Loading...
22-105248City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: OLIVIER Project Address: 1929 SW 324TH ST Electrical Permit #:22-105248-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 010454 0490 Project Description: BLUEBEAM - Installation of 4.40 kW DC rooftop PV solar system. Owner Applicant Contractor OSCAR OLIVIER JESUS FAMILIALUMIO LUMIO HX INC 1221 S 248TH ST 2500 MOTTMAN RD SW SUITE 100 LUMIOHI784K4 (5/24/24) DES MOINES WA 98198 TUMWATER WA 98501 2500 MOTTMAN RD SW SUITE 100 TUMWATER WA 98512 Additional Permit Information Is this an Online or O.T.C. application? .................. No Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml CONDITIONS: Fire conditions: Upon completion of installation, the following photographs shall be emailed to planreview@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. Email the photographs at least 2 business days before requesting electrical final. t Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. PERMIT EXPIRES Saturday, 3 June, 2023 Permit Issued on Monday, December 5, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A� cIrr of Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105248 00 Address: 1929 SW 324TH ST Project: OSCAR OLIVIER FEDERAL WAY WA 98023-5453 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to.sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. l UFER Ground (4295) 2❑ Ditch cover (4030) 3❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) 0 Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date ] Feeders/Sub-panels (4045) ® Rough Electrical (4225) El Final - S K F & R (4060) Approved By Date Approved By Date Approved By Date Ceiling Cover (4020) "El Final - Electrical (4055) Approved pproved ff By Date By Da t e Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date