23-100786Cily of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GREENE/ORTON
Project Address: 4001 SW 323RD ST
Project Description: Like for like replacement of heat pump
Mechanical
Permit #:23-100786-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 873196 0850
Owner
Applicant
Contractor
BETH GREENE
DAVE TREATAUBURN SHEET METAL
AUBURN SHEET METAL INC
4001 SW 323RD ST
INC
(GENERAL)
FEDERAL WAY WA 98023
844 S MT VILLA DR
AUBURI*222RQ (4/30/23)
ENUMCLAW WA 98022
PO BOX 1354 '
ENUMCLAW WA 98022
Additional Permit Information
Mechanical Work Valuation? ....... ....................... 9000 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Compressors / Heat Pumps 1
PERMIT EXPIRES Saturday, 12 August, 2023
Permit Issued on Monday, February 13, 2023 '
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
s �ng an t C y ederal Way.
9
Owner or agent: Date:
r-1)IW
o& CITY w
Federal Way
THIS CARD IS TO REND O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3030
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work nuut not be covered until it is approved. Check %Kith tour mspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
Q
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
?l Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165)
❑ Gas Piping (4125)
0 Final - Mechanical (4065)
Approved
4XJ'�
�
Approved to release test
Date
,,Approved
rr
B` �� Date
By Date
B�-
PLUMBING
❑ ❑ Final - Plumbing (4075)
Approved
By Date
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
Approved to cover
Approved
By
Date
By
Date