Loading...
22-101387City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Sign Permit #:22-101387-00-SG Inspection Request Line: (253) 835-3050 Project Name: EQUITY TITLE OF WASHINGTON Project Address: 33455 6TH AVE S .✓ Parcel Number: 926500 0340 Project Description: BLUEBEAM - Installation of internally illuminated channel letter wall sign. Includes electrical connection. Owner Applicant Contractor EDIFICE INVESTORS LLC MARISA KETZEBACKPLUMB SIGNS INC PLUMB SIGNS INC (ELECTRICAL 04) 11286 LA MADRE RIDGE DR 909 S 28TH ST PLUMBS1077QS (11/10/23) LAS VEGAS NV 89135 TACOMA WA 98409 909 S 28TH ST TACOMA WA 98409 Additional Permit Information Comprehensive Plan Designation ........................... Office Park Zoning Designation................................................. OP PERMIT EXPIRES Monday, 23 January, 2023 Permit Issued on Wednesday, July 27, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will D&Lagp danEof the laws, rules and regulations of the State of Was o the Federal Way. Owner or agent: Date: / REPRINTED / MAR 13 7023 THIS CARD IS TO REMAIN ON -SITE CITY OF �� Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 101387 00 Address: 33455 6TH AVE S Unit 1-E Project: EDIFICE INVESTORS LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Cheek with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. F1 Footings/Setback (4110) Q Final - Electrical (4055) 0 Final - Sign (4085) Approved to place concrete lBy Date JIB . v ® Attachment (4010) Approved By Date Approved Approved Date By / z Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date