Loading...
23-100616City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 99003 Ph: (253) 835-2607 Fax: (253) 835-2609 Mechanical - Permit #:23-100616-00-ME Y Inspection Request Line: (253) 835-3050 Project Name: MUIRHEAD FAMILY TRUST Project Address: 32743 6TH AVE SW Project Description: Install heat pump to existing gas furnace Parcel Number: 926491 0780 Owner Applicant Contractor MUIRHEAD FAMILY TRUST AMANDA WEBSTERMERCURIO'S MERCURIO'S HEATING & A/C 32743 6TH AVE SW HEATING & A/C (GENERAL) FEDERAL WAY WA 98023 4001 S UNION AVE MERCUHC783CA(2/11/24 TACOMA WA 98409 4001 S UNION AVE UNIT B TACOMA WA 98409 Additional Permit Information Mechanical Work Valuation? .................................. 3000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Air Handling Units 1 PERMIT EXPIRES Saturday, 5 August, 2023 Permit Issued on Monday, February 6, 2023• I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W hi n a he of Federal Way. Owner or agent: Date crtr or Federal Way THIS CARD IS TO REAL - IN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-30-50 Scheduled inspections mad- be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LTFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Sen-ice (4235) Approved Approved Approved By Date By Date By Date El Feeders/Sub-panels (4045) i3 Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) By J Approved Date By Approved to release test Date By -go— Approved Date ►o �� PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date