Loading...
21-104979-Permit FinalCity of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: NORTHWEST CHURCH Project Address: 34800 21ST AVE SW Building - Commercial Permit #:21-104979-00-CO Inspection Request Line: (253) 835-3050 Parcel Number: 542350 0630 Project Description: BLUEBEAM - Modify portion of basement storage to classroom. No plumbing or mechanical included. Owner Applicant Contractor Lender NORTHWEST CHURCH CHARLYN WINGARD FINISH LINE SOLUTIONS LLC OWNER IS LENDER 34800 21ST AVE SW '14 FAIRWOOD BLVD NE SUITE 9 6218 MONTEVISTA DR SE FEDERAL WAY WA 98023 TACOMA WA 98402 AUBURN WA 98092-8272 Census Category: 437 - Commercial alt / add / conversion Includes: Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) #1 92 #3 #4 A-3 Type II -B 39.00 768.00 Additional Permit Information Occupancy #1 - Area (Sq. Feet) ............................. 768 Mechanical to be Included? .................................... No Mechanical Work Valuation?..... ............................ 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included? ........................................ No Comprehensive Plan Designation ........................... SF - High -Density Residential Total Valuation: 50,000.00 Occupancy #1 - Construction Type ......................... Type II - B Plumbing Work Valuation?-.. ........... _ ... ........... 1..., 0 Number of Stories ................................................... I Permit for Building Shell Only? .............................. No Occupancy #1 - Use ................................................ Church Zoning Designation ................................................. RS 7.2 No Fixtures Associated With This Permit 11 CONDITIONS: Fire conditions: Modifications to the sprinkler and fire alarm will require separate permits that can be obtained from the Citv of Federal Way. PERMIT EXPIRES Saturday, 9 July, 2022 Permit Issued on Monday, January 10, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of V1ldshi n ar'd'the City of Federal Way. Owner or agent: ' ' � � � J Date. Fo "'x THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 21 104979 00 Address: 34800 21ST AVE SW Project: NORTHWEST CHURCH FEDERAL WAY WA 98023-3044 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Footings/Setback (4110) 0 Re -steel (4215) 0 Slab/Concrete Floor (4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date Underfloor Framing (4285) 0 Floor Sheathing (4105) © Fire/Draft Stops (4095) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date �7lLz, Prior to scheduling a Framing inspection; 7� Framing (4120) ® Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 Approved to insulate By & Date y'/ By Approved to install wallboard Date Gypsum Wallboard Nailing (4130) 1 O Suspended Ceiling Grid (4265) 19 Final - S K F & R (4060) Approved to install mud & tape Approved to drop tile Approved By r4t.-N Date By Date By Date 12 Final - Building (4050) By Approved DMO q Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date