Loading...
17-104331FILE CITY OF L Federal Way October 23, 2017 David Thorstad 406 South 289°i Street Federal Way, WA 98003 RE: File #17-104331-00-AU; ADU Approval Lee, 29628 V Avenue South, Federal Way Dear Mr. Thorstad: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway. com Jim Ferrell, Mayor dltarchitect@comcast. net The Department of Community Development has completed review of the Accessory Dwelling Unit (ADU) application submitted to the city on September 7, 2017. The ADU application is hereby approved pursuant to the findings presented by the department's Planning Division staff and the conclusions based on those findings. FINDINGS OF FACT The following findings are based on site, elevation, and floor plans received with the ADU application on September 7, 2017: 1. Proposal — The applicant proposes to construct an attached ADU within an existing single-family house located at 29628 1" Avenue South, Federal Way. The ADU is located in the unfinished basement of the house and no change in the footprint is proposed. 2. Zoning —The subject property is a 13,939 square -foot (032-acre) lot with a Single -Family Residential (RS9.6) zoning designation. The proposal meets the minimum lot size requirement per Federal Way Revisecl Code (FWRC) 19.200.180, Note 1. Lot Coverage — There is no change in the lot coverage. 4. Floor Plan — The total square footage of the proposed ADU living area is 793 square feet, including a living room, kitchen, bathroom, and two bedrooms. There is a recreation area in the basement that is not included as part of the ADU. The principal dwelling unit contains 3,691 square feet of livable area; therefore, the proposed ADU complies with the maximum allowable livable area, which is 40% of the living area in the primary dwelling unit. The proposal also will not exceed the maximum accessory dwelling unit size of 800 sq. ft. (FWRC 19.200.180, Note 9). 5. Parking — The site plan depicts an existing three -car garage and concrete driveway. As such, there is sufficient amount of parking for the required one on -site parking for the ADU. Required Yards & Height —The proposed ADU is located within the basement of the existing house, which meets all the current setback and height requirements. 7. Water & Seiver— Lakehaven Water and Sewer District issued Certificates of Water and Sewer Availability on September 6, 2017. The existing 8" diameter sewer main has capacity to serve the Mr. Thorstad October 23, 2017 Pagc 2 proposed land use; a Sewer Service Connection Permit is required. Water service can be provided by service connection to an existing 6" diameter water main; a Water Service Connection application is required. 8. Owner Occupancy —The applicant has submitted a signed letter of application and deed restriction stating the owner shall occupy one of the two dwelling units as a permanent residence •for six months or more of the calendar year. The owner will occupy the primary dwelling unit. When the ADU is completed, the applicant must record the Letter of Application and Deed Restriction with King County and provide a copy of the recorded document to the City. CONCLUSIONS The following conclusions are based on the above findings of fact. 1. The proposal is consistent with policies of the Federal Way Comprehensive Plan. 2. The proposal meets density, square footage, parking, occupancy, and dimensional requirements of the ADU Use Zone Chart within Federal Way Revised Code (FWRC) 19.200.180. 3. The ADU is subordinate and incidental in size, scale and design of the primary dwelling unit, and the appearance remains that of a single family residence. CONDITION OF APPROVAL Prior to the final building inspection of the new ADU, please record the enclosed Letter of Application & Deed Restriction with the King County Recorder's Office, and return a copy to the City with the enclosed resubmittal form. BUILDING PERMIT REQUIRED This ADU decision does not constitute building permit approval. Building permit #17-104332-00-SF for the ADU is under review by City staff. Final inspections for the completed ADU will be conducted as part of a building permit process associated with this project. CLOSING This administrative ADU decision does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. If you have any questions regarding this decision, please contact Associate Planner Becky Chapin, at 253-835-2641 or becky.chap in@cityoffederalway.corn. Sincerely, Brian Davis Community Development Director enc; Approved Site Plan Letter of Application & Deed Restriction RCSUbmlttal form ti_ Yun- Lee. 29628 1" Ave S_ Federal Way. WA 98003 17-I04331-00-AU Doc I D 76617 After recording, please return to: Community Development Department 33325 8th Avenue South Federal Way, WA 98003 IdIV{N9�I IIIIiYIIn�111161111AN!