Re: File #14-105930-00-pC, PREAPPLICATION CONFERENCE SUMMARY
Quality Inn Suites Addition, 1400 S. 348th St., Federal Way
Dear Mr. Duhra:
FILE
CfTY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. c/tYofiederalway. com
Thank you for participating in the preapplication conference with the City of Federal Review Committee (DRC) held December 1 ], 2014. We hope that the information discussed
meeting was helpful in understanding the general requirements for our r WayDevelopment
at that
This letter summarizes comments given to you at the meetingb y project as submitted.
Who reviewed your project and provided comments include staff from the Ci
Divisions and Public Works Department, and re resen y the members of the DRC. The members
King hire and Rescue. Some sections of the federal Way Revised � n U ilitPlaDistrict
and Building
p tatZves train Lakehaven Utility District and South
handouts are enclosed with this letter. Please be advised, this letter does not re rese
aa'� �'WRC} and relevant information
codes. In Preparing your formal application, please refer to the complete F p nt alI applicable
for all additional requirements that may apply to your project. p Ve RC and other relevant codes
The key contact for your project is Matdlew Herrera, 253-835-2638, matt.herrer att.herrera@citYoffederalway.com.
specific technical questions about your project, please contact the appropriate D
listed below. Otherwise, an� tYo�ederalway.com.
y general questions about the preapplicatiaii and eRC representative as
referred to your key contact.
perm fitting process can be
PROJECT DESCRIPTION
Addition to existing motel
DEPARTMENT COMMENTS
Outlined below are the comments made by the representatives of each department re
the
conference. Each section should be read thoroughly. If you have questions
the representative listed for that section. present at the
please contact
PLANNING DIvISION (Matthew Herrera, 253-835-26389 matt.herrera nnc# of#eder
1. Zoning Designation and Use — alwa .cvm
Hotel and Motel uses are e The subject property e designated Commercial Enterprise (CE).
19.240.090. Permitted within the CE zone pursuant to Use Zone Chart FWRC
2- Use Application —A Process II Master Land Use application will be required for the addition if the
Proposal is for 12,000 square feet of gross Ilaor area or Iess. A Process III Master Land Use
application with environmental checklist will be required if the proposal exceeds 12,000 sq
uare feet
Mr. Duhra
Page 2
December 19, 201.4
of new gross flo
or area. These use appiication requirements tantia correspond improvements ovements a d major improvements
improvements and additions to developed sites for subs
(FWRC 19.15.030). as you
I2 ppp square feet. x'Ise Process Al informa iosan to more
IVleetingfollohv-up: I have included a submittal checklist for a Process �'I application 'acren
mentioned the additionz would be less t will be a Iicable if the scope of the Pr°1 ect a
environmental review item {see below) pp
than 12,000sf
Review — An environmental checklist and thresh 2 000 square feet will be
required i
3, Environmental Re Act SEPA} rules
the addition exceeds the ciretation Al2-01} Pursuant t State E" ronmentand uP01rCY se or t (SF'PA) permit
14.15.0300)(c) and Interp
(WAC 197-11-070), a threshold determination must be issued prior to any
utilizes the optional DNS process which integrates the res requirements
ni a reduced
the
decisions. The city qualify for the
Master Land Use application and anticipated threshold Beete te veers in the checklist to q fY
administrative review time. Be sure to provide comp
integrated notice period.
application (proposal 12,000sf or less} requires no PubndA4-day
4. Public Notice l A Process p sap eater than 12,000sf) will require a notice of applicationIVfirror and
Process IIi application (proposal it published be in the Federal Way
A mailed notice to all
comment period. The notice soli d toffi hG al notice boards within the city.A �e threshold
posted at the subject property roe is also required threshold
o s for
Property owners within 300 feet of the subject p p �Yet Of stamped mailing op
e s
es
The applicant is responsible for submitting he c ty'sGi$ Division can provide this
all property owners within 300 feet of the subject property.
service for a nominal fee_ applicant is
e is within a 5-year Wellhead protection Zone. The
5. Critical Areas The subject property Statement (enclosed} that discloses the oduced,
required to subinit a Hazardous Materials Inventory
' ate uantities of hazardous materials that wiactivity.' bandied, treated, used, p
approximate q.
recycled, or disposed of in connection with the proposedbuilding requires the
conforming Development — An expansion of gross floor area a an existing g �
6' Non with all development regulations in effect at the time the expansion is proposed
applicant to comply aspect, structure, or improvement on the site today that
(pWRC 19.30.090(1)(a}(i)}.Therefore, any Pformance as a orient of your expansion
does not meet current codes he s be plan andicodesthat ve been updated ed need to initial e building
project. A cursory review of P regulation wil
construction indicate compliance with tine city's tree canopy g Is 'Iota com)
this requirement is in item #1 Q. Please be ado dud n asiteislap rev eve Use P ocelss is o
Discussion of q
site conditions. An addibeiaddressed f or o to a11v as found
aovais.
a lication will need t�
7, Bulk Limitations
—The list below provides bulk limitations r the proposed redevelopment (FWRC
fo
19.240.090):
a. Setbacks — 5ft front, 5ft side, and 5ft rear E maximum is permitted outright.
b He — 45ft above average building elevation (AB )
to build up to 55ft. and 4 floors are possible per the special re;ulation set forth in
opportunitiesn r�
I:VTi]C 19_240,090(2). Doc LD. 67306
14-105930
Mr. Duhra
Page 3
December 19, 2014
c. Lot Coverage — No maximum lot coverage is established.
