Loading...
23-100758City of Federal Way Community Development Dept. 33325 Sth Ave 5 1 L Federal Way, WA 98003 4" -may Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PHAM Project Address: 28561 20TH AVE S Project Description: 200AMP LIKE FOR LIKE PANEL CHANGE Electrical Permit #:23-100758-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 422200 0380 Owner Applicant Contractor NGUYEN PHAM KATHY SKIPPERSkipper & Son's Electric SKIPPER & SON'S ELECTRIC LLC 28561 20TH AVE S 7821 78TH AVE SW SKIPPSE798P1(10/15/23) FEDERAL WAY WA 98003-3233 LAKEWOOD WA 98498 7821 78TH AVE SW LAKEWOOD WA 98498 Is this an Online or O.T.C. application? New Service: Residential Additional Permit Information Yes Electrical Fixtures 1 PERMIT EXPIRES Wednesday, 9 August, 2023 Permit Issued on Friday, February 10, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ON i ..of Federal Way. 9 Owner or agent: Date: 0& CITY or Federal Way THIS CARD IS TO REJIM ON -SITE Construction Inspection Record INSPECTION REQUSTS: (253) 335-30-50 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approx-ed. Check with Your inspector if you are unsure about any of the inspections or the inspection sequence. On going inspections are logged on the back of this card ❑ LIFER Ground (4295) Approved By Date Pool Bonding (4195) Approved By Date ❑ FeederslSnb-panels (4045) Approved By Date El Final - Electrical (4055) Approved By Date��I ❑ Mechanical Rough -in (4165) Approved By Date ELECTRICAL ❑ By Ditch cover (4030) Approved Date ❑ Temporary Power (4275) Approved By Date ❑ Rough Electrical (4225) Approved By Date MECHANICAL Q Gas Piping (4125) Approved to release test By Date PLUMBING ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date Service (4235) Approved By Date ❑ Ceiling Cover (4020) Approved By Date ❑ Final - Mechanical (4065) Approved By Date ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑� Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date