Loading...
23-100859City of Federal Way Community Development DepL 33325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WEATHERMAN Project Address: 33434 33RD PL SW Project Description: gas furnace replacement with ac add on Mechanical Permit 9:23-100859-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 954280 0650 Owner Applicant Contractor JUSTIN & CELESTE WEATHERMAN TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 3343433RD PL SW COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A 12811 PACIFIC HWY SW TACOMA WA 98499 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? .............:.................... 16286 is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Air Conditioners - Stand Alone 1 Furnaces 1 PERMIT EXPIRES Tuesday, 15 August, 2023 Permit Issued on Thursday, February 16, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Mton and the City of Federal Way. i Owner or agent: Date: r-1 vvuu� A�,- a crrr or Federal Way THIS CARD IS TO REAL -UN O\-SITE Construction Inspection Record I\SPEC'TION REQUESTS: (253) 335-3050 Scheduled inspections map be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295)❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165)❑ Gas Piping (4125)3❑ Final - Mechanical (4065) Approved Approved to release test Aop Approved By Date By Date ,/� / By Date _/V ' PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date