Jump Start Espresso Approved Site PlanParking Analysis for Cross -use Parking Agreement Parking Analysis for Twin Lakes Plaza: JSE = Jump Start Espresso/Site (B) = Business TLP = Twin Lakes Plaza/Site (M) = Mercantile E = Existing SIZE USE PARKING PARKING/TOTAL BLDG (S.F.) (E) = EXISTING [Note 5] (B) = BUSINESS Accessible and M = MERCANTILE/RETAIL Standard Stalls A 30' X 60' = 1800 S.F. 1800 S.F. OFFICE B M 1/300 = 6 E B 100' X 40' = 4,000 S.F. 1,600 S.F. HAIR (B) 1/300 = 6 (E) 2,400 S.F. RETAIL M 1/300 = 8 E C 80' X 40' = 3,200 S.F. 1,600 S.F. OFFICE (B) 1/300 = 11 (E) 1600 S.F. RETAIL M 1 D 40' X 60' = 2,400 S.F, 2,400 S.F. OFFICE B 1/300 = 8 E E 40' X 40' = 1,600 S.F. 800 S.F. DRY CLEAN (B) 1/300 = 5 (E) 800 S.F. SPA/NAILS B TOTAL -+ 1/300 = 44 (E)T 59 (E) Proposed for Sump Start Espresso: 37' X 22' O.A. Jump Start Roof Area Drive Thru Espresso "F' 691/80 = 9 Stalls Required [Note 2] Interior Space = 561 S.F. Outdoor Seating = 130 S.F. Total Area = 691 S.F. See Note 3 TOTAL REQUIRED = 44 @ Twin Lakes Plaza + 9 @ JSE = 53 Spaces [Note 1] FOUR (4) STALLS WILL BE BUILT ON THE JUMP START ESPRESSO SITE SHARED ! PLUS PARKING � (5) STALLS TO BE RE -STRIPED @ THE TWIN LAKES PLAZA SITE FOR A TOTAL OF (9) PROPOSED . i SPACES TO BE ATTRIBUTED TO THE JUMP START ESPRESSO PROJECT NOTE 4 Note 1: l AN ADD'L 13 STALLS CAN BE ADDED ON THE TWIN LAKES PLAZA SITE BY RE -STRIPING THE EXISTING PARKING @ THE AREA NORTH OF THE JUMP START ESPRESSO SITE FOR A COMBINED TOTAL FOR BOTH SITES TO 72 PARKING STALLS Note 2: ; JSE REQUIRED PARKING = 1 STALL/80 S.F. (SEE PRE -APPLICATION CON F. LETTER) Note 3: NO INTERIOR SEATING WILL BE PROVIDED. Note 4: FIVE SPACES AT TLP WILL DESIGNATED TO THE JSE DEVELOPMENT THRU SIGNAGE AND/OR PAINTED STALLS Note 5: EXISTING = STALLS CURRENTLY "STRIPED' @ THE TWIN LAKES PLAZA SITE. NOTE 6: ONE (1) ACCESSIBLE VAN STALL PROVIDED/ ONE (1) PER 25 REQUIRED I or , 1 NGVN vovES 48" GUARD (BLACK WIRE MESH FENCE) MOUNT ON POND RETAINING WALL LEGEND LEGEND (PLAN VIEW) SYMBOL MATERIAL / ITEM SYMBOL MATERIAL / ITEM EXTERIOR WALL STUD WALL w/ HARDIE SIDING (@ INTERIOR) CMU WALL GYPSUM WALLBOARD (@ TRASH/RECYCLE) (GWB) DETAIL N0. (E) EXISTING DETAIL SHEET NO. SECTION I.D. INTERIOR SHEET No. oy� SECTION } SHEET N0. ELEVATION `f #' BATT INSULATION -- RIGID INSULATION DUPLEX SS STAINLESS STEEL OUTLET 4-PLEX $ LIGHT SWITCH OUTLET 3 WAY LIGHT WALL SCONCE 3 SWITCH SURF = SURFACE MOUNTED THERMOSTAT LIGHT FIXTURE R = RECESED FIXTURE HwT HOT WATER TANK U SPECIAL POWER O EQUIPMENT DOOR (SEE EQUIPMENT SCHEDULE) X (SEE SCHEDULE) WINDOW Q REVISION (SEE SCHEDULE) 100 CFM EXHAUST FAN EXIT SIGN w/ LIGHTS w/ LIGHT.- EXH. TO ATMOS. & BATTERY BACK-UP �-- SOFFIT LIGHT WALL MOUNTED LIGHT (EXTERIOR) (EXTERIOR) PARKING LOT LIGHT FIXTURE BOLLARD: 6" 0 STEEL PIPE �orT SITE PLAN (3) PLACES ® FILLED w/ CONC. (SITE PLAN) DET, 9 SHT. A5.0 - 4 PLACES O PARKING LOT `BOLLARD' LIGHT (E) = EXISTING SITE PLAN - (3) PLACES 3430 SW 3201'' STREET (WHERE GRADE ON LOW �- T P O1 SIDE IS OVER 30 BELOW F WALL) - i PP IKING STALLS EXI G PARt ING UY Twin Lakes -Plaza PE I CROS USE P NRKINC LOT AC REEM? - STD PARKING (9' x 18') - �J��QZ�, 5 6 7 6 9 � _! 2 .. . �..:= I� _ 4'-0" CONC. PATH - N 52°29` 56" E 144,88' -�� T% -"-_ -_ LIGHT STD. - 1V BLDG.