Loading...
23-100903City of Federal Way FILF Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GOLDMAUR ESTATES LOT 60 Project Address: 32505 44TH AVE S Electrical Permit #:23-100903-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 282410 0600 Project Description: complete trim and hot check to get electrical final on house wired by others Owner Applicant Contractor GOLDMAUR LLC WILLIAM GENTELEGARNER ELECTRIC GARNER ELECTRIC WASHINGTON LLC 19655 1ST AVE S UNIT 204 LLC (01) NORMANDY PARK WA 98148 402 VALLEY AVE NW SUITE 106 GARNEEW864KB (5/2/24) PUYALLUP WA 98371 402 VALLEY AVE NW SUITE 106 PUYALLUP WA 980371 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 5 PERMIT EXPIRES Wednesday, 16 August, 2023 Permit Issued on Friday, February 17, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of s c fN Elf Federal Way. Owner or agent: Date: �'� Il a As. CRY W Federal Way THIS C:XRD IS TO R'.EAUUN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unstre about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date El Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved f > By Date By Date P -/ % P By Date El Final - Electrical (4055) By ? Approved Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING El Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date