8. Community Design Guidelines — The proposed addition is subject to an administrative design review
as a component of the Use Process application_ Expansion of existing developments must meet those
provisions reasonably related and applicable to the area of expansion (FWRC 19 1 I5.030). The
following items reflect this provision; however, be advised the site plan submitted for preapplication
review is limited and additional design guidelines may need to be implemented fallowing review of a
complete application with thorough design plans.
a. The Community Design Guidelines instruct project designers to strive for overall design continuity
by using similar elements throughout the project, such as architectural style and features,
materials, colors, and textures (FWRC 19.1 I5.050(1)(d). Therefore, the addition shall reflect the
character of the existing building.
b• Implementation of Crime Prevention Through Environmental Design (CPTED) principles
(natural surveillance, access control, and ownership) must be incorporated into the design of the
addition_ Please thoroughly review the enclosed CPTED checklist for conformance. Tile checklist
must be completed and submitted with the land use application.
9. Parking —One (1) parking space per room is required. The existing and proposed addition will be
required to reflect this regulation. Up to 25 percent of the spaces may designate
shown in the enclosed Parkilag Lot Design Criteria bulletin, d as `compact' as
10. Landscaping —Any modifications to the landscape areas will require a landscape plan prepared by a
Washington State Iicensed landscape architect submitted with the formal application. Please follow
general guidelines outlined in FWRC 19.125.040(l) through (26) when preparing the site plan and
Planting schedule. The following regulations are specific to your proposal:
a- Landscape Islands — During the meeting you had mentioned that existing landscape islands
would be altered or removed to accommodate additional parking capacity. When proposing
changes be aware that 22 square feet of internal parking lot landscaping (Perimeter landscaping
does not count toward this requirement) must be provided for each parking space (FWRC
19.125.070(2), Dimensional requirements for the islands can be found in FWRC 19.125.070(3).
b. Tree RetelztiOnlReplacenzent — The city's tree canopy standards (FWRC 19.120.130) require
properties within the CE zone provide 20 tree units per acre. A tree unit is a score assessed to
existing trees depending on their size (see table 19.120.130-2). As a component of your land use
application, a tree survey prepared by a certified arborist or registered landscape architect
identifying the existing trees an the site and their corresponding tree unit score must be submitted.
Additional trees in the amount indicated in FWRC 19.I20.130(5)( a will need to be planted if the
existing tree unit score is below 20 tree units per acre. )
11. Application Fees & Submittal — Please contact the Permit Center at 253-835-2607 for updated fee
schedules for the Process II or Process III Master Land Use application, SEPA checklist, concurrent ,
engineering review, and building permit. Addition""' please contact the Permit Center to schedule an
appointment to submit your land use application checklist will be required. if a Process III application and environmental
14-105930
Doe, I. D. 67306
Mr. Duhra
Page 4
December 19, 2014
PUBLIC WoRms DEVELOPMENT SERVICES DIVISION (Ann Dower, 253-835-2732,
ann.dower@cityoffederalway.com)
Land Use Issues — Storrrcwater
ired per the
Surface water runoff -control and water quality treatment of Federalbe uWay Addendumto the 2009King 2
ty
1 CSWDM) and the ty
Surface Water^ Design 1lrlaraa�al (K requirements for a Full Drainage Review_ At the time of land use
KCSWDM. This project r�seets the addressin the relevance of the
site plan submittal, a preliminary Technical Information Report (TIR), g
project to the eight core and five special requirements of heK ISWDM will be required. A Level i
pr J
downstream analysis shall also be provided in the preliminary
the
The project lies within a CR.
onservation flow control Barea,
t 1 lanasementpplicant must design the Practices (BMP's)) will be w
2 p
control facility to meet this performance criteria.
required as..outlined in the KCSWDM.
project lies within an Enhanced Basic Water Quality Area. all be designed to meet thetreatment
square f net
3. Thep
or more of new impervious area, Water Quality Treatxnen
criteria of the Enhanced Basic Water Quality Menu.
