Loading...
20-105047-00-UP-JUMP START RESPONSE TO DEPT COMMENTS-09.02.2021-V3CITY OF Federal Way August 16, 2021 Twin Lakes Plaza LLC 33919 91h Avenue South, Suite 105 Federal Way, WA 98003 cbpixton a pugetsoundcommercial.com COMMUNITY DEVELOPMENT DEPARTMENT 33325 811' Avenue South Federal Way WA 98003 253-835-2607;Fax 253-835-2609 www.citvoffederalwU.com Re: File #20-105047-00-UP; TECHNICAL REVIEW COMMENT LETTER #3 Jump Start Espresso, 3450 SW 320th Street, Federal Way Dear Mr. Pixton: See Design Team Responses in red City staff has conducted review of your July 27, 2021, resubmittal of documents as part of the Process II Master Land Use application for the proposed Jump Start Espresso at the above - mentioned address. City staff has provided the following comments that will need to be addressed prior to approval of your application, or as otherwise noted. Questions regarding the technical review comments should be addressed to the referenced staff representative. PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION Cole Elliott, 253-835-2730, cole.elliott(&cityoffederalway.com The italicized text is a specific comment with regard to the submitted response letter: 1) No updated Technical Information Report (TIR) was submitted with the packet. Please provide a copy when it becomes available. See Revised / Updated TIR 2) The current plan set is on the wrong vertical datum. A check of the site survey indicates the datum used is NAVD 88 we cannot grant land use until the datum, all contours and call outs, are changed to NGVD 29. No math correction will be accepted. The Survey & Civil drawing have been revised to reflect the correct datum 3) Provide a truck turning diagram using a Vactor truck as the model from the driveway onto the storm pond access road. Vactor trucks will not be used for the private maintenance of this facility. 4) No details have been provided on the stormwater wetland. Please provide an updated See TIR Technical Information Report (TIR) in order to evaluate the stormwater wetland. 5) Bioretention is no longer proposed. The Architectural Site Plan submitted with the Use Process application still shows bioretention on the plan south of the trash enclosure and the Landscape Plan shows a bioswale in the same location; both should be removed from the plans and updated accordingly. The Architectural &Landscape Site Plans have been revised to reflect Comment No. 5 6) As of August 16, 2021, a right-of-way modification waiver request has not been submitted; therefore, all traffic comments still apply including the requirement to improve the driveway from SW 320th Street. The Right of Way Modification Waiver Request is included with this submittal 7) Pond Section A does not include the control structure. Revise drawing to depict control structure. See Civil Drawings 8) The pond sections indicate vertical wall approximately six -feet in height but no fencing. Please explain why. A fence has been added. See Architectural Site Plan 9) Provide proposed elevation of the top of the pond berms at inlet and outlet ends. Proposed elevation call -outs are PUBLIC WORKS —TRAFFIC DIVISION already clearly provided on C3 Sarady Long, 253-835-2743, sarady.loni!(a,cityoffederalway.com The ROW modification waiver request is included in this submittal 1) A right-of-way modification waiver request has not been submitted by the engineer as stated in the Summary of Responses. The submitted plan must show improvement and rights -of -way dedication along the frontage on SW 320th Street consistent with planned roadway cross -sections Type "I" street. Please note, a right-of-way modification will be reviewed under a separate permit once received and appropriate fee is paid. 2) The submitted plans did not show upgrade/improve to the existing driveway on SW 320th Street as stated in the summary responses from the engineer. The driveway must be improved to the commercial driveway standard and such improvement must be shown on the civil plan. The plans included with this submittal show the requested upgrade to the existing APPLICATION STATUS driveway on SW 320th Street Please make the corrections and resubmit the requested materials with a completed "Resubmittal Information Form" (attached), and a letter indicating how the comments above have been addressed. All resubmittals need to go through the permit portal at httos://www.cltyoffederalway.com/node/4588. Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the City within 180 days of being notified that such information is requested, the application shall be deemed void. The FWRC can be reviewed in its entirety at https://www.code-oublishin2.com/WA/Federa]Wav/. 20-105047-00-UP Jump Start Espresso Page 2 of 3 Doc. I.D. 81612 Keep in mind that as a result of redesigning and/or revising the preliminary plans, other City and agency comments and conditions may result in a request for additional or revised information. Please note, the original plan review fee collected at submittal of your permit covers the initial review and one resubmittal only. Commencing September 1, 2021, the City will begin charging applicants for any additional staff time necessary to complete each review following the first resubmittal. If you have any questions regarding this letter or your development project, please contact me at chaney.skadsen�a,cityoffederalway.com, or (253) 569-1772. Sincerely, Chaney Skadsen Associate Planner enc: Bulletin 4129, Resubmittal Information c: Cole Elliott, Development Services Manager Sarady Long, Senior Transportation Planning Engineer Michael Hovland, meh.architect(i0otmail.com 20-105047-00-UP Jump Start Espresso Page 3 of 3 Doe. I.D. 81612