22-104049Electrical
City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: THOMAS
Project Address: 31434 50TH AVE SW
Permit #:22-104049-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 189870 0130
Project Description: BLUEBEAM - PV Solar Roof Mount Installation, 2 Circuits, 8.88 kW, MPU
Owner
Applicant
Contractor
TIANA THOMAS
SOLGEN POWER LLC
SOLGEN POWER LLC
31434 50TH AVE SW
5715 BEDFORD ST
SOLGEPL830RJ (1/24/24)
FEDERAL WAY WA 98023-2007
PASCO WA 99301
5715 BEDFORD ST
PASCO WA 99301
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Electrical Futures
Circuits - Residential 2
CONDITIONS:
Fire conditions:
Upon completion of installation, the following photographs shall be emailed to review@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a
response back from SKFR once the permit has been approved by SKFR so you can schedule your
electrical final i
PERMIT EXPIRES Saturday, 29 April, 2023
Permit Issued on Monday, October 31, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
\NaEptl C ty of Federal Way -
Owner or agent: E. Date:
"1 '
-II:k
CITY OF
Federal Inlay
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
22 104049 00 Address: 31434 50TH AVE SW
TIANA THOMAS FEDERAL WAY WA 98023-2007
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
UFER Ground (4295)
0
Ditch cover (4030)
0
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
0
Pool Bonding (4195)
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0 Feeders/Sub-panels (4045)
® Rough Electrical (4225)
Q Final - S K F & R (4060)
Approved
Approved
Approved
By Date
By Date
By Date
1701 Ceiling Cover (4020) t Final - Electrical (4055)
Approved Approved
By Date By �� Date 11 �
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date