Loading...
23-100786Cily of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GREENE/ORTON Project Address: 4001 SW 323RD ST Project Description: Like for like replacement of heat pump Mechanical Permit #:23-100786-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 873196 0850 Owner Applicant Contractor BETH GREENE DAVE TREATAUBURN SHEET METAL AUBURN SHEET METAL INC 4001 SW 323RD ST INC (GENERAL) FEDERAL WAY WA 98023 844 S MT VILLA DR AUBURI*222RQ (4/30/23) ENUMCLAW WA 98022 PO BOX 1354 ' ENUMCLAW WA 98022 Additional Permit Information Mechanical Work Valuation? ....... ....................... 9000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Compressors / Heat Pumps 1 PERMIT EXPIRES Saturday, 12 August, 2023 Permit Issued on Monday, February 13, 2023 ' I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of s �ng an t C y ederal Way. 9 Owner or agent: Date: r-1)IW o& CITY w Federal Way THIS CARD IS TO REND O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3030 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work nuut not be covered until it is approved. Check %Kith tour mspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) Q Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ?l Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved 4XJ'� � Approved to release test Date ,,Approved rr B` �� Date By Date B�- PLUMBING ❑ ❑ Final - Plumbing (4075) Approved By Date Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Approved to cover Approved By Date By Date