-SETBACK kj 15' REQ'D LANDSCAPING / -- - - RETAING _ 2 SEE "LANDCAPE PLAN \ Ni `- -� REVISED N �" PARCEL 13210 90 7 PLANT G 2 ADDED TREE �� - ---I k- "6 _ -SEE�LIGHT STD. H + \ ,.S E E C IV L Le ^ GHT / : - = " P. (4) PLACf=S l ✓� ' _ -- -` - `-0" WIDE I /� - 3 _441� 0 = SIDEWALK a CCESSIBLE PARK'G 1tEVISED ATE: STALL (1) 8' WIDE X PI-ANT'G S�EE�EXC, ESSt�iT�.OG }CV \ AISLE ADJACENT AREA, r � 1. I / f PTACLE BOLLARD T SHT. A5.0 o ENCL URE Q' SEE S A5.0 �� 1 DCV MENU °� 1 2 :3 4 BOARD L STD. KING cr ; u REVISED 9' 18' JUMP START ESPRESSO Z ; PLANT'G� - 1DRiVE UP "SERVICE REQ'D LANDSCAPING :� � DSCAPP PLANS R f ' REQ' PINES- G SAVDRIVEWAY - .�.,-SEE CIVIL _ -- . PEDESTRIAN TH, 4 DE w SIDEWAK REPAIR (2) PLACES (PATTERNED CONCRETE) BEET T - R = 531.9' 0= 20 03' 19 L = 185.90 SEE CIVIL . w . 32d Z / General Notes: 1. ALL WORK SHALL CONFORM TO REQUIREMENTS OF THE FOLLOWING AS THEY MAY APPLY: • International Building Code (IBC), 2015 edition, including Appendices E and J • Washington State Amendments, WAC 51-50 and RCW 19.27 & 70.92 • Accessibility Code ICC/ANSI A117.1-2009 • International Mechanical Code (IMC), 2015 edition Washington State Amendments, WAC 51-52 and RCW 19.27 • International Fire Code (IFC), 2015 edition, including Appendices B, C, E, F, and I Washington State Amendments, WAC 51-54A and RCW 19.27 • International Existing Building Code (IEBC, 2015 edition • International Fuel & Gas Code (IFGC), 2015 edition • International Property Maintenance Code (IPMC), 2015 edition • International Energy Conservation Code (IECC), 2015 edition Washington State Amendments, WAC 51-11R & 51-IIC and RCW 19.27 • Washington State Energy Code (WSEC), 2015 edition • National Electrical Code (NEC), 2017 edition Washington State Amendments, WAC 296-43, 296-45 & 296-46B and RCW 19.28 • Uniform Plumbing Code (UPC), 2015 edition, excluding Chapters 12 and 15 - Washington State Amendments, WAC 51-56 and RCW 19.27 • & ALL OTHER APPLICABLE CODES AS ADOPTED OR EXCLUDED BY THE CITY OF FEDERAL WAY. 2. THE SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEM, OR THEIR EXACT MEANING, THE ARCHITECT SHALL BE CONTACTED FOR CLARIFICATION. 3. OWNER OR AGENT SHALL SUBMIT FOR BUILDING PERMIT. 4. ALL FRAMING MEMBERS SHALL BE SO ARRANGED AND SPACED AS TO PERMIT INSTALLATION OF PIPE CONDUITS AND DUCTWORK WITH A MINIMUM OF CUTTING. 5. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACES, BACK-UP PLATES, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL WALL MOUNTED OR SUSPENDED STAIR RAILINGS, CASEWORK, TOILET ROOM ACCESSORIES, MECHANICAL, ELECTRICAL, PLUMPING, OR MISCELLANEOUS EQUIPMENT. 6. INSTALL METAL CORNER BEADS AT ALL EXPOSED WALLBOARD EDGES, INSTALL CASING BEADS WHEREVER GWB, PLASTER, ETC. ABUTS A DISSIMILAR FINISH MATERIAL & PROVIDE SEALANT AS REQUIRED. 7. ALL COLORS, FINISHES, TEXTURES, ETC. AS DIRECTED BY OWNER AND/OR ARCHITECT. 8. ALL FIRE RATED ASSEMBLIES SHALL BE ICBO OR UL APPROVED AND PROVIDED AS INDICATED ON THE APPROVED DRAWINGS. ANY PENETRATIONS AT THE FIRE RESISTIVE ASSEMBLIES SHALL BE SEALED WITH UL APPROVED FIRE STOPPING. SUBMIT METHOD OF FIRE STOPPING TO BUILDING INSPECTOR FOR APPROVAL. 9. FURNISH AND INSTALL EMERGENCY LIGHTING. IN NO CASE SHALL THE LIGHTING LEVEL BE LESS THAN ONE -FOOT CANDLE AT FLOOR LEVEL IN ALL HALLWAYS. VERIFY MODIFICATIONS TO EXISTING SPACES(S) IF NECESSARY. 10, ALL EXIT SIGNS SHALL HAVE 6" HIGH LETTERS IN ACCORDANCE WITH LOCAL CODES OR SHALL CONFORM TO IBC REQUIREMENTS. LUMINANCE ON SIGN SHALL BE 50 LUX. ILLUMINATED EXIT SIGNSTO HAVE RESERVE POWER. 