Loading...
22-101462City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PANTHER LAKE FOURPLEX Project Address: 33727 1ST PL S Building - Multi Family Permit #:22-101462-00-MF Inspection Request Line: (253) 835-3050 Parcel Number: 132202 0200 Project Description: BLUEBEAM - Replace all interior finishes & fixtures throughout Unit B. At Unit C replace wall finishes at party wall shared with Unit B. Replaced mansard framing above Unit B Sliding Glass Door. Includes plumbing and mechanical. Owner Applicant Contractor Lender PANTHER LAKE PROPERTIES LLC JESSE BINFORDBC ABOVE PLUMBING & INSURANCE CLAIM 1605 SW MILLER CREEK RD INVESTIGATIVE ENGINEERS CONTRACTING LLC (PLUMBING) SEATTLE WA 98166-3326 3605 "C" ST NE 1829 243RD PL SW AUBURN WA 98002 BOTHELL WA 98021 Contractor NW BUILDER GROUP 19903 32ND STREET CT SE LAKE TAPPS WA 98391 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-2 Construction Type- Tye V - B Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Occupancy #1 - Construction Type ......................... Type V - B Mechanical to be Included?..................................... Yes Plumbing Work Valuation?... .................................. 9722 Mechanical Work Valuation?.................................. 3165 Number of Stories ................................................... 2 Is this an Online or O.T.C. application?.................. No Permit for Building Shell Only? .............................. No Plumbing to be Included?........................................ Yes Occupancy #1 -Use ................................................ Apartment House Comprehensive Plan Designation............... ............ Multifamily Zoning Designation ................................................. RM 2400 Total Valuation: 224,422.00 Mechanical Fixtures Fans 3 Plumbing Fixtures Bathtubs 1 Laundry Washer Outlets Sinks 1 Water Closets 1 Lavatories 2 2 Water Heaters I PERMIT EXPIRES Tuesday, 15 November, 2022 Permit Issued on Thursday, May 19, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the. use will be in accordance with the -laws, rules and regulations of the State of v'vash.ington;al d the City of Federal Way. Owner or agent: ` J L J Date: CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUE TS: (253) 835-3050 22 101462 00 Address: 33727 1ST PL S PANTHER LAKE PROPERTIES LLC FEDERAL WAY WA 98003-6243 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Site Assessment (Erosion) (4365) 0 Footings/Setback (4110) 0 Foundation Wall (4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date ® Drainage/Downspout (4040) ® Re -steel (4215) ® Plumbing Groundwork (4190) Approved to backfill Approved to place concrete or grout Approved to cover By Date By Date By Date Slab/Concrete Floor (4255) ® Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 10 Shear Walls (4245) Roof Sheathing (4220) 12 Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date I) j_7 'LZ �3 Mechanical Rough -in (4165) Gas Piping (4125) Fire/Draft Stops (4095) Approved Approved to release test Approved By Date 1 �7 'L By Date By / Date 16 By Interim Erosion Control (4370) A roved pp Date and Prior to scheduling a Framing inspection; ? Electrical, Plumbing & Mechanical Rough -in Fire/Draft Stop inspections must be signed- off and approved. IBC 109.3.4 17 By Framing (4120) Approved to insulate Date 1 } 7 98 By_jL Insulation (4150) Approved to install wallbw Date 1� d ZL 19 By Gypsum Wallboard Nailing (4130) Approved to install mud & tape �? „41 Date 1� (J f �( 2U �By Suspended Ceiling Grid (4265) Approved to drop the Date 21 By Final - S K F & R (4060) Approved Date 22 By Final - Planning Approved Date 23 By Final Erosion Control (4375) Approved Date 24 By Final - Mechanical (4065) Approved ko Date 2-b11 1 0 23 By Final - Plumbing (4075) Approved Nr1 Date '111J,"10 2$ By Final - Building (4050) Approved Date 3&l Z3 Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date