Sect
on
In addition to the KCSVJDM, our initial review �suggestslaly t ��5i e Spie� fic 3y, the following
"Nonconforming Water Quality Improvement Y P
items may be applicable:
which involves the creation or addition of impervious surfaces having an area of
l.a. Redevelopment
5,000 square feet or more;
Lb
. Redevelopment which involves the construction or replacement hich involves the footprint
p other a
structure Having a surface area of 5,000 square�fu�or �t of,surface area or more;
building footprint or ocher structure b , q
re
i.e. Redevelopment which involves the repair or replacement of aorout00e maintenancequare feet oactivityof an
impervious surface, When such redevelopment is no p
rnent which involves the collection andlor concentration of surface and/or stormwater
1.d. Redevelop
runoff from a drainage area of 5,000 square feet or more',
ut
other than normal maintenance or other than the
month period emwhich exceeds 50
l.g Redevelopment,gross floor area, in any one consecutive
including any increase in
sisal must
percent octu
f the assessed or appraised value pro
vide i n a npraisal of the of
The app improvement
being redeveloped. The applicant may prov Pp
be from a source acceptable to the City. The Director may requif ire the applicant ion P eaQs to be
appraisal from a second source acceptable to the City
raisalshprovided by the e assessed applicant or required by the
inaccurate or inappropriate. If more than one app
the greater of the two amounts shall be used. For purposes
19 �� 91D determining
non onfoi Wing n under this
City, g
section, improvements required pursuant to FWRC Secttion
development), 19.30.110 (street/sidewalk improvements), 19.30.120 (nonconforming water quality
p
Dw. LD. 67306
14-105930
Mr. Duhra
Page 5
December 19, 2014
improvements) and 19.135.030 (street/sidewalk improvements) shall not be counted towards the 50
Percent threshold which would trigger application of this subsection;
Therefore, if applicable, water quality treatment will be required for the entire site, including new and
existing pollution generating impervious surfaces. Treatment options must be Selected from the
Enhanced Basic Water Quality Menu provided in the KCSWDM,
4. If infiltration is proposed, soil Iogs prepared by a licensed geotechnical engineer or septic designer
must be provided to verify infiltration suitability.
5. Detention and water quality facilities must be above ground (i.e. open pond). Underground facilities
are allowed only with approval from the City of Federal Way Stormwater Management Division.
6. Show the proposed location and dimensions of the detention and water quality facilities on the
preliminary plans.
7. If more than one acre will be disturbed during construction, a National Pollutant Discharge
Elimination System (NPDES) permit may be required. Information regarding this permit can be
obtained from the Washington State Department of Ecology at
htt :Ilwww.ec .wa. ovl ro aim Al teal ac/index.htmf or by calling 360-407-6437.
Right -of -Way Improvements
1. See the Traffic Division comments from Erik Preston, Senior Traffic Engineer, for- traffic related
items.
2. If dedication of additional right-of-way is required to install street frontage improvements, the
dedication shall be conveyed to the City through a statutory warranty deed. The dedicated area must
have clear title prior to recording.
3. All stormwater treatment and detention requirements outlined above will be applied to new
impervious area within the public right-of-way.
Building Permit Issues
1. Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be
reviewed and approved by the City. Engineering review fees are currently $824.50 for the first 12
hours of review, and $68.00 per hour for additional review time. A final TIR shall be prepared for the
project and submitted with the engineering plans. Both the TIR and the plans will require the
signature/seal of a professional engineer registered/Iicensed in the State of Washington.
2. In addition to engineering approval, short plats and subdivisions are required to obtain a separate
permit for grading. Details and fees may be obtained from the Federal Way Building Department.
3. The Federal WQY Development Standards Mamzzral (including standard detail drawings, standard
notes, and engineering checklists) is available on the City's website at www.ci offederalwa .com to
assist the. applicant's engineer in preparing the plans and TIR.
4. The applicant shall provide a geotechnical report that addresses design pavement thickness for the
roadways.
14-105930
Doc. LD. 67306
Mr. Duhra
Page 6
December 19, 2014
5. Banding is required for all street irnprovemSan �� 2� P �rcenot ���� � sediment
er�a �d posts of theeasures
associated with the project. The bond amountpossible
improvements. An administrative fee deposit will need to accompany the bond to cover any p
tion of the installation of tile
legal fees in the event the bond must the Public Works inspe called. Upon ector, the bond will be reduced to 30
improvements, and final approval of maintenance period.
percent of the original amount and held for a two-year
6. The developer will be responsible for the maintenance during the two-year maintenance period.e
detention and water quality facilities) and streetsystems
During that time, the Public Works Inspector l make requirements. ilpanperiodic ksits to the site to ensure the
satisfactory completion of the twa-
developer's compliance with the maintenance
year maintenance period, the .remainder of ththe resbond llbe released. ons'sbility of heaCity. Maintenance forprivate
and subdivision drainage facilities then becomeP
roads and drainage facilities, including short plats, remain the responsibility of the individual property
owners.
he
um
k shall
7. When topographic survey information is�sha UM K C A ,n on the, plans, t on all vertical
elevations
the phrase "DATUM: N.GN-D.-29 or "DATUM:
are called out.
8. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. All final
approved drawings shall be drafted/plotted
scale f l "x 320'aor la'rger4Architectu a1 scale permanent
arn
• black ink : Site plans shall be drawn at
permitted on engineering plans.
9. Provide .cut and fill quantities on the clearing and grading plan- Erosion control measures, per
Appendix D, 2009 KCSWDM, must be shown on the engineering plans.
10. The site plan shall show the location of any existing and proposed utilities in the areas affected by
construction.