11. ALL DOOR SIZES SHOWN ON THE DOOR SCHEDULE ARE OPENINGS SIZES. ALL DOORS AND FRAMES SHALL BE REINFORCED WHERE REQUIRED FOR CLOSERS, STOPS, HARDWARE, ETC. 12. DOORS IN RATED WALLS SHALL CONSIST OF SELF-CLOSING/LATCHING ASSEMBLIES WITH SMOKE & DRAFT SEALS AT HEAD & JAMB. DOOR ASSEMBLY RATINGS SHALL BE COMPATABLE WITH WALL RATING [PER IBC]. 13. EXIT REQUIREMENTS: a. ALL LEGAL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT AND SHALL HAVE SIGNS POSTED READING "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS". b. CONTRACTOR SHALL PROVIDE TEMPORARY EXITS SIGNS TO ASSURE A MEANS OF EGRESS DURING CONSTRUCTION, AS MAY BE NECESSARY. c. DOORS EQUIPPED WITH PANIC HARDWARE SHALL BE OPERABLE WITH A MAXIMUM FORCE OF 15 LBS. APPLIED IN THE DIRECTION OF EGRESS TO THE BAR. d. CLOSING SPEED: DOOR CLOSERS SHALL ADJUSTED SO THAT FROM AN OPEN POSITION OF 90 DEGREES, THE TIME REQUIRED TO MOVE THE DOOR TO AN OPEN POSITION OF TWELVE (12) DEGREES SHALL BE FIVE (5) SECONDS MINIMUM.[ACC/ANSI 117.1 2009 404.2.7.1] e. OPENING FORCE: FIRE DOORS SHALL THE MINIMUM OPENING FORCE ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY. THE FORCE FOR PUSHING OR PULLING OPEN DOORS OTHER THAT FIRE DOORS SHALL BE FIVE (5.0) POUNDS FOR INTERIOR HINGED DOORS [ICC/ANSI 117/1- 2009] - 14. BARRIER FREE ACCESS REQUIREMENTS: SHALL COMPLY WITH BARRIER FREE REQUIREMENTS AND SHALL BE IN COMPLIANCE WITH 2O15 IBC CHAPTER 11 AND ICC/ANSI A117.1-2009. 15. MECHANICAL/Heating SYSTEM SHALL BE "BIDDER/DESIGN". a. SCOPE OF WORK: Electric wall heater with thermostat(s) b. VERIFY ALL REQUIREMENTS WITH AGENT &OWNER. c. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED PERMITS d. SYSTEM SHALL COMPLY WITH THE WASHINGTON STATE ENERGY CODE FOR FRESH AIR & VENTILATION REQUIREMENTS PER IBC CHAPTER 12 & THE WSVIAQC - AS APPLICABLE. 16. PLUMBING SHALL BE -BIDDER/DESIGN"., a. REVIEW EXISTING UNDERGROUND SYSTEM TO ASSURE A COMPLETE OPERATIONAL SYSTEM-TOINCLIIDE DGVA - b. VERIFY ALL REQUIREMENTS PER LAKEHAVEN REQTS c. SUBMIT DESIGN TO INCLUDE DRAWINGS ALL CALCULATIONS AS REQUIRED FOR APPROVAL BY THE CITY. d. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED PERMITS. 3 17. ELECTRICAL SYSTEM SHALL BE "BIDDER/DESIGN". a. SCOPE OF WORK: NEW LIGHTING SYSTEM NEW LIGHT FIXTURES b. VERIFY ALL REQUIREMENTS WITH AGENT AND/OR OWNER. c. COORDINATE TENANT PROVIDED AND EXISTING EQUIPMENT AS REQUIRED. d. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED PERMITS e. INSTALLATION OF ELECTRICAL EQUIPMENT, LIGHT FIXTURES, EXIT SIGNS, AS INDICATED ON THE PLANS, IS CONCEPTUAL. FINAL LOCATIONS) SHALL BE BASED ON THE ACCEPTED ELECTRICAL SUBCONTRACTORS DESIGN. 18. FIRE ALARM SYSTEM SHALL BE "BIDDER/DESIGN a. VERIFY ALL REQUIREMENTS WITH agent or OWNER AND FIRE MARSHALL. b. SUBMIT DRAWINGS AND CALCULATIONS FOR APPROVAL AS REQUIRED BY THE CITY. c. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED PERMITS 19. COORDINATION OF SECURITY SYSTEM. a. PROVIDE SECURITY SYSTEM COORDINATED WITH AS DIRECTED BY OWNER. b. SUBMIT DRAWINGS AND CALCULATIONS FOR APPROVAL AS REQUIRED BY THE CITY. c. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED PERMITS 20. PROVIDE FIRE EXTINGUISHERS AS REQUIRED, VERIFY PLACEMENT AND REQUIREMENTS WITH THE FIRE MARSHAL. 