Loading...
21-104797-Permit FinalCity or Federal way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: OSPREY BUILDING Project Address: 33940 WEYERHAEUSER WAYS Building - Commercial Permit #:21-104797-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 215466 0020 Project Description: BLUEBEAM - Vacant building, remodel existing first floor lobby and update finishes on bathrooms on 3 floors. No new plumbing fixtures, all finishes updated only. Includes mechanical for ducts and diffusers. Owner Applicant Contractor Lender DM VENTURES FALCON LLC CHRISTIAN LAROCCOM J R NORTHWAY CONSTRUCTION OWNER IS LENDER 6725 116TH AVE NE DEVELOPMENT INC KIRKLAND WA 98033 6725 116TH AVE NE SUITE 100 433 VALENTINE AVE SE SUITE 10 KIRKLAND WA 98033 PACIFIC WA 98047 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: B Construction Type: Type II - B Occupancy Load: Floor Areas . ft. 0.00 Additional Permit Information Occupancy #1 - Construction Type ......................... Type II - B Mechanical to be Included?.................................... Yes Plumbing Work Valuation? ..................................... 0 Mechanical Work Valuation?................................. 32500 Number of Stories ................................................... 3 Is this an Online or O.T.C. application?.................. No Permit for Building Shell Only? .............................. No Plumbing to be Included?......,................................. No Occupancy #I -Use ................................................ Professional Comprehensive Plan Designation........................... Office Park Services/Offices Zoning Designation ................................................. OP-2 Total Valuation: 275,000.00 Ducting 1 Mechanical Fixtures CONDITIONS: Fire conditions: A separate permit is required for sprinkler or fire alarm modifications. Obtain permits through the City of Federal Way Permit Center. PERMIT EXPIRES Sunday, 26 June, 2022 Permit Issued on Tuesday, December 28, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _ Date: CRY 4P 441.11� Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQIJE TS: (253) 835-3050 PERMIT #: 21 104797 00 Address: 33940 WEYERHAEUSER WAY S Unit 204 Project: DM VENTURES FALCON LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Initial Erosion Control (4365) 0 Footings/Setback (4110) El Re -steel (4215) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete or grout By Date By Date By Date ® Slab/Concrete Floor (4255) Q Underfloor Framing (4285) [ Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ❑7 Mechanical Rough -in (4165) ® Gas Piping (4125) ® Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date 10 Interim Erosion Control (4370) Prior to scheduling a Framing inspection; El Framing (4120) Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate and Fire/Draft Stop inspections must be signed - By Date off and approved. IBC 109.3.4 By Date t z Insulation (4150) 13 Gypsum Wallboard Nailing (4130) 14 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop tile By Date By Date ,f /� Z By Date 15 Final - S K F & R (4060) is Final - Planning H Final Erosion Control (4375) Approved Approved Approved By Date By Date By Date $ Final - Mechanical (4065) Final - Building (4050) Approved Approved By Date By IJ� Date Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date fly Date By Date