Loading...
23-100632r r City of Federal Way Community Development Dept. 33325 8th Ave S' Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name Project Address Project Description �x Mechanical I L L4Permit #:23-100632-00-ME Inspection Request Line: (253) 835-3050 PALISADES AT DASH POINT CONDOMINIUMS Unit 06-B 31826 48TH CIR SW REPLACING GAS WATER HEATER Parcel Number: 661320 0050 Owner Applicant Contractor ROBERT WROBLEWSKI KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 31826 48TH CIR SW ENERGY SERVICES CO (PLUMBING) FEDERAL WAY WA 3909 196TH ST SW WASHIES796NU (10/25/23) 98023-4129 LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation? .................................. 2500 Is this an Online or O.T.C. application?.................. Yes Hot Water Tanks Mechanical Fixtures PERMIT EXPIRES Saturday, 5 August, 2023 Permit Issued on Monday, February 6, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 01\11 I KI F , Date: CRY OF Federal Way THIS CARD IS TO REAL -I\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TffiS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work mist not be covered until it is approved. Check with your inspector if you are unsure about any, of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 By 0 By LTER Ground (4295) Approved Date Pool Bonding (4195) Approved Date ❑ By ❑ By Ditch corer (4030) Approved Date Temporary Pourer (4275) Approved Date ❑ By ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date Service (4235) Approved Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved By Date MECHANICAL Ll Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By 90 Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date