21. THESE DRAWINGS AND SPECIFICATIONS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE SAFETY, CARE OF ADJACENT PROPERTY DURING CONSTRUCTION, COMPLIANCE WITH STATE AND FEDERAL REGULATIONS REGARDING SAFETY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 22. FIELD VERIFY ALL EXISTING CONDITIONS & DIMENSIONS. REPORT DISCREPANCIES TO ARCHITECT AND/OR GENERAL CONTRACTOR. C ivil• Engineers, AP Consulting g , PLLC Adam Paul, P.E. PO Box 162 Auburn, WA 98071 Land P sca a Architect: Bradley Design Group, Inc.. Kathleen Reader, Principal Landscape Architecture Consultants: t Strucral• u Visser Engineering Andy Derrick, P.E. 33001 Avenue South (320) Federal Way, ton Washin F Y► 9 Soils: Inc. GEOTECH Consultants, Marc R. McGinnis, PE 13256 BE 20t" Street, Suite 16 Bellevue. Washington98005 Su Y rve or• Inc. P.S. i Ce ntre Pointe Consultants Norm Larson, , PLS 14209 29t'' Street East (105) Sumn er, Washington n 98390 Traffic: s Heath & Associates Inc. Greg Heath, PE, PTOW 2214 Tacoma Raid 9 371 Puyallup, ton Washin 8 Y P. 9 Zoning & Building Code Notes: New Drive Thru Coffee @ 3450 Southwest 320th Street Federal Way, Washington Scope of Work: o NEW ONE-STORY 561 S.F. BUILDING (Conditioned Space) o OUTDOOR/COVERED SEATING AREA (130 S.F.) for JUMP START ESPRESSO & COFFEE DRIVE-THRU with: o OUTDOOR COVERED SERVING AREA (108 S.F.) @ DRIVE-THRU Owner: Twin Lakes Plaza LLC o 33919 Ninth Avenue South, Suite 201 Federal Way, Washington 98003 Building: Construction Type: VB INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION, INCLUDING APPENDICES Code References: E & J WASHINGTON STATE AMENDMENTS, WAC 51-50 AND RCW 19.27 & 70.92 ACCESSIBILITY CODE ICC/ANSI A117.1-2009, 2015 IMC, IPC, UPC, OFGC, IFC & WASHINGTO STA TE ATE ENERGY CODE ALL STATE AMENDMENTS & APPLICABLE CODES I AS ADOPTED OR EXCLUDED BY THE CITY OF FEDERAL WAY Occupancy/Use: Existing: Vacant Site Proposed: Drive Up Coffee Service - (B) Occupancy Zoning: Zone Neighborhood Business BN Building Height 35' Max. Proposed Height = 18' + @ `Tallest' Point (Ridge) Side/West = 15' 15' Required Landscape Buffer (Type III) Setbacks Rear North = 10' 5' Required Landscaping (Type III) Front/South = 5' Required Landscaping (Type III) Landscaping 5' @ North, South & East Prop. Lines Note: 15' @ West Property Line R7.2 Zone to the West Requires a 15' Type III Buffer R uired Provided ONE STALL REQ'D PER 80 S.F. - (3) Standard (9' X 18') Stalls On -Site & or (1) Accessible/Van Stall proposed On -Site Parking: (561 S.F. + 130 S.F.) = 9 STALLS - (4) Stalls to be located on the adjacent Twin 80 S.F. Lakes Plaza site via Shared Parking Agreement to be executed with Twin Lakes Plaza Jump Espresso Parking per Pre -Application Conference Summary dated 06.10.2019 Areas: Area Occupancy Occupant Load Factor Occ. Load Jump Start Espresso 561 GSF B 1 per 80 SF 4 1 Conditioned Area = 600 S.F. Notes: 2 Outdoor Covered Seatin Area @ North Side of Building = 130 S.F. Parcel Number: Legal Description Area BEG ON N LN OF NW 1/4 OF NW 1/4 868.80 FT E FR NW COR THOF TH S 35-48-36 W 605.94 FT TO BEG OF CURVE TO RGT RAD 530.96 FT TH SWLY 132103-9067 ALG SD CURVE THROUGH C/A OF 07 DEG 46 MIN 10 SEC DIST 72 FT TO 19,035 S.F. POB TH CONTG SWLY ALG SD CURVE THROUGH C/A OF 20 DEG 04 MIN 32 SEC DIST 186.04 FT TH N 26-20-42 W 115 FT TH N 53-37-02 E 145 FT TH S 46-25-14 E 115 FT TO POB --_ Plumbing: Required Provided 1 Service Sink Floor Mop SW Jump Start Espresso 1 Hand Wash 1 Hand Wash Sink 1 3-Compartment Sink 1 3-Compartment Sink 1 Lavatory Sink 1 Lavatory Sink Vicinity Mapa- d r_ .0 N 1 -i - Architectural Structural A1.0 Zoning & Building Notes SI A General Structural Notes > Vicinity Map / Site PlanLU G Drawing Symbols Legend X: W >Cross-UsePa kin Analysis m- A2.0 :Floor Plan /Roof Plan S1.2 Statement of Special Inspections z Building Section A -A /Detail's o z i„ >UNIL' Roof Ventilation Calc's I_...................