PUBLIC WORKS TRAFFIC DIVISION
(Erik Preston, PE, 253-835-2744, erik. reston citvoffederalwa .coin
Transportation Coneurrency Analysis (FWRC 19.90)
ation
l . Based on the submitted materials for�24ad additional use code 310 (Hot l)l units, the , the propose of ed project is
Engineers (ITE) Trip Generation S Edition,
estimated to. generate approximately 14 new d eekdaye opo k hour
development.ri.Allmatively, the applicant
may submit a site specific trip generation stu y P
2, A concurrency permit is required far this development
project. Texis s dur g t3�e weekda PM peal-,
raffic Division will
concurrency analysis to determine if adequate Ycapacity
period to accommodate the proposed gybe required d if the proposed project creates anpment. Please note that supplemental impact not
analysis and concurrency mitigation may q
anticipated in the six -year Transportation Improvement Plan (TIP); as such, PW Traffic Division staff
recommends completing this step soon.
Doc. 1.D. 67306
14-105930
Mr. Duhra
Page 7
December 19, 2014
3. The estimated fee for the concurrency permit application is $I,584.50 (I I - 50 Trips). This fee is an
estimate and based on the materials submitted for the pre -application meeting. The concurrency
applicant fee must be paid in full at the time the concurrency permit application is submitted with
land use application. The fee may change based on the new weekday PM peak hour trips as identified
in the concurrency trip generation. The applicant has the option of having an independent traffic
engineer prepare the concurrency analysis consistent with City procedures; however, the fee remains
the same.
Transportation Impact Fees (TM (FWRC 19.91)
Based on the submitted materials for 24 additional hotel units, the estimated traffic impact fee is
S51,357,32. Please note, the actual impact fee will be calculated based on the fee schedule in effect at the
tune a -building permit application is filed and must be paid prior to permit issuance.
BUILDING DIVISION (Scott Sproul, 253-835-2633, Scott -sprout cityoffederalwa .cnm
International Building Code (IBC), 2012
Washington State Amendments WAC 51-50
International Mechanical Code (IMC), 2012
Washington State Amendments WAC 51-52
Uniform Ph'Inhing Code (UPC), 2012
Washington State Amendments WAC 51-56 & WAC 51-57
International Fire Code (IFC), 2012
Washington State Amendments WAC 51 -54
National Electric Code (NEC), 2012
Accessibility Code, ICC/ANSI Al 17.1 - 2009
International Residential Code, 2012
Washington State Amendments WAC 51-51
Washington State Energy Code, 2012 WAC 5 1 -11
Building Criteria
Occupancy Classification: R-2
Type of Construction: not provided
Floor Area: not provided
Number of Stories: not provided
Fire Protection: required
Wind/Seismic: Basic wind speed 85 Mph, Exposure, 25# Snow load, Seismic Zone D-1
A complete building permit application and commercial checklist. (Additional copies of application and
checklists may be obtained on our web site at wvVw.ci offederalwa .corn.)
14-105930
Doc. LD. 67306
Mr. Duhra
Page 8
December 19, 2014
Submit S sets of drawings and specifications. Specifications shall include: x_ Soils report, x_
Structural calculations, and _x_ Energy calculations, x `]entilation calculations. Note: A Washington
State Registered architects' stamp is required for additions/alterations (new or existing) of 4,400 gross
floor area or greater unless specifically listed as an "exempt" structure per the Revised Code of
Washington (RCW).
ired to be completed and included with your permit
Energy code compliance worksheets are requ
application.
A wet stamp and signature is required on all sheets of plans and on the cover page of any calculations
submitted.
Federal Way reviews plans on a first in, first out basis; however, there are some small projects with
inconsequential review requirements that may be reviewed out of order.
Third party structural review could be required for this project. This is an added cost in addition to
building permit fees.
Review Timing
be expected widnin seven weeks of submittal date. Re -check of plans will
The first comment letter can
occur in one to three weeks after re -submittal.
Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally
submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response,
what changes have been made from theoiginal drawl Develpment Plans for all involved departments will be
forwarded from the Department of Co h'
Other Permits & Inspections
Separate permits may be required for electrical, mechanical, plumbing, fire suppression systems, and
signs. Applicants may apply for separate permits at any time prior to commencement of construction.
When required, special inspections shall be performed by WABO approved agencies or by agencies
approved by the building official prior to permit issuance. Construction must be approved by all
reviewing departments prior to final building division inspection.
All concerned departments (Planning, Public Works, Electrical, & Fire) must sign off before the Building
cture for occupancy. Building final must be approved prior to the issuance of
Department can final the stru
a Certificate of occupancy.
All construction projects may be required to have a pre -construction conference, if a pre -con meeting is
required, the general or representative, all subs, the architect or representative, the engineer or
representative, electrical contractor and any other interested party, should attend this meeting. Meetings
will occur at the Building Department and will be scheduled by the inspector of record for the project.
Site -Specific Requirements
i. Plumbing and mechanical shall be included in the building pennit submittal.
2. Electrical is a separate submittal and application.
Doc LD 67306
14-105930
Mr. Duhra
Page 9
December 19, 2014
3. 3403. L Additions to any building or structure shall comply with the requirements of this code for
new construction. Alterations to the existing building or structure shall be made to ensure that the
existing building or structure together with the addition are no less conforming with the provisions of
this code than the existing building or structure was prior to the addition. An existing building
together with its additions shall comply with the height and area provisions of Chapter 5.
