Loading...
23-100194City of Federal Way Community Development Dept 33325 Sth Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MOORE Project Address: 822 SW 313TH CT Electrical Permit #:23-100194-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 555990 0010 Project Description: BLUEBEAM - Installation of a 6.29 kW roof mounted solar system Owner Applicant Contractor LYNNE MOORE ALISHA TURPINARTISAN ELECTRIC INC ARTISAN ELECTRIC INC 822 SW 313TH CT 969 S NEBRASKA ST ARTISEI936L1 (6/24/23) FEDERAL WAY WA 98023 SEATTLE WA 98108 969 S NEBRASKA ST SEATTLE WA 98108 Additional Permit Information Is this an Online or O.T.C. application? .................. No Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml CONDITIONS: Fire conditions: Upon completion of installation, the following photographs shall be emailed to planreview@southkingfire.org and alarms@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least 2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business days, call 253-946-7348 to check status. PERMIT EXPIRES Sunday, 20 August, 2023 Permit Issued on Tuesday, February 21, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: �; pa.] CITY OF Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 100194 00 Address: 822 SW 313TH CT Project: LYNNE ROBERTA MOORE FEDERAL WAY WA 98023-4561 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 1❑ UFER Ground (4295) Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) Temporary Power (4275) Q Service (4235) Approved Approved Approved By Date By Date By Date E] Feeders/Sub-panels (4045) 0 Rough Electrical (4225) Q Final - S K F & R (4060) Approved Approved Approved By Date By Date By Date final - I-Icctrical (4055) Ceiling Cover (4020) Approved Approved By Date ✓I n By I Date / r Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date