22-103282City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Electrical
Permit #:22-103282-00-EL
Inspection Request Line: (253) 835-3050
Project Name: KIM/NOH
Project Address: 31140 30TH AVE SW Parcel Number: 167300 0080
Project Description: BLUEBEAM - 13.12 kW PV Solar Panel Installation on Roof
Owner
Applicant
Contractor
YUNCHONG KIM
BRS FIELD OPS LLC
B R S FIELD OPS LLC
31140 30TH AVE S
1403 N RESEARCH WAY
BRSFIFO820N3 (8/23/22)
FEDERAL WAY WA 98023-7844
OREM UT 84097
1403 N RESEARCH WAY
OREM UT 84097
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Alt. Serv./Feeder: 0 to 200 aml 1
Electrical Fixtures
CONDITIONS:
Fire conditions:
Please call 253-946-7318 at least 48 hours prior to requesting your electrical final so SKFR can conduct
their fire final first.
Call 253-946-7318 to schedule your inspection. Please schedule your inspection at least 2 business days in
advance. The hire marshals office will call you back and set up an agreed upon time. Preferred inspection
days are Tuesday throuizh Thursday with limited inspection availability on Mondav's and F riday's.
PERMIT EXPIRES Sunday, 29 January, 2023
Permit Issued on Tuesday, Aumust 2, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent:
�nId
Date:
A, THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 103282 00 Address: 31140 30TH AVE SW
Project: JESHO NO FEDERAL WAY WA 98023-7844
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q
UFER Ground (4295)
0
Ditch cover (4030)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
®
Temporary Power (4275)
®
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Q Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Ceiling Cover (4020)
Approved Approved Approved
By Date By Date By Date
Efl Final - Electrical (4055)
Approved
By Date'
El
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date