Project Name: OSPREY BUILDING
Project Address: 33940 WEYERHAEUSER WAYS
Building - Commercial
Permit #:21-104797-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 215466 0020
Project Description: BLUEBEAM - Vacant building, remodel existing first floor lobby and update finishes on
bathrooms on 3 floors. No new plumbing fixtures, all finishes updated only. Includes
mechanical for ducts and diffusers.
Owner
Applicant
Contractor
Lender
DM VENTURES FALCON LLC
CHRISTIAN LAROCCOM J R
NORTHWAY CONSTRUCTION
OWNER IS LENDER
6725 116TH AVE NE
DEVELOPMENT
INC
KIRKLAND WA 98033
6725 116TH AVE NE SUITE 100
433 VALENTINE AVE SE SUITE 10
KIRKLAND WA 98033
PACIFIC WA 98047
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
B
Construction Type:
Type II - B
Occupancy Load:
Floor Areas . ft.
0.00
Additional Permit Information
Occupancy #1 - Construction Type .........................
Type II - B
Mechanical to be Included?....................................
Yes
Plumbing Work Valuation? .....................................
0
Mechanical Work Valuation?.................................
32500
Number of Stories ...................................................
3
Is this an Online or O.T.C. application?..................
No
Permit for Building Shell Only? ..............................
No
Plumbing to be Included?......,.................................
No
Occupancy #I -Use ................................................
Professional
Comprehensive Plan Designation...........................
Office Park
Services/Offices
Zoning Designation .................................................
OP-2
Total Valuation: 275,000.00
Ducting
1
Mechanical Fixtures
CONDITIONS:
Fire conditions:
A separate permit is required for sprinkler or fire alarm modifications. Obtain permits through the City
of Federal Way Permit Center.
PERMIT EXPIRES Sunday, 26 June, 2022
Permit Issued on Tuesday, December 28, 2021
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: _ Date:
CRY 4P 441.11�
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQIJE TS: (253) 835-3050
PERMIT #: 21 104797 00
Address: 33940 WEYERHAEUSER WAY S Unit 204
Project: DM VENTURES FALCON LLC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered
until
it is approved. Check with your inspector if
you
are unsure about any of the inspections or the
inspection sequence. On -going inspections are logged on the back of this card.
Q
Initial Erosion Control (4365)
0 Footings/Setback (4110)
El
Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete or grout
By
Date
By Date
By
Date
®
Slab/Concrete Floor (4255)
Q Underfloor Framing (4285)
[
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By Date
By
Date
❑7
Mechanical Rough -in (4165)
® Gas Piping (4125)
®
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By
Date
By Date
By
Date
10
Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
El
Framing (4120)
Approved
Electrical, Plumbing & Mechanical Rough -in
Approved to insulate
and Fire/Draft Stop inspections must be signed -
By
Date
off and approved. IBC 109.3.4
By
Date
t z
Insulation (4150)
13 Gypsum Wallboard Nailing (4130)
14
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By Date ,f /� Z
By
Date
15
Final - S K F & R (4060)
is
Final - Planning
H
Final Erosion Control (4375)
Approved
Approved
Approved
By
Date
By
Date
By
Date
$ Final - Mechanical (4065) Final - Building (4050)
Approved Approved
By Date By IJ� Date
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
fly