23-101235a , N.
City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax:(253) 835-2609
Project Name: THE WOODLANDS AT REDONDO CREEK LOT 59
Project Address: 30328 19TH AVE S
Project Description: NEW 100 AMP TEMP POLE
Electrical
Permit #:23-101235-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 952651 0590
Owner
Applicant
Contractor
SSHI LLC DBA D R HORTON
SHANNON CHELETTEPROVIDENT
PROVIDENT ELECTRIC INC (01)
11241 SLATER AVE NE SUITE 120
ELECTRIC INC
PROVIEI103C2 (2/22/24)
KIRKLAND WA 98033
17615 SE 252ND ST
PO BOX 7087
COVINGTON WA 98042
COVINGTON WA 98042
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Temp. Service: 61 - 100 amps I
PERMIT EXPIRES Monday, 4 September, 2023
Permit Issued on Wednesday, March 8, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
in t nl the Citv_.of. Federal Way.
Owner or agent: NE Date:
-4k
CITY Of
Federal Way
THIS CARD IS TO REAL-kIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S35-3050
Scheduled inspections niay be failed if this card is not on -site. DO NOT LOSE IBIS C k". Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
0
Ditch cover (4030)
El
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
Bv
Date
By
Date
By
Date
El
Pool Bonding (4195)
❑
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough. Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
o Final - Electrical (4055)
Approved
By
�%� Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
3❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
Q
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
Q
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date