23-100794City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Mechanical
FI Permit #:23-100794-00-ME
L . „3
Inspection Request Line: (253) 835-3050
Project Name: DIENER
Project Address: 33313 12TH AVE SW Parcel Number: 926496 0020
Project Description: remove gas log lighter and install gas insert including vent system
Owner
Applicant
Contractor
JOANN FRANCES DIENER
ROBERT TAYLOR
ADVANCED INSTALLATIONS INC
.33313 12TH AVE SW
4221 S TIMBERLINE RD
ADVAN11033DU (3/13/24)
FEDERAL WAY WA 98023-5301
CLINTON WA 98236
16504 HWY 99 SUITE 101
LYNNWOOD WA 98037
Additional Permit Information
Mechanical Work Valuation? .................................. 750 Is this an Online or O.T.C. application?.................. Yes
Fireplace Inserts
Mechanical Fiatures
1
PERMIT EXPIRES Sunday,13 August, 2023
Permit Issued on Tuesday, February 14, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
�hrq � IN
E deral Way.
Owner or agent: Gate:
10I&
CITY o1
Federal Way
THIS CARD IS TO REAL -Us O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (2^3) 335-30: 0
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS (ARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Fork must not be covered until it is approved. Check with yotu inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
LFER Ground (4295)
0
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q Service
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
(4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El Cover
❑
FeederslSub-panels (4045)
❑
Rough Electrical (4225)
Ceiling (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test Approved
By Date B2 Date By J 0 Date Z !L
PLUMBING
El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final -Plumbing (4075)
Approved to cover Approved Approved
By Date By Date BY Date