22-101418City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 83-1 2607 Fax (253) 835-2609
Project Name: BEZOS ACADEMY
Project Address: 3600 S 344TH WAY
_ Building - Commercial
* : Permit #:22-101418-00-CO
Inspection Request Line. (253) 835-3050
Parcel Number: 726120 0221
Project Description: BLUEBEAM - Level 2 alteration which includes reconfiguration of spaces, addition or
elimination of doors and windows, reconfiguration or extension of systems, and/or installation
of additional equipment
Owner
Applicant
Contractor
Lender
FEDERAL WAY PUBLIC SCHOOLS
SAGE KIMBASSETTI
FORMA CONSTRUCTION
OWNER IS LENDER
33330 8TH AVE S
ARCHITECTS
1016 1ST AVE S SUITE 400
FEDERAL WAY WA 98003
71 COLUMBIA ST SUITE 500
SEATTLE WA 98134
SEATTLE WA 98104
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occu anc Class:
E
Construction Type:
Type II - B
Occupancy Load:
Floor Area (sq. ft.)
5,935.00
Additional Permit Information
Occupancy #1 - Area (Sq. Feet) ..............................
5935
Mechanical to be Included? .....................................
Yes
Mechanical Work Valuation? ................... :..............
59536
Is this an Online or O.T.C. application? ..................
No
Plumbing to be Included? ........................................
Yes
Comprehensive Plan Designation ...........................
Office Park
Total Valuation: 750,000.00
Occupancy #I -Construction Type ......................... Type II - B
Plumbing Work Valuation? ..................................... 88375
Number of Stories ......................................... I......... 2
Permit for Building Shell Only? ............................. No
Occupancy #I -Use ................................................ Child Care Facility
Zoning Designation ................................................. OP-3
Mechanical Fixtures
Ducting 1
Plumbing Fixtures
Drains 1 Laundry Washer Outlets
Sinks 1 Water Closets
CONDITIONS:
1 Lavatories 1
1
Fire conditions:
Door exiting shall be tied in with fire alarm system. Doors shall allow free exit on alarm.
A separate permit is required for the sprinkler and fire alarm modification.
PERMIT EXPIRES Tuesday, 3 January, 2023
Permit Issued on Thursday, July 7, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
r„Y THIS CARD IS TO REMAIN ON -SITE
Federal Way Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 101418 00
Project: FEDERAL WAY PUBLIC SCHOOLS Address: FEDE 344TH WAY
Scheduled insnectinnQ , ,,1 o r :,_, r., . RAL WAY WA 98003
(read left to right,- _. bottom).
""„" ,r urns cars is not on -site. 00 OLOgf 1 lilg CARD. Inspections are listed as close to sequential order as possible
top n bottom i Please schedule inspections as Work must not be covered until it is approved. Check with your inspector if
You are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ Site Assessment (Erosion) (4365) 0 IF, Otin
To be done PRIOR to breaking ground d to place
con rate ❑ Re -steel (4215)
Approved to. place concrete Approved to place concrete or grout
By Date By Date
� By Date
El Plumbing Groundwork (4190) Date
Floor {4255) & Approved to cover ❑ Underfloor Framing (4285)
Approved to place concrete
By Date 7 24— By Q�� Date-? Iq Approved to sheath floor
I
By Date
0 Floor Sheathing (4105)
Approved to install flooring ❑ 8
Rough Plumbing (4230) ® Mechanical Rough -in (4165)
Approved
By Date Approved
i o By Date By Date Gas Piping (4125)
❑ Approved to release test Fire/Draft Stops (4095) 72 Interim Erosion Control (4370)
Approved
By Date Approved
BY Date BY
Date
Prior 10 Scheduling a Framing inspeetion; 93
Electrical. Plumbing & Mechanical Rough -in Framing (4120) 1q
and FiWDraA Sto ins ❑ Insulation 4150
p pections must be signed- Approved to insulate ( )
ofr and approved. 113C 109-3 4 Approved to install wallboard
By L Date g 1 2� BY
Date
15 Gypsum Wallboard Nailing1&
( 4130 ) ❑ Suspended Ceiling Grid (4265) 97
Approved to install mud & tape ❑ Approved to drop the Final - S K F & R (4060)
By CJ' Date C! /f � Approved
j !/ By Date 7 U, By Date
is Final - Planning EA Final Erosion Control (4375) 2� Approved Final - Mechanical (4065)
Approved
By Date Approved
By Date By Date
Approved c�
21 Final - Plumbing (4075) 22
❑ Final -Building (4050)
Approved
By Date °rf �By Li Date
❑ Rough Electrical ❑
Approved Final Electrical Approved El Right of Way
By Date Approved
By Date By Date