RE: File #13-104996-00-UP; PROCESS I `DIRECTOR'S APPROVAL'
Cove East Trash Enclosure, 33030 Is` Avenue South, Federal Way
Dear Applicant:
The Community and Economic Development Department bas received your Process I Master Land Use
(MLU) application to construct a CMU compactor enclosure. The Process I MLU application is hereby
approved pursuant to conclusions based on findings made by the department's Planning Division.
FINDINGS
The zoning for the site is Multi -Family Residential (RM2400). The existing Cove East Apartments are an
allowed use in the RM2400 zone per Federal Way Revised Code (FWRC) 19.205.040 The new trash
compactor and enclosure was reviewed as an administrative land use process pursuant to FWRC Chapter
19.55, `Process I — Director's Approval'.
The proposed compactor enclosure is 8 feet 8 inches tall installed on a new concrete slab. The
construction is a solid screen CMU wall with gate. Additionally, due to the location of the proposed
enclosure and existing mature vegetation/landscaping along the right-of-way, the proposed compactor
enclosure does not require additional screening.
The enclosure does not reduce the amount of required landscaping, buffering, open space, parking, or
public areas; and does not alter pedestrian connections, utilities, or easements.
RECOMMENDATION
The City's Surface Water Management Division has found that trash compactors will eventually, over
time, leak liquids and/or hydraulic fluids, which then get washed into the City's storm drain system in
violation of the City's NPDES permit and water quality standards, and then becomes an enforcement
action by the City against the property owner.
While not required, we strongly encourage the owner to provide a roof over the compactor, provide a
drain in the slab that the compactor will rest on, and connect that drain to the sanitary sewer system (with
Lakehaven Utility District approval), in order to avoid future water quality violations, enforcement
actions and/or fines.
Cove East
December 10, 2013
Page 2
If sewer service connection for the proposed trash enclosure area is provided, then a Lakehaven sewer
service connection permit (SSCP) & Discharge Agreement (DA) will be required. The design guidelines
are enclosed for reference.
ADDITIONAL PERMIT ISSUANCE REQUIRED
The city's Building Division is currently reviewing the building permit for the compactor enclosure (file
#13-104997-00-CO). Please contact the permit center at 253-835-2607, or
permitcenter@cityoffederalway.com, if you have any questions regarding the permit.
APPEALS
The effective date of this decision is December 13, 2013, or three days from the date of this letter.
Pursuant to FWRC 19.55.150, any person who received notice of the administrative decision may appeal
this decision to the Federal Way Hearing Examiner by December 27, 2013. Any appeal must be in the
form of a letter delivered to the Department of Community and Economic Development with the
established fee. The appeal letter must contain a clear reference to the matter being appealed and a
statement of the alleged errors in the Director's decision, including the identification of specific findings
and conclusions made by the Director disputed by the person filing.
In that you are the only party of record, your appeal period is waived (assuming you do not wish to appeal
this decision). Waiver of the right to appeal does not affect the effective date of this decision.
CLOSING
This land use decision does not waive compliance with future City of Federal Way codes, policies, and
standards relating to this development. This Process I approval does not constitute approval of a building,
mechanical, or electrical permit. If you have any questions regarding this decision, please contact Becky
Chapin, Assistant Planner, at 253-835-2641, or becky.chapin@cityoffederalway.com.
Sincerely,
Isaac Conlen
Planning Division Manager
for Patrick Doherty, Director
enc Approved Site Plan
Lakehaven Handouts
c: Kevin Peterson, Engineering Plans Reviewer
Brian Asbury, Lakehaven Utility District
13-104996 Doc. ID. 64639
RECEIVED
NOV 0 7 2013 MASTER LAND USE APPLICATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
CITY OF FEDERAL WAY 33325 8`' Avenue South
CITY OF CDS Federal Way, WA 98003-6325
Federal Way 253-8 www. i Fax 253-835-2609
w w w.cityoffedera] way.com
APPLICATION NOS — v v " Date Z
Project Name C VU co 1 ` PA `-11r0N U-0 S 0�"`�
Property Address/Location
Parcel Number(s)�1 Z1
Project Description if "{ t.' V ����5 V C/ ` ! a
PLEASE PRINT
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
Preapplication Conference
Process I (Director's Approval)
Process Il (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
4 60 Zoning Designation
l) l omprehensive Plan Designation
Value of Existing Improvements
V 6 Value of Proposed Improvements
International Building Code (IBC):
f QQ Occupancy Type
V C� Construction Type
Applicant
Name: �� ��
f )�
� �P/7�" 7
S�
Address. �'(
�r �l �
City/State: JB C A (IV F
Zip: w 4
g 9 2 3 Q
Phone: 3 60
- goo - 3 / q0
Fax. 3� 0- 6 5' - 61 d 5
Email: "t
Signature:
Agent (if different than Applicant)
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Owner
tic lk Name: H J<T 14 Vi/ r 919-5 0
Address: 60DAv A� P(,
Citylstate. t�: t � { w gA pi 8 }
Zip: t t
Phone:
Fax: }�
Email: H L) q �PU62_ 012q
Signature: (
Bulletin #003 — January 1, 2011 Page 1 of 1 k:\Handoutsuvlaster Land Use Application