__...___.................._.__......_._.... LU a o w ._............_................................,.......... ........._..._.......................... ..................................................... _....... _.................. ...................................... _................................................................ ............... ...................... _._....._...,-......._..............................................................._............ .._.._._............._. d' u! A3.0 Exterior Elevations S2.1 'Foundation Plan a N z N' E> V o. r Roof Framing Plan u Wall Sections Toilet Plan . '� � ,�, c, g ...............................P......................................................�................ Z z A4.0 Equipment Plan & Schedule S6 0 :Schedules Interior Elevations C6 Or v, o BuildingSection B-B F.................._......................................................_......................_.............................._.__....._......._......................................._..................... "' ......................_$............._..........._......._........_..._.............................._..-__._. c� o' w w A5.0 Details S6.1 _......................_._.. g = Z o Details z a "' Z Z .................. _._........_.._................. _.._.._.... _................................................... _..............._............ .........................................._................_......_............................._................................................................_........_......__........;..........._......................................_._........................_....._.._......_....................._..................._. o �- U w a a / w(Dj V) to HZw, W LLI (A (nwac,� Civil Suryey j O ............ .................. ....... _.....-................................... _..................._..._...................._._......................._........................................................... •N . C1 Site Plan 1 Topographic survey '� s c2 .. TESC Plan - Landscape Architect Q g C3 : Grading & Utilities Plan ........... _....._.__..._..._.._.........__.........j.... _........................................................._................................. ...._............................ .......... ..... .......................... _...... _......._.._........ ._..... ........ C4 � Sections & Details L'i ;Landscape Planting Plan 2020.01 ..__......._.._........_._......._...................................................... ............. _..............._................. ............... ........... .................... _................................................... ..... ......................................... ........................ ................................................................................ _.............. _.........._............................................_..............._....._..............._.._ C5 Sections & Details L2 Details Related Information to Compliment Plans: - Project Manual & Outline Specifications - Soils Report - Structural Calculations - Technical Information Report Al 111110' Email meh�architect hotmaii.com for p4f copies of the above information