4. 3403.3 Existing structural elements carrying gravity Ioad. Any existing gravity load -carrying
structural element for which an addition and its related alterations. cause an increase in design gravity
load of more than 5 percent shall be strengthened, supplemented, replaced or otherwise altered as
needed to carry the increased gravity load required by this code for new structures. Any existing
gravity load -carrying structural element whose gravity load -carrying capacity is decreased shall be
considered an altered element subject to the requirements of Section 3404.3. Any existing element
that will forth part of the lateral load path for any part of the addition shall be considered an existing
lateral load -carrying structural element subject to the requirements of Section 3403.4.
5. 3403.4 Existing structural elements carrying lateral load. Where the addition is structurally
independent of the existing structure, existing Iateral load -carrying structural elements shall be
Permitted to remain unaltered. Where the addition is not structurally independent of the existing
structure, the existing structure and its addition acting together as a single structure shall be shown to
meet the requirements of Sections 1609 and 1613.
6. 3404.6 Smoke alarms. Individual sleeping units and individual dwelling units in Group R and I-1
occupancies shall be'provided with smoke alarms in accordance with Section 1103.8 of the
International Fire Code.
7. 3411.8.7 Accessible dwelling or sleeping units_ Where Group I-1, I-2, I-3, R-1, R-2 or R-4 dwelling
or sleeping units are being altered or added, the requirements of Section 1107 for accessible units
apply only to the quantity of spaces being altered or added.
8. 3411.8.8 Type A dwelling or sleeping units Where more than 20 Group R-2 dwelling or sleeping
units are being altered or added, the requirements of Section 1107 for Type A units apply only to the
quantity of the spaces being altered or added.
9. 3411.8.9 Type B dwelling or sleeping units. Where four or more Group 1-1, I-2, R-1, R-2, R-3 or R-4
dwelling or sleeping units are being added, the requirements of Section 1107 for Type B uniy
only to the quantity of the spaces being added. Where Group I-1, I-2, R-1, R_2, R-3 or R-4 dwelling ts appl
or sleeping units are being altered and where the work area is greater than 50 percent of the aggregate
area of the building, the requirements of Section 1107 for Type B units apply only to the quantity of
the spaces being altered.
The information provided is based on limited plans and information. The comments provided are
not intended to be a complete plan review and further comments are possible at time of building
permit plan review.
LAKEHAVEN UTILITY DISTRICT (Brian Asbury, 253-946-5407, BAsbury@lakehaven.org)
Water
• The site has the following existing water service connections:
■ Domestic/Commercial: Two (2), 2" services/meters (SN 32743 & 32744/32743C1).
■ Irrigation: One (1), 1%2" service/meter (SN 32745).
Fire Protection: One (1), 8" service with 5/8"x3/4" flow -detection -only meter (SN 32746).
■ The existing domestic/commercial meters may not be suffiiciently sized to include the proposed
building addition and may need to be evaluated to determine if they're adequate for the proposed new
total use. Contact Lakehaven for additional information.
14-105930
Doc, I.D. 67306
Mr. Duhra
Page 10
December 19, 2014
ified water service connectionimeter(s) required, collection of additional Water Capital
If new or mod
Facilities Charges will be applicable; collection of additional Sewer e 23 Ol Equivalent Residential s
be
applicable. Current water system capacity credits for the property
Units (ERU). Service records for the property for 2013 indicate a usage level of 40.16 Water ERid. If
new or modified water service connectionlmetea is
Facilities Chargeis s foruthe existate to Olg use, and not
$;629/ERU) $62,273.64 of additional Water Capital
including additional charges applicable for the proposed new use. The use of system capacity above
that credited to the property is currently addressed through Capacity Rental (CapRent) charges
included with each two -month service bill, and will continue unless additional system capacity credit
is purchased. prevention assembly (BPA) adjacent to
Installation & satisfactory testing of an approved backflow
each domestic service meter is required pursuantcheck valve lvve assembly (DCVA) or a reducednpress a
uble sure
low cross -connection hazard, either a do
Lakehaven's Cross -Connection Control Program
backflow assembly (RPBA) is required. Contact Lake
e it Lakehaven.or 253-946-5427} for additional information & $PA
Manager (Chris Zoepfl, C2o
testing coordination.
Sewer
The site has one (1) existing sewer service connection (SSCP 23692).
• if new or modified sewer service connectioncollection of additional Water Capital Facilities Charges mllection of additional Sewer Capital aybe
Facilities Charges will be applicable; co are 19.54 ER11.5ervice records for
applicable. Current sewer system capacity credits for the property
the property for 2013 indicate a usage level of445 chedule5 Sewer E$32a6/ERU) $8Q 82RU. If new or 3.26 of additional
connection is required, this would equate to ed sewer- service
(2
Charges for the existinge, l
appli
ud
Sewer Capital Facilities hat credited toing ithe property itional s currently
for the proposed new use. The use of system capacity above t
addressed through Capacity Rental (CapRent) chargg e i iswith each two -month service bill, and
will continue unless additional system capacity c purchased.
General
• Utility conflicts should be identified and coordination ncroach ent with exist ng rLakeha en fac lities and
planning process. Project will need to applicable)scape requirements (if may conflict with existing
easement(s). New site bans and if sameter downer should coordinate any required revisions with the City
easement terms & conditions,
and Lakehaven early in the grilplanning phase to avo
rhedelays
proposal(s} submitted and development.
