Re: File #20-105047-00-UP; TECHNICAL REVIEW COMMENT LETTER #3
Jump Start Espresso, 3450 SW 320th Street, Federal Way
Dear Mr. Pixton:
See Design Team
Responses in red
City staff has conducted review of your July 27, 2021, resubmittal of documents as part of the
Process II Master Land Use application for the proposed Jump Start Espresso at the above -
mentioned address.
City staff has provided the following comments that will need to be addressed prior to approval
of your application, or as otherwise noted. Questions regarding the technical review comments
should be addressed to the referenced staff representative.
PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION
Cole Elliott, 253-835-2730, cole.elliott(&cityoffederalway.com
The italicized text is a specific comment with regard to the submitted response letter:
1) No updated Technical Information Report (TIR) was submitted with the packet. Please
provide a copy when it becomes available. See Revised / Updated TIR
2) The current plan set is on the wrong vertical datum. A check of the site
survey indicates the datum used is NAVD 88 we cannot grant land use
until the datum, all contours and call outs, are changed to NGVD 29. No
math correction will be accepted. The Survey & Civil drawing have been
revised to reflect the correct datum
3) Provide a truck turning diagram using a Vactor truck as the model from the driveway
onto the storm pond access road. Vactor trucks will not be used for the
private maintenance of this facility.
4) No details have been provided on the stormwater wetland. Please provide an updated See TIR
Technical Information Report (TIR) in order to evaluate the stormwater wetland.
5) Bioretention is no longer proposed. The Architectural Site Plan submitted with the Use
Process application still shows bioretention on the plan south of the trash enclosure and
the Landscape Plan shows a bioswale in the same location; both should be removed from
the plans and updated accordingly. The Architectural &Landscape Site Plans
have been revised to reflect Comment No. 5
6) As of August 16, 2021, a right-of-way modification waiver request has not been
submitted; therefore, all traffic comments still apply including the requirement to
improve the driveway from SW 320th Street. The Right of Way Modification Waiver
Request is included with this submittal
7) Pond Section A does not include the control structure. Revise drawing to depict control
structure.
See Civil Drawings
8) The pond sections indicate vertical wall approximately six -feet in height but no fencing.
Please explain why. A fence has been added.
See Architectural Site Plan
9) Provide proposed elevation of the top of the pond berms at inlet and outlet ends.
Proposed elevation call -outs are
PUBLIC WORKS —TRAFFIC DIVISION already clearly provided on C3
Sarady Long, 253-835-2743, sarady.loni!(a,cityoffederalway.com The ROW modification
waiver request is included in this submittal
1) A right-of-way modification waiver request has not been submitted by the engineer as
stated in the Summary of Responses. The submitted plan must show improvement and
rights -of -way dedication along the frontage on SW 320th Street consistent with planned
roadway cross -sections Type "I" street. Please note, a right-of-way modification will be
reviewed under a separate permit once received and appropriate fee is paid.
2) The submitted plans did not show upgrade/improve to the existing driveway on SW 320th
Street as stated in the summary responses from the engineer. The driveway must be
improved to the commercial driveway standard and such improvement must be shown on
the civil plan. The plans included with this submittal show
the requested upgrade to the existing
APPLICATION STATUS driveway on SW 320th Street
Please make the corrections and resubmit the requested materials with a completed "Resubmittal
Information Form" (attached), and a letter indicating how the comments above have been
addressed. All resubmittals need to go through the permit portal at
httos://www.cltyoffederalway.com/node/4588.
Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the City
within 180 days of being notified that such information is requested, the application shall be
deemed void. The FWRC can be reviewed in its entirety at
https://www.code-oublishin2.com/WA/Federa]Wav/.
20-105047-00-UP Jump Start Espresso Page 2 of 3 Doc. I.D. 81612
Keep in mind that as a result of redesigning and/or revising the preliminary plans, other City and
agency comments and conditions may result in a request for additional or revised information.
Please note, the original plan review fee collected at submittal of your permit covers the initial
review and one resubmittal only. Commencing September 1, 2021, the City will begin charging
applicants for any additional staff time necessary to complete each review following the first
resubmittal.
If you have any questions regarding this letter or your development project, please contact me at
chaney.skadsen�a,cityoffederalway.com, or (253) 569-1772.
Sincerely,
Chaney Skadsen
Associate Planner
enc: Bulletin 4129, Resubmittal Information
c: Cole Elliott, Development Services Manager
Sarady Long, Senior Transportation Planning Engineer
Michael Hovland, meh.architect(i0otmail.com
20-105047-00-UP Jump Start Espresso Page 3 of 3 Doe. I.D. 81612