Loading...
22-105303City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CUNNINGHAM Project Address: 818 S MARINE HILLS WAY Electrical Permit #:22-105303-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 515293 0120 Project Description: BLUEBEAM - Installation of 11.34 kW DC solar PV system on roof: (28) ENPHASE IQ7A-72-2-US (28) REC SOLAR REC405AA PURE Owner Applicant Contractor EDWARD & SHARON CUNNINGHAM PAIGE FARRISSOLTERRA GLOBAL LLC SOLTERRA GLOBAL LLC 818 S MARINE HILLS WAY 2910 1ST AVE S SUITE 201 SOLTEGL838BS (1/10/23) FEDERAL WAY WA 98003 SEATTLE WA 98134 2910 1 ST AVE S SUITE 200 SEATTLE WA 98134 Additional Permit Information Is this an Online or O.T.C. application? .................. No Alt. Serv./Feeder: 0 to 200 aml Electrical Fixtures CONDITIONS: Fire conditions: Upon completion of installation, the following photographs shall be emailed to review@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. PERMIT EXPIRES Saturday, 17 June, 2023 Permit Issued on Monday, December 19, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wasf ffi foK Arid the City of Federal Way - Owner or agent: - Date: I'' r Vl ov I -1 1 THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105303 00 Address: 818 S MARINE HILLS WAY Project: EDWARD & SHARON CUNNINGHA FEDERAL WAY WA 98003-3183 Scheduled inspections may be failed if this card is not on -site. DO NOT LOST: TIIIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. UFER Ground (4295) El Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) 0 Temporary Power (4275) © Service (4235) Approved Approved Approved By Date By Date By Date El Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Q Final - S K F & R (4060) Approved Approved \ Approved \01f By Date By Date By Date El Ceiling Cover (4020) El Final - Electrical (4055) Approved ppro.ed By Date By /j e00 Dated 7/ Y Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date