�BI�II{Iltl 20171201000531 MISCELLANEOUS Rec: $74.00 /21112017 11:55 AM KING COUNTY, WA CITY OF FEDERAL WAY ACCESSORY DWELLING UNIT LETTER OF APPLICATION & DEED RESTRICTION I, YQ H4 r a , being first duly sworn, on oath do hereby certify under penalty of perjury u der the l ws of the State of Washington: That I/we am/are owner of the single-family dwelling unit located at: vl k 7, Federal Way, Washington, Parcel # JA24 Property Legal Description 1Z7 rqpf Zia at I ha e a e application and at this location. Tirl -744,- �-4-1 _L (4 Y., A A City of Fede.I Way land u e for an accessory dwelling unit That I presently occupy and will continue to occupy one of the two dwelling units at this location as my principal and permanent residence for six months or more of the calendar year. That this certification will remain in effect during the period of my Lvnership of the property unless I record a certification with the King County Office of Records and Elections tha e ule of the property for an accessory dwelling unit has been discontinued. Signature of Ap nt State of Was"ton tan ) )SS - County of On this day personally appeared before me to me known to be the individual described in and who executed the within �dforc;gbing instrument, and acknowledge that he/she signed the same as his/her free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal on this day o 20� ,Notary's signature U,_"" LOIS IRENE TORRES NOTARY PUBLIC STATE OF WASHINGTON COMMISSION EXPIRES NOVEMBER 5, 2018 Notary's printed name Notary Public in and for th SSjtate of Washington^ My commission expires Falsely certifying owner occupancy is subject to a civil penalty of $S, 000, in addition to any criminal penalties. 4ik CITY Federalo. Way DEPARTMENT OF COMMUNITY DEVELOPMENT 33325 8`h Avenue South Federal Way, WA 98003 253-835-2607; Fax 253-835-2609 RECEIVED www.citvoffederal►vay.com SEP 0 7 2017 iTY CF FEDERAL WAY ACCESSORY DVI�,LjI'NC;E0fT (ADU) FEE: Contact the Permit Center at 253-835-2607, or permitcenter ncityoffederahi,ay com FILE # 11-1 O V0 RELATED FILE #s: I O L'yOr Owner's Name: s.�> tA/ Lt.}_L Address: � Liz,-, 1 �� Daytime Phone: 2, mil, �7 Tax Parcel#: Zoning: Lot Size in Square Feet: Type of ADU: I Attached ❑ Detached Is this a: ■ New ADU ❑ Existing ADU Existing ADU was: ❑ Approved by King County (Provide a copy of the permit.) ❑ Other Construction of existing ADU completed in 19/20� Construction of existing residence completed in 19420_ Which is the owner occupied unit: 6 Primary Dwelling Unit or ❑ ADU Number of square feet: ' Primary Dwelling Unit ZZ ADU Provide the following information: ❑ Lakehaven Utility District Water & Sewer Certificates of Approval for the New ADU ❑ King County Public Health Department Approval (if septic) ❑ Heating Type: ❑ Electric 5 Gas ❑ Other ❑ Electrical Capacity. r Primary Dwelling Unit ❑ Letter of Application & Deed Restriction (attach) ADU FLOOR PLAN DRAWINGS (Provide the following; refer to page 3 for an example.) ❑ Floor plan of the primary dwelling unit and the ADU ❑ Plumbing (existing & proposed) ❑ Mechanical — HeatingNentilation/Air Conditioning (existing & proposed) ❑ Entrances of primary dwelling unit and ADU (existing & proposed) ❑ Ceiling Heights/Room Sizes for ADU ❑ Elevation of the proposed ADU with the primary dwelling unit ADU Bulletin 4049 — December 21, 2015 Page 1 of 3 k:\HandoutsWDU Application ADU SITE PLAN DRAWINGS (Provide the following; refer to page 3 for an example.) ❑, Scale/north arrow ❑ Street/driveway location ❑ Lot dimensions ❑ Primary dwelling unit ❑ ADU footprint (if detached) ❑ Building setbacks from property line ❑ Location of utilities & easements ❑ Show location of three on -site parking stalls 0 Locate the entrance of the primary dwelling unit and the ADU ❑ Calculate the total impervious surfaces coverage for the site (Include the existing and proposed roof area, driveway, patios, and walkways.) ❑ Other DISCLAIMER: I certify under penalty of perjury that the information furnished by me is true and correct to the best of my knowledge and further, that I am authorized by the owner of the above premises to perform the work for which the permit application is made. Signature of Ap licant Date WAIVER: Approval of the ADULand Use Application does not constitute approval of the building permit. Application and approval of the building permit is a separate process. OFFICE USE ONLY ❑ ADU Status: ❑ Legal Nonconforming per FWRC 19.30.140 R New ADU ❑ Assigned Address of ADU XDeed Restriction/Letter of Application Rec'd ❑ Recording Number ❑ Other Approved by Date ❑ Conditions of Approval Bulletin #049 — December 21, 2015 Page 2 of 3 k:\Handouts\ADU Application