Loading...
23-100906Electrical City of Federal Way Community Development Dept. Permit #• •23-100906-00-EL 33325 8th Ave S FILE Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GOLDMAUR ESTATES LOT 37 Project Address: 32539 44TH AVE S Parcel Number: 282410 0370 Project Description: complete trim and hot check to get electrical final on house wired by others Owner Applicant Contractor GOLDMAUR LLC WILLIAM GENTELEGARNER ELECTRIC GARNER ELECTRIC WASHINGTON LLC 19655 1STAVES UNIT 204 LLC (01) NORMANDY PARK WA 98148 402 VALLEY AVE NW SUITE 106 GARNEEW864KB (5/2/24) PUYALLUP WA 98371 402 VALLEY AVE NW SUITE 106 PUYALLUP WA 980371 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 5 PERMIT EXPIRES Wednesday, 16 August, 2023 Permit Issued on Friday, February 17, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of N e t �f_Federal Way. Owner or agent: Date: ;'VA r. 4 cirr of Federal Way THIS C 4RD IS TO REAL -IN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE TIIIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate_ Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) 0 Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) 0 Senzce (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Bv Date By Date By Date 1 D Final - Electrical (4055) By49f� pproved Date J MECHANICAL El Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING t❑ Plumbing Groundwork (4190)❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date