22-103374City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Building - Commercial
Permit 9:22-103374-00-CO
Inspection Request Line: (253) 835-3050
Project Name: EDWARD JONES
Project Address: 33400 9TH AVE S Parcel Number: 926501 0060
Project Description: BLUEBEAM - Tenant improvements including partition wall and modifications to ceiling. No
plumbing or mechanical.
Owner
Applicant
Contractor
Lender
RH GOLDEN STONE KBH LLC
KIRK FIGENSHOWLINN-
LINN-DOUGLAS CONSTRUCTION
OWNER IS LENDER
PO BOX 5003
DOUGLAS CONSTRUCTION LLC
LLC
PO BOX 8019
PO BOX 8019
BELLEVUE WA 98003
COVINGTON WA 9803
COVINGTON WA 98042
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 0
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 2
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No
Plumbing to be Included? ........................................ No Comprehensive Plan Designation........................... Office Park
Zoning Designation ...... ............... .................. I......... OP
Total Valuation: 84,261.00
No Fixtures Associated With This Permit 1!
PERMIT EXPIRES Saturday, 4 February, 2023
Permit Issued on Monday, August 8, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
WashiaUEiMffof federal Way.
Owner or agent: Date:
At,
CITY OF
Federal WaY
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103374 00 Address: 33400 9TH AVE S Unit 114
Project: RH GOLDEN STONE KBH LLC
FEDERAL WAY WA 98003
ed
t. sequential order as
Scheduled inspections oop to bottom)led if this card is not on -site. Please schedule inspections as appropriaO NOT te. Wok musAno bRD-e cove covered unections til istapproved e Check with your inspector if
(read left to right, top )
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
2 Re -steel (717]r:a:b/rCo ncrete Floor (4255)
1❑ Footings/Setback (4110) ❑ ved to place concrete
Approved to place concrete Approved to place conc
By Date By
Date Date
® Underfloor Framing (4285)Floor Sheathing (4105) ring
s Fire/Draft Stops(4095)
Approved to sheath floor
Approved to install flooring Approved
By Date By
Date By Date
0
Framing (4120) Q Insulation (4150)
Prior to scheduling a Framing inspection; Approved to install wallboard
Electrical, Plumbing & Mechanical Rough -in Approved to insulate
and Fire/Draft Stop inspections must be signed -
off _ `� Date
and approved. IBC 109.3.4 By C Date BY
g (4130) �o Suspended Ceiling Grid (4265)
11 Final - S K F & R (4060)
9 Gypsum Wallboard Nailin
Approved to drop the Approved
Approved to install mud & tape
By ho Date ��� vL By Date By Date
12 Final - Planning 1 3 Final - Building (4050)
Approved Approved
By Date BY
Date ll
Final Electrical ❑ Right of Way
Electrical ❑ Approved Approved
Approved
g Date By Date
f-Rough
Date Y