per the submitted drainage/soil management plan. KCRTS Hydrologic Parameters Soil Type = Till Rain Region = Seattle Scale Factor = 1.0 Ex. On -Site Basin Area = 0.34 acre (modeled as preforested) Total Property Area Total Developed Area Flow Frequency Analysis Time Series File:fed-ex.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.021 0.005 0.015 0.000 0.009 0.016 0.013 0.027 Computed Peaks 14,800 sf = 0.34 ac _ = 0.34 ac 2 2/09/01 18:00 7 1/06/02 3:00 4 2/28/03 3:00 8 3/24/04 19:00 6 1/05/05 8:00 3 1/18/06 20:00 5- 11/24/06 4:00 1 1/09/08 9:00 Part B. Developed Conditions -Flow Frequency Analysis------- - - Peaks - - Rank Return Prob (CFS) Period 0.027 1 100.00 0.990 0.021 2 25.00 0.960 0.016 3 10.00 0.900 0.015 4 5.00 0.800 0.013 5 3.00 0.667 0.009 6 2.00 0.500 0.005 7 1.30 0.231 0.000 8 1.10 0.091 0.025 50.00 0.980 The project consists of constructing a townhouse complex, paved driveway/access and the necessary flow control BMP's to mitigate for the development activity on the property. The remaining pervious surfaces will be landscaped with grasses and planter beds. W Proposed Impervious Area Driveway/Parking/Vllalks = T104 sf Roof = 2,736 sf Total = 9,840 sf 0.226 ac However, as allowed in the Exceptions section of the 2009 drainage manual Section 1.2.3.1, Section B, (exception #2) The facility requirement in Conservation Flow Control Areas is waived for any threshold discharge area in which there is no more than a 0.1-cfs difference in the sum of developed 100-year peak flows for those target surfaces subject to this requirement and the sum of historic site conditions 100- year peals flows for the same surface areas. Note: far the purposes of this calculation, target surfaces served by flow control BMPs per Appendix C may be modeled in accordance with the flow control BMP facility sizing credits in Table 1.2.3.0 (p. 1-47). The current, design shows the south half of the proposed roofs to be dispersed using splash blocks with a minimum vegetated flow path of 50-feet prior to being collected or combining with another flow path. In addition, 430 sf of the parking stalls will be dispersed as sheet flow along the east side of the parking area with a 25-foot vegetated flow path prior to being collected. Per Table 1.2.3.0 these surfaces meeting the basic dispersion criteria can be modeled as 50% impervious and 50% grass. Therefore the proposed impervious surfaces for this project have been adjusted from those shown above as follows: Proposed Impervious Area Driveway/Parking/Walks Dispersed parking Roof Dispersed Roof Total 6,674 sf = 430 sf * 50% = 215 sf = 1,368 sf = 1,368 sf * 50% = 684 sf = 8,941 sf 0.205 ac Pervious Area - 0.340 ac - 0.205 ac = 0.135 ac Flow Frequency Analysis Time Series File:dev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.062 6 2/09/01 2:00 0.125 1 100.00 0.990 0.050 8 1/05/02 16:00 0.078 2 25.00 0.960 0.074 3 2/27/03 7:00 0.074 3• 10.00 0.900 0.053 7 8/26/04 '2:00 0.065 4 5.00 0.800 0.064 5 10/28/04 16:00 0.064 5 3.00 0.667 0.065 4 1/18/06 16:00 0.062' 6 2.00 0.500 0.078 2 10/26/06 0:00 0.053 7 1.30 0.231 0.125 1 1/09/08 6:00 0.050 8 1.10 0.091 Computed Peaks 0.109 50.00 0.980 0 Based on the KCRTS analysis, the difference between predeveloped and developed conditions is 0.125 — 0.027 = 0.098. Therefore this project is exempted from flow control per Section 1.2.3.1, Section B, (exception #2) of the 2009 Stormwater Manual. Part C. Performance Standards The performance standard for project is based on the 2009 King Couhty Surface Water Design Manual (KCSWDM). Given the property is 0.34 acres and the downstream system is characterized by ditch, pipe and stream channel features, therefore on -site stormwater management BMPs are the preferred and selected flow control BMP. Part D. Flow Control System Exempted as shown in Part B above. 10 kk i3 5aM. Cl p Lid FIG. 6 OMEC3A DEVELOPED BASIN MAP ENGINEERING, INC. D I N H TU YEN TO WN H OM ES eEvereft 2829 Rockefeller Ave. DATE JOB NO. SCALE SHEET WA 98201 (o)425387.3820 (f) 425.259.1958 5/11 /2015 13-0206 1" = 40` 1 OF 1 V. CONVEYANCE SYSTEM ANALYSIS and DESIGN This project proposes to use 12" CPEP pipes to convey collected runoff to the proposed detention vault grid to the drainage system within Military Road. Since the peak flow for the 100-year event for all of the new impervious and converted pervious surfaces totals 0.125 cfs the pipe system has more than adequate capacity since a 12" pipe with 0.5% slope or steeper can convey 2.7 cfs which is far more than the 100-year peak flow for the entire site. VI. SPECIAL REPORTS and STUDIES None VII. OTHER PERMITS Building Permit from Federal Way VIII. TESC ANALYSIS AND DESIGN Several standard Best Management Practices (BMP's) will be utilized by the contractor to minimize the amount of erosion and sedimentation that may be perpetuated by the construction of the site. Some of the measures will include: Rock construction entrance will be constructed at the connection to the existing gravel drive to access the project site. Filter fabric fencing will be constructed along the downslope area adjacent to the cleared portions of the property. The silt fence perimeter protection has been laid -out and designed to meet the criteria outlined in KCSWDM, Appendix D D.4.3. Retention of vegetation around site. Areas to downslope to the west of the improvements will be left undisturbed on this site to provide additional filtration of runoff. Therefore, the silt fence in conjunction with the retained natural vegetated areas will be effective at trapping sediment and protecting the downstream system. IX. BOND QUANTITIES The project consists of clearing and the performance of minimal site grading within the approved clearing limits. A Bond Quantity Worksheet is not applicable to the project at this time. X. OPERATIONS & MAINTENANCE MANUAL The on -site stormwater control system will be privately owned and maintained by the property owner or HOW. 13 TO>^iFtWSE UNIT Tctt+om UNIT TOYNHOUSE UNIT PUBLIC ORN SPACE TOhiili0fW UNIT TOP#+OJSE UNIT EAST ELEVATION SOUTH ELEVATION 1/8' - V -0• E 8 m > m m r a Q N N 03�� U N N N m YI N N W 0 a) E 0 C 3 0 H 0 U� (D o >% } � 0 �3 J W Z N 0 yyy Q .�.. N U. Drawing: MB 12c-3264