Loading...
19-10178441k CITY OF Federal Way RECEIVE® WORK HOUR VARIANCE REQUEST COMMUNITY DEVELOPMENT DEPARTMENT APR 16 2019 33325 81h Avenue South Federal Way, WA 98003-6325 CITY OF FEDERAL WAY 253-835-2607; Fax 253-835-2609 COMMUNITY DEVELOPMENT www.cityoffederalway.com FILE NUMBER I q - I_ v I -71 ff DATE "► J 10 I APPLICANT INFORMATION NAME PRIMARY PHONE Costco Wholesale c/o Kim Katz, Director of Real Estate (425) 427-7540 BUSINESS/ORGANIZATION ALTERNATE PHONE Costco Wholesale MAILING ADDRESS E-MAIL 999 Lake Drive kkatz@costco.com cITY STATE zip FAX Issaquah WA 98027 Location of Work (for work on both public & private property; complete both sections): ® Private Property (Address/Parcel #): 35020 16 t h Ave. S. / 219 2 6 0- 0 2 9 0 ❑ Public Right -of -Way (Street/Cross Street): Date(s)of Proposed Work: —September 9, 2019 - November 18, 2019 (sub'ect to change) Hours of Proposed Work: Daytime hours: 7 am - 5 m • Night hours: 5 m - 7am Description of Proposed Work & Equipment Involved: See Narrative. Names & phone numbers of TWO contacts that will be available during proposed work hours: 1) Dave Viers (360 ) - 957 _ - 0913 2) Jake Jabusch ( 360 ) - 957 - 0905 Reason proposed work must be completed outside of regular work hours: See Narrativ Provide a brief explanation why the work will not be detrimental to nearby properties: See Narrative. See second page for additional application questions. Bulletin #080 — December 11, 2018 Page 1 of 2 k:\Handouts\ Work Hour Variance Request TO BE COMPLETED BYAPPLICANT 1) Are the following criteria met in accordance with FWRC 19.105.040(2)(a)(www.codepublishingcomny:r/Federa]Wai ? Yes No ® ❑ Work will not result in substantial adverse impacts to surrounding properties. 91 ❑ The exception is necessary to avoid undue delay of project completion and/or long-term inconvenience or disruption to the public. 2) Will the following criteria be met in accordance with FWRC 19.105.040(3)? Yes No ® ❑ Will written notice be mailed at least seven days in advance of the work to owners and occupants of property located within 300 feet of the project boundary? ® 0 Will a notice board that includes construction hours, description of construction activities, mitigation measures, and two 24 hour project contacts for the duration of the project be posted at the project site? 3) If the answer to question two, above, is no, what methods of notice will be provided, or why is public notice not necessary? Please explain: Please Note: This request will not be processed unless accompanied by payment of application fee. TO BE COMPLETED BY STAFF 1) Notiflcatlon Requirements Waived? Yes ❑ No bVZ4 2) Conditions of Approval Yes ❑ No Conditions Attached: ❑ Yes ❑ No 3) In accordance with FWRC 19.105.040(2)(a), this application is hereby: C ` Approved ❑ Denied Community Development Director -�-!')--col Date Bulletin #080 — December 11, 2018 Page 2 of 2 k:\Handouts\ Work Hour Variance Request • N � � • o O � Q v NC- UCoN o • LR1 W W J Z 0 N C W Z ❑ 0 BARGUAUbEN RECEIVED Fuel Facility Expansion APR 16 2019 WAY Work Hour Variance Narrative COMITY UNITY DEV LE FEDERAL Wholesale 35020 16th Avenue South, Federal Way, Washington 98003 Costco Loc. No. 0611 Our Job No. 6076 Prepared by Barghausen Consulting Engineers, Inc. April 2019 Proiect Description Costco Wholesale is requesting an exception to allow temporary night construction between 8:00 p.m. and 7:00 a.m., Monday through Friday; and between 8: 00 p.m. and 9:00 a.m., Saturday and Sunday as described in the City of Federal Way Revised Code. The project will consist of an expansion to the existing fueling facility canopy (3,200 square feet), the installation of four (4) new multi -product dispensers (MPDs), the relocation of the controller enclosure, and associated site improvements. The project site is zoned Commercial Enterprise (CE) and is surrounded by commercial and industrial uses on all sides with the nearest residence located approximately 1,800 feet to the south, therefore, no project sound impacts are anticipated for any residential properties. The adjacent uses include a shopping complex, restaurants, a gravel company, storage units, and big box retail. Purpose of Request Night construction for this project will be limited to approximately seventy (70) days. Night construction benefits the area by reducing the overall construction schedule and minimizing impacts to surrounding businesses and customers during normal business hours. Specifically, certain activities that require additional safety measures (e.g., overhead canopy welding), testing procedures and/or closures could be scheduled at night when businesses are closed and customers are not present. The use of heavy machinery is necessary for certain phases of construction, including demolition and installation of the canopy addition. Sound associated with these activities will occur during limited periods throughout the construction process. Night construction with heavy machinery is anticipated to generate between 54 and 72 decibels at approximately 400 feet from the project site, which is similar to a normal conversation and city traffic, respectively. The attached Sound Emission Exhibit provides a conservative analysis of anticipated construction sound levels at noted distances from the project site. The Exhibit does not take into account potential noise -reducing factors such as surrounding ambient noise, topography, and buildings, including Highway 161 and the existing Costco warehouse. The presence of these factors will diffuse the sound levels further than what is shown in the Exhibit for surrounding properties. Costco's contractor is experienced with nighttime construction and will employ Best Management Practices to minimize sound levels at night. The allowance of night construction will not conflict with the City's intent to protect the peace, quiet, and comfort of the community or any neighborhood therein. BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72ND AVENUE SOUTH KENT, WA 98032 P) 425-251-6222 F) 425-251-8782 BRANCH OFFICES: TUMWATER, WA KLAMATH FALLS, OR LONG BEACH, CA ROSEVILLE, CA SAN DIEGO, CA barghausen.com Conclusion Based on the above information, we believe that the city is justified in allowing nighttime construction for the Costco fuel expansion project. We appreciate the City's desire to protect the local neighborhood from nighttime construction noise and share the mutual goal of minimizing any construction impacts to the community. We appreciate the City's consideration of this request and the enclosed supporting information. 6076.025 Narrative.docx - 2 -