23-100556s . — -
City of Federal Way
i
I L
Community Development Dept
i,1
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LIU
Project Address: 4222 SW 325TH ST
Project Description: gas furnace replacement / like in kind
Electrical
Permit #:23-100556-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 873201 0130
Owner
Applicant
Contractor
LEWIS LIU
TAYLER MANNINGPACIFIC HEATING &
PACIFIC HEATING & COOLING
4222 SW 325TH ST
COOLING
I (ELECTRICAL)
FEDERAL WAY WA 98023
8607 DURANGO ST SW SUITE A
PACIFHC798DR (4/12/23)
TACOMA WA 98499
8607 DURANGO ST SW SUITE A
TACOMA WA 98023
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Residential 1 Thermostat
1
PERMIT EXPIRES Tuesday, 1 August, 2023
Permit Issued on Thursday, February 2, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Date: Owner or agent:
crtr ov
Federal Way
THIS CARD IS TO REAIA.L O\-SITE
Construction Inspection Record
INSPEC'TIO\ REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS (:aRD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
0
LIFER Ground (4295)
Q
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
0
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
F' al - Electrical (4055)
Approved
By
Date., ��� ✓�
MECHANICAL
❑
Mechanical Rough -in (4165)
Z❑
Gas Piping (4125)
❑
-Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
B,%,
Date
PLUMBING
Q
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑�
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date