All comments herein are valid for one (1) year and are based
Lakehaven's current regulations and policies.
[eAn he an $toommener ts accordingly.ddevelopment
prOpasai(s) or
Lakehaven's regulations and policies may
Faranda, 253-946-7244, wince.faranda@southkingfire.org)
SOUTH KING FIRE AND RESCUE (Vince
Fire -Extinguishing Systems
• An automatic fire sprinkler system is required.
A separate .permit is required for the installation of the Fire Sprinkler System. Contact the Fire
•Marshal's Office at (253) 946-7242 for Fire Sprinkler System Specifications.
Doc. I-D. 67306
14-105930
Mr. Duhra
Page 11
December 19, 2014
Fire Alarm System
+ Extending the automatic fire detection system shall be required for the common areas.
* A separate permit is required for the installation of the Fire Alarm System. Contact the Fire Marshal's
Office at (253) 946-7242 for Fire Alarm Specifications.
CLOSING
This letter reflects the information provided at the preapplication meeting and is intended to assist you in
preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the City'
s
review of the formal application. The completion of the preapplication process in the content of this letter
does not vest any future project application. Comments in this letter are only valid for one year as per
FWRC 19.40.070. (4).
As you know, this is a preliminary review only and does not take the place of the full review that will
follow submission of a formal application. Comments provided in this letter are based on preapplication
materials submitted.
Modifications and revisions to the project as presented for this preapplication may influence and modify
information regarding development requirements outlined above. In addition to this preapplication letter,
Please examine the complete FWRC and other relevant codes carefully. Requirements that are found in
the codes that are not addressed in this letter are still required for your project.
If you have questions about an individual comment, please contact the appropriate department
representative noted above. Any general questions can be directed towards the key project contact,
Matthew Herrera, 253-835-2638. We look forward to working with you.
Sincerely,
Matthew Herrera, AICP
Senior Planner
enc: Bulletin 003 Master Land Use Application
Bulletin 021 OPTED Instructions
Bulletin 022 CPTED Checklist
Bulletin 041 Accessible Parting
Bulletin 042 Parking Lot Design Criteria
-Bulletin 054 Submittal Requirements for process Il
Bulletin 056 Hazardous Materials Inventory Statement
c: Avtar Singh Duhra, 1400 S. 348`h St., Federal Way, WA 98003
Ann Dower, Senior Engineering Plans Reviewer
Erik Preston, Senior Traffic Engineer
Scott Sprout, Assistant Building Official
Vince Faranda, South King Fire & Rescue
.Brian Asbury, Lakehaven Utility District
14-105930
Doc I.D. 67306
8897000005
34434
8897000085
2021049064 34603
348D0
sa"Coom-
34811
32743
F. Frf
�20
2021049WB r
347M F y
' - sas�onaos�
s" I 34827
Prop.
F
{,'/off ! ;• / r;.. Bldg.
r Add'n
8897000090
34703
8897000095
34713
2D2104MM
1330 2021049021 2n210490aS
1406 14i8
1508
xire: QUALITY INN SUITES (74-705930-00-PC)
"^ warrants nor 7uafart
the am,,W of any 5}i
lulu! q�J $rrra[ar pm%Wed. Faj:i[y 0
F. - Dijr--s aDd aandiisons ar_ 100 200
111j1y f�' fRK E',tto &Ad+eti6ra5on.
Fee:
CITY OF
Federai way�-CITY HALL FILE
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. cityofi ederalway.. com
November 20, 2014
Avtar Singh Duhra
3223 South 133rd Street
Tukwila, WA 99168
RE: File #14-105930-00-PC; NOTICE OF PREAPPLICATION CONFERENCE
Quality Inn Suites,1400 South 348th Street, Federal Way
Dear Mr. Duhra:
The Community Development Department is in receipt of your preapplication conference request. The
application has been routed to members of the Development Review Committee and the meeting has been
scheduled as follows:
9:00 a.m. — Thursday, December 11, 2014
Hylebos Conference Room
Federal Way City Hall, 2nd Floor
33325 8d' Avenue South
Federal Way, WA 98003
We look forward to meeting with you. Please coordinate directly with anyone else you would like to
attend the meeting as this will be the only notice sent by the department. If you have any questions
regarding the meeting, please contact me at matt.herrera ci of#ederaiwa .coin, or 253-83 5-263 8.
Sincerely,
Matthew Herrera, AICP
Senior Planner
a Avtar Singh Duhra, 1400 S. 348th St., Federal Way, WA 98003
Doc. CD. 67307
CITY OF FEDERAL WAY
DEPARTMENT OF COMMUNITY DEVELOPMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: November 17, 2014
TO: Ann Dower, Development Services
Rick Perez, Traffic
Scott Sproul, Building
Brian Asbury, Lakehaven Utility District
Chris Ingham, South King Fire & Rescue
FROM: Matt Herrera — Planning Division
FOR DRCMTG. ON: Thursday -December 4, 2014 - Internat Review
Thursday — December 11, 2014, 9:00am - with applicant
FILE NUMBER(s): 14-105930-00-PC
RELATED FILE NOS.: None
PROJECT NAME: QUALITY INN SUITES
PROJECTADDRESS: 1400 S 348TH ST
ZONING DISTRICT: CE
PROJECT DESCRIPTION: Proposal to construct addition for additional rooms to existing hotel
LAND USE PERMITS.
