22-105248City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: OLIVIER
Project Address: 1929 SW 324TH ST
Electrical
Permit #:22-105248-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 010454 0490
Project Description: BLUEBEAM - Installation of 4.40 kW DC rooftop PV solar system.
Owner
Applicant
Contractor
OSCAR OLIVIER
JESUS FAMILIALUMIO
LUMIO HX INC
1221 S 248TH ST
2500 MOTTMAN RD SW SUITE 100
LUMIOHI784K4 (5/24/24)
DES MOINES WA 98198
TUMWATER WA 98501
2500 MOTTMAN RD SW SUITE 100
TUMWATER WA 98512
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 aml
CONDITIONS:
Fire conditions:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
Email the photographs at least 2 business days before requesting electrical final.
t
Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a
response back from SKFR once the permit has been approved by SKFR so you can schedule your
electrical final inspection.
PERMIT EXPIRES Saturday, 3 June, 2023
Permit Issued on Monday, December 5, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
A�
cIrr of
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 22 105248 00 Address: 1929 SW 324TH ST
Project: OSCAR OLIVIER FEDERAL WAY WA 98023-5453
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to.sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
l UFER Ground (4295)
2❑ Ditch cover (4030)
3❑ Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By Date
By Date
By Date
❑ Pool Bonding (4195)
0 Temporary Power (4275)
0 Service (4235)
Approved
Approved
Approved
By Date
By Date
By Date
] Feeders/Sub-panels (4045)
® Rough Electrical (4225)
El Final - S K F & R (4060)
Approved
By Date
Approved
By Date
Approved
By Date
Ceiling Cover (4020) "El Final - Electrical (4055)
Approved pproved ff
By Date By Da t e
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date