Loading...
22-103603Electrical City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PUTNAM Project Address: 32207 7TH PL SW Permit #:22-103603-00-EL Inspection Request Line: (253) 835-3060 Project Description: BLUEBEAM - 9.60kWDC Rooftop Photovoltaic Solar Installation Parcel Number: 926492 0330 Owner Applicant Contractor GALE PUTNAM JESUS FAMILIALUMIO LUMIO HX INC 32207 7TH PL SW 2500 MOTTMAN RD SW SUITE 100 LUMI0HI784K4 (5/24/24) FEDERAL WAY WA 98023-5539 TUMWATER WA 98501 2500 MOTTMAN RD SW SUITE 100 TUMWATER WA 98512 Additional Permit Information Is this an Online or O.T.C. application?_ __ ___ . . _ No Alt. Serv./Feeder: 0 to 200 aml Electrical Fixtures CONDITIONS: Fire conditions: Upon completion of installation, the following photographs shall be emailed to review@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. Email the photo; sasa.ndfonasi e at least 2 business days before requesting electrical final. PERMIT EXPIRES Saturday,15 April, 2023 Permit Issued on Monday, October 17, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and- the City of Federal Way. Owner or agent: P I 1 9; Date: L--,. f_1 kta- / _11;k CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 103603 00 Project: ELLEN L PUTMAN Address: 32207 7TH PL SW FEDERAL WAY WA 98023-5539 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) © Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date Ceiling Cover (4020) Final - Electrical (4055) Approved Approved q rr—,Zo� By Date By Date//� ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date