PROJECT CONTACT:
Preapplication conference
AVTAR SINGH DUHRA
1400 S. 348 h St.
Federal Way, WA 98003
avtarduhra c1 asnail.coin
206.290.9115
MATERIALS SUBMITTED: Site Plan
MASTER LAND USE APPLICATION
RECEIVED DEPAPTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 8`'Avcnue South
CITY OF Federal Way, WA 98003-6325
NOV 13 Z014 253-835-2607; Fax 253-835-2609
Federal Way CITY OF FEDERAL WAY ..,k,%v.cJtyofFederalway.couii
CDS
APPLICATION NO(s) _ J Date
Project Name _ %� D m b R J-22A z- 1 7;Z l / A -I N r I - LE
Property Address/Location d ® _rH 3 q ,(2�4
Parcel Number(i) O r 1,05S
Project Description �� —� &)4 l 7'
PIRASR PRINT
Type of Permit Required
-Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
_,ePreapplication Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
_ Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
_ Short Subdivision
v Subdivision
Variance: Commercial/Residential
Required Information
C-V�:- Zoning Designation
Comprehensive Plan Designation
Value of Existing Improvements
_ —Value of Proposed Improvements
International Building Code (IBC):
__Occupancy Type
Construction Type
Applicant
Name: V T A S t N G H 3)u H 2.4
Address: f Liao 5 o u pi, 3f E S T
City/State:
Zip: FED f-WA LW P`� 9��°3
Phone: 0 , 6 9 //_
Fax: 2 5 3S l 157 y�Ja l/ r C d 7►'l
Email: U �-a ,A
Signature'.
Agent (if differentthanApplicant)
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Owner
Name:
Address: yy, C
City/State: S
Zip:
Phone:
Fax:
Email:
Signature:
Bulletin #003 — January 1, 2011
Page 1 of 1
k:�Handouts\Master Land Use Application
CALL BEFORE YOU DIG -_
1-800-424-5555
T-20'
X
I
I
r
x
E
i
STRUCTURE LIST
I
RW�277_V
CB
R6YR O/�Q.+27sa3
R'.27dD.i(6• ELEOW7
rFe7711;B 1T• ADS NJ
I 26Rr�e GIPPED Reps J
=z67.T3(la.' rap r�
6.2AL r3(12: ADS SJ
Mara r7(Iz ADS fJ
E-T67. T cAa U
c8 �B
,;
T67, 78'CAPP S)
AYU-28794
IF-27631(l7-ADS W)
CB 02
r.276sNr6 PYc EJ
¢'-277.9fK1T • ADS NE)
�
,
-CMP E)
NE-26729r48• GYP SW)
PoM=283..73
E=27R.90(B" ADS E)
lE=279.6J(1; ADS S)
E-279.63(12• ADS N)
1
�{
ce to
.27y28
RW=282.60
1f=27x f99((12-CMS N)
E-2611 6• PVC N)
-
L+27129(12•ADS EJ
fE-28'30B(H-ADS W)
1
E-273,mr8- CUP WJ
TOP OF Or-=276.3E
COW
RMI-2-2B97.79
E-X81.29(12-ADS S)
RIM-2792I
-2B 1.69(8 AOS SE)
if=T73�6(12• ADS 5)
Es7B I.59(B" ADS E)
jam'
1f=27i46(1z•ADS I
I
HL.
CB
COW
RAY=28635
MAd=277.93
[-2Br,73(c-ADS EJ
IE-27.1a12•ADSWJ
[w.y77, f5(8• ADS W)
E-27J.6J(12� ADS NJ
� F284.76
•.
CW 05
IE=2624I(6- W/our)
RIM-277.63
1E=27s73(B nos wJ
YD 02
1E-27383(IZ•A05 EJ
RII I.B
�' 766I
E-282.3(6• NVIOUr)
If=271.01(8-ADS E)
___ _----------------------------------
I __
MODL
I
I
RETAI
-
-
AS -BUILT GRADING AND STORM DRAINAGE PLAN
----- --- ----- ----- - 1 Y3.lER CONNECTION POINT
.Ir
—� A
NEW EURIZED
nl"f
C'OfNO Y'.L ) w rl g .ir PIC
AMI
E v
65 / TWN POWs :II MAX
` x ND 1.0% MIN )
Atea
\• [�N MAX
J � ] ALL QCA"' T$ SHALLHAVE WATERTIGHT
' • ^ OS CONNECTgNj TO ROOF GRAIN COLLECTION
OS SYSTEM COORDINATE DOWNSPOUT LOCA
1 '• ;�-. _ _- WITH ARCHITECTURAL PLANS
• !r •�? �ti, ;` a A2Li' F
2e4.2 TY - >•- &_ � RODE oRAnT
,�jH,•,~ e ION
NEW CONCRETE WALK f CON RETE WALR
a )
BUILDING F.F. I
ELEV.=285.00
I
7e s
fib
I
�i...
•-
$
I I
��
J �
3et9
PR
ASPHALT_/,��
[a f9
E
31F ! •
.r -
PCR DETAIL SHT. C.
