22-100970-Permit FinalCity of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GALLERY K
Project Address: 2150 S 314TH ST
Building - Commercial
Permit #:22-100970-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 092104 9053
Project Description: BLUEBEAM - Installation of partition walls, doors windows and lighting for tenant
improvements. No Plumbing or Mechanical included.
Owner
Applicant
Contractor
Lender
HILLSIDE PLAZA ASSOCIATES
KWANGHYUN BAEKU I L
J C I STUDIO INC
TENANT IS LENDER
LLC
ARCHITECTS
33130 PACIFIC HWY S SUITE 6
PO BOX 5003
1800 136TH PL NE SUITE 207
FEDERAL WAY WA 98003
BELLEVUE WA 98009
BELLEVUE WA 98005
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occupancy Class:
M
Construction Type:
Type V - B
Occupancy Load:
26.00
Floor Area (sq. $.)
2,140.00
Additional Permit Information
Occupancy #1 - Area (Sq. Feet)....... ....................... 2140
Mechanical to be Included? .................... :................ No
Mechanical Work Valuation? .................................. 0
Is this an Online or O.T.C. application? .................. No
Plumbing to be Included? ........................................ No
Comprehensive Plan Designation ........................... City Center Frame
Total Valuation: 50,000.00
Occupancy #1 - Construction Type ............... . Type V - B
Plumbing Work Valuation? ..................................... 0
Number of Stories ................................................... I
Permit for Building Shell Only? .............................. No
Occupancy #1 - Use ................................................ Retail/Mercantile
Zoning Designation ................................................. CC-F
No Fixtures Assoclated With This Permit 11
CONDITIONS:
Fire Conditions:
A separate permit is required for the modification of the fire sprinkler system.
Obtain the permit from the City of Federal Way.
PERMIT EXPIRES Sunday, 2 October, 2022
Permit Issued on Tuesday, April 5, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and thedjfi&vjWI Fiin dance with the laws, rules and regulations of the State of
s ngt �d the City of Federal Way.
i
a�
Owner or agent:
Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 100970 00
Address: 2150 S 314TH ST
Project: HILLSIDE PLAZA ASSOCIATES LL FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q
Site Assessment (Erosion) (4365)
0
Footings/Setback (4110)
Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete or grout
By
Date
By
Date
By Date
El
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
0 Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By Date
0
Fire/Draft Stops (4095)
®
Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
Approved
Approved
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed -
By
Date
By
Date
off and approved. IBC 109.3.4
Framing (4120)
1c
Insulation (4150)
El Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard
Approved to install spud & to
By
Date S! 13 ZZ
By
Date
By Date
12 Suspended Ceiling Grid (4265)
Final - S K F & R (4060)
td Final - Planning
Approved to drop the
Approved
Approved
By
Date
By
Date
By Date
Final Erosion Control (4375) ' Final - Building (4050)
Approved Approved
By Date By Date Cu a`% y
®
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date