Loading...
23-100914Electrical City ofFedePermit #:23-100914-00-EL Community Developmentopment Dept, S8[h Ave S Federalal Way, WA 98003 FILE Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PIERCE Project Address: 300 S 296TH PL Parcel Number: 718300 0060 Project Description: Extend one circuit and add one circuit Owner Applicant Contractor DON PIERCE AMANDA MOOREFULLER ELECTRIC INC FULLER ELECTRIC (EL 01) 300 S 296TH PL 1220 S 356TH ST SUITE A-5 FULLEE1027BK (1/12/24) FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 37107 12TH AVE S SUITE A-5 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Circuits - Residential Electrical Fixtures AA PERMIT EXPIRES Sunday, 20 August, 2023 Permit Issued on Tuesday, February 21, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ]IVR 'ng and t C' deral Way. Owner or agent:- Date: Kj,� _N� CnT or Federal Way THIS CXRD IS TO RENLUN ON -SITE Construction Inspection Record I-SPECTIO\ REQUESTS: (253) 835-3050 Scheduled inspections =y be failed if this card is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. �T 0 By LIFER Ground (4295) Approved Date Q By Ditch cover (4030) Approved Date By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Approved Appm ed Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ED Final - Electrical (4055) By /Approved /,�Date,1���Q�/ MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) El Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 3❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date