Loading...
23-100785City of Federal Way FILL Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MEYER Project Address: 31802 24TH AVE SW Project Description: 80 Gas furnace replacement add heat pump Mechanical Permit 4:23-100785-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 193840 0120 Owner Applicant Contractor DEBORAH MEYER AMANDA WEBSTERMERCURIO'S MERCURIO'S HEATING & A/C 31802 24TH AVE SW HEATING & A/C (GENERAL) FEDERAL WAY WA 4001 S UNION AVE MERCUHC783CA(2/1 l/24 98023-2248 TACOMA WA 98409 4001 S UNION AVE UNIT B TACOMA WA 98409 Additional Permit Information Mechanical Work Valuation? .................................. 4000 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Saturday, 12 August, 2023 Permit Issued on Monday, February 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: _ Date: G CITY or 4A Federal Way THIS CXRD IS TO RE'LUN, O\-SITE Construction Inspection Record INSPECTION REQUE-'TS: (2;:) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS (?,RD. inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. Work nittst not be coffered until it is approved. Checkwith your inspector if you are unsure about an,..- of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ By Temporary Pourer (4275) Approved Date ❑ BV Service (4235) Approved Date El Pool Bonding (4195) Approved By Date ❑ Feeders/Sub-panels (4045) E] Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date B's Date By Date El Final - Electrical (4055) Approved By Date MECHANICAL ❑ 'Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final —Mechanical (4065) Approved A ppro% ed to release test roved By Date By Date By Date N�' PLUMBING t❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date