Loading...
20-102489-Photometric Analysis-2020-06-01-V3NEW LUMINAIRE POLE NEW FIXTURE HEIGHT = 40' NEW ARM LENGTH = 16' NEW LAMP = 18OW LED NEW FIXTURE = ARCH—L AF72 NEW —w—w—w— � O,a�La o.a o _ 0.8 0.9 0-9-4 0.9 0.9 1 0 1.0 1.0 1.1 1 1.0 1.1 1.1 1 1.0 1.1-1. rl 0 1.1 1" 1 i\0 1.0� =-Z EX LUMINAIRE POLE NEW FIXTURE HEIGHT = 40' EX ARM LENGTH = 16' NEW LAMP = 180W LED NEW FIXTURE = ARCH—L AF72 NEW DI REVISION LA LU1V111V/1111L 1 vLL EX FIXTURE HEIGHT = 40' EX ARM LENGTH = 16' EX LAMP = 90W LED EX FIXTURE = ARCH—M AF48 EX 15 60 0 30 90 SCALE IN FEET NEW LUMINAIRE ON NEW SIGNAL POLE EX SIGNAL POLE ARM LENGTH = 16' EX LAMP = 18OW LED NEW FIXTURE = ARCH—L AF72 NEW TARGET CALCULATION SUMMARY ACTUAL DESIGN CRITERIA CALCULATION AVG. UNIFORMITY AREA MAINTAINED RATIO FOOT CANDLES AVG. FC/ (FC) MIN. FC 1.00 3.00:1 S 320TH ST. 1.36 2.27:1 S 320TH ST & 32ND AVE S 2.00 3.00:1 INTERSECTION 2.01 2.51:1 0.60 3.00:1 32ND AVE S 0.84 2.80:1 FO FROUF FO W= W _w-w-w-w_ w _w-w- DATE BY DESIGNED BY: ISSUE DATE: DRAWING NO.: DMA/PP 10-02-2020 19TENW Pape Group PAPE KENWORTH TRUCK FACILITY PC-01 DRAWN BY: JOB NO.: 355 Goodpasture Island Rd DMA/PP TENW #6011 Transportation Engineering NOrthWest Ste 300, Eugene, OR 97401 Transportation Planning I Design I Traffic Impact &Operations 541-334-3437 SHEET NO.: 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 1 Office (425) 889-6747 gclosson@pape.com APPROVED BY: DRAWING FILE NO.: OF CTB Project Coet ct: DanielleAllenQuinn Closson PRELIMINARY PHOTOMETRIC ANALYSIS 3 SHEETS P(I Ld Z_ J U Q HEIGHT = 35' NEW ARM LENGTH = 8' NEW LAMP = 90W LED NEW FIXTURE = ARCH—M AF48 NEW HEIGHT = 35' NEW ARM LENGTH = 8' NEW LAMP = 90W LED NEW FIXTURE = ARCH—M AF48 NEW 0 REVISION DATE BY DESIGNED BY: ISSUE DATE: DMA/PP 10-02-2020 DRAWN BY: JOB NO.: DMA/PP TENW #6011 APPROVED BY: DRAWING FILE NO.: CTB 19TENW Transportation Engineering NorthWest nsportation Planning I Design I Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 Office (425) 889-6747 Project Contact: Danielle Allen Phone: 425-250-0584 —Z� 15 60 0 30 90 SCALE IN FEET Pape Group 355 Goodpasture Island Rd Ste 300, Eugene, OR 97401 541-334-3437 gclosson@pape.com Quinn Closson TARGET CALCULATION SUMMARY ACTUAL DESIGN CRITERIA CALCULATION AVG. UNIFORMITY AREA MAINTAINED RATIO FOOT CANDLES AVG. FC/ (FC) MIN. FC 1.00 3.00:1 S 320TH ST. 1.36 2.27:1 S 320TH ST & 32ND AVE S 2.00 3.00:1 INTERSECTION 2.01 2.51:1 0.60 3.00:1 32ND AVE S 0.84 2.80:1 M O I U CL Ld Ld 2 Ld Ld N I Ld Z_ J U Q h7:LKy/l►[60113 PAPE KENWORTH TRUCK FACILITY PC-02 SHEET NO.: 2 OF PRELIMINARY PHOTOMETRIC ANALYSIS 3 SHEETS IAI REVISION I DATE I BY DESIGNED BY: ISSUE DATE: DMA/PP 10-02-2020 DRAWN BY: JOB NO.: DMA/PP TENW #6011 APPROVED BY: DRAWING FILE NO.: CTB "P tyII - JV t1 - II-11 FIXTURE = ARCH—M AF48 NEW 19TENW Transportation Engineering NorthWest nsportation Planning I Design I Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 Office (425) 889-6747 Project Contact: Danielle Allen Phone: 425-250-0584 15 60 0 30 90 SCALE IN FEET R/W R/W Pape Group 355 Goodpasture Island Rd Ste 300, Eugene, OR 97401 541-334-3437 gclosson@pape.com Quinn Closson TARGET CALCULATION SUMMARY ACTUAL DESIGN CRITERIA CALCULATION AVG. UNIFORMITY AREA MAINTAINED RATIO FOOT CANDLES AVG. FC/ (FC) MIN. FC 1.00 3.00:1 S 320TH ST. 1.36 2.27:1 S 320TH ST & 32ND AVE S 2.00 3.00:1 INTERSECTION 2.01 2.51:1 0.60 3.00:1 32ND AVE S 0.84 2.80:1 DRAWING NO.: PAPE KENWORTH TRUCK FACILITY PC-03 SHEET NO.: 3 OF PRELIMINARY PHOTOMETRIC ANALYSIS 3 SHEETS