2ars
P 7
T92., TO
3n
a
7
SIXT
2 YNiI•t
DS
ESAj�
® i; Arel.•� 1 a REGRADED DITCH
In 1% MIN
- I J— BOTTYPOO OM ,-,D
i[C�i CHAIN PRpiLLTgN 1 w
- __- --PER YIETAE'• 8'!6'x,' - fzI �. .._
s I
IT �Evr z`>
sBc39�nr - raNl a' 'i � -•I _ �
I I ------- FUTURE _ _ ---- - - _ -. _ I• - FUTURE ADDITION
• 1 • mE! r f
#4 = I t I 3
2-3'... s I s
NEWASPI•IAL'C . 3 j
Iz• f+'Er ®Owzr �- � _ _ .,J •------.�_ N
�' - - I� V-G6s7`-�- - -:�_ - i.Lzsl� e= sPEp _ •-�"\I� - -CWia P� . = 1
�3 -
���-
r
4 �sAWcu eR 6 �irr�l
s
'•y -' T�ylr.u� i V .. � 5�6a L7•a HICdi MODULAR I
l ?O' EX 36- ACCESS Y
FOR WATER COHIIEctiou WITH LADDER EC�CK WA�L
POINT SEE $"W O 1T ;11. Ree No 3455904 y yrl _54
A:p
`•` (2) EX. 204 LF 96, CLIP I
`2 8" SS DETENTION IE=267.5 TWY^]
• r •• • ' EX EOrE OF 16 OI BL= WALL Y. . U" 7- r-
77.1y__ 11 773.3z ITT jIEEy=26775
A1r.T, rY •. '
File_ P:\DGOOO.\G?BG\engineering\6780asbl..dwg Dole/Time: D5/22/2OD2 10 239 Scale: 1=20 Leldridge rt f.: 7.6780-T,Z6,SO-S,Z6780ASB-B,ZE7804SE,
LEGBNQ
PROPOSED TYPE I CATCH BASIN
■
PROPOSED TYPE II CATCH BASIN
PROPOSED STORM PIPE
OOSIING TYPE I CATCH BASIN
11
EXISTING TYPE I CATCH BASIN
EXITING STORM LINE
PROPOSED SPOT ELEVATIONS
/
EXISTING CONTOURS
---1�--
EXISTING SANITARY SEWER MANHOLE
0
EXISTING SANITARY SEWER LINE
'-^ --rl-" —
EXISTING WATERMAIN
— __ • ,r' ._
DUSTING WATER VALVE
to
EXOSNNG TEE
�I
EXISTING FIRE HYDRANT
17
STUa6A90 PAYEYFM
PROPOSED CONCRETE
PROPOSED MODULAR BLOCK WALL
G
O
3 3
_
C5
F-
2 2 _8
m�00
Z QZj
5I1
x 'Gi
r�
W
mmaw
Z Z
0 Q ir
O
7 7 w
W W� R
R4¢ 7
II< Z =
in Q
V
jr
mmm ma
00000
$
tj 0 Q
j
Ww
% ai
J.
m
Nryoo
nee na
o
VOMAL DATUM - BASE OF ELEVATE
NATIONAL GEODETIC VERTICAL DATUM OF 1929
AS ADOPTED BY CITY OF FEDERAL WAY
PROJECT BENCHMARIC
TOP OF 2-1/2" IN PIPE IN MONUMENT CASE IN CERTERUNE OF PAC61C HIGHWAY SOUTH
(NEAR SW. COINER OF SITE) Mee.-i mfa:F
SITE BENCHOW
SET PK NAIL IN ASHPALT ROADWAY (17' z FROM N.W. CORNER SITE)
(SEE DRAWING) ELEY.-MA(3 FEET
WATER T1ON TVWT T VFAJ I M I
RD. FsMT. Ow.I �NoA.
Ex EDGE OF
; 11 PAVEMENT
• s.t � ErJ 2735E
SO
Rom.
f I
x f t
I tr RTC. k7• Tr02151O57
fJnTE
r
�1 f IE I
S I
• II
Ijjj I
IEj Jj
I II J
E TE ( i3
( jEjET
• I
M1' E I 1
k 1
�I■Al
It
Z
O
Qj EO
m Np
EO
iA C.)�
°a?
QZ3OD
2 Z
I_ co O
CL
c( )
O
CD
C)
LL
$
•��
e c i
LA
I
o u $
0
N �
c5
O N m22
n �
N'4 a0
w w
EX 8• Ss
�•.� A "may •�� --�r.. - r-I I- j��--y?(r1H}--- A �V1
ExP!HE...
� •- PFRuIf H[E DO-lpll$a-AqO-DO-YF
AS BU6T INVOl fIF ROM ON THIS PLAN IS CifY�
THC RESULT OF A MO St%Wrr PERFU MEO BY
YE 0� Vlrpi.P OaTCT�N
�2� �f NCX oo-ionsa
SlH1V� BATEE� CfIY OF FEDBiAL WAY
5/17102 ASBUILT-REVISIONS APP—
DATE:
x
V� f GDd
�E
•%rs lLo
�r894 L
O
E
X
C,