23-100277Electrical
Cityof
Deveral elopment
t Permit #:23-100277-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) B35-2609
Project Name: ROSS
Project Address: 34833 8TH PL SW Parcel Number: 132174 0420
Project Description: BLUEBEAM - 8.80 kW DC rooftop PV solar installation.
Owner
Applicant
Contractor
MICHAEL ROSS
JESUS FAMILIALUMIO
LUMIO HX INC
34833 8TH PL SW
2500 MOTTMAN RD SW SUITE 100
LUMIOHI784K4 (5/24/24)
FEDERAL WAY WA 98023-8449
TUMWATER WA 98501
2500 MOTTMAN RD SW SUITE 100
TUMWATER WA 98512
Additional Permit Information
Is this an Online or O.T.C. application? ............. No
Alt. Serv./Feeder: 0 to 200 aml 1
CONDITIONS:
Fire conditions:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org and alarms@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
If no response from SKFR within 2 business days, call 253-946-7348 to check status.
PERMIT EXPIRES Tuesday, 1 August, 2023
Permit Issued on Thursday, February 2, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Was�uvtI n �pd the City of Federal Way.
Owner or agent:
Date:
4 THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 100277 00 Address: 34833 8TH PL SW
Project: MICHAEL ROSS FEDERAL WAY WA 98023-8449
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE: TI11S CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
El
UFER Ground (4295)
El
Ditch cover (4030)
0
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
4❑
Pool Bonding (4195)
0
Temporary Power (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
Approved
® Rough Electrical (4225)
Approved
a❑ Final - S K F & R (4060)
Approved
By Date
Byf Date
By Date
1l) Ceiling Cover (4020)
U Final - Electrical (4055)
Approved
By Date
A ;ey�Ar �
By Datate
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
11y
Date
By ,
Date