20-105047-TRAFFIC ANALYSIS-12-29-2020-V1JUMP START ESPRESSO TRAFFIC IMPACT ANALYSIS Federal Way, WA Prepared for: Twin Lakes Plaza LLC c/o Mr. Court Pixton Puget Sound Commercial Real Estate 33919 Ninth Avenue S (105) Federal Way, WA 98003 October 2020 HEATH & ASSOCIATES, INC Transportation and Civil Engineering 10/16/2020 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com JUMP START ESPRESSO TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction ...................................................................................................................3 2. Project Description ........................................................................................................3 3. Existing Conditions ........................................................................................................6 4. Forecast Traffic Demand and Analysis .........................................................................9 5. Conclusions & Mitigation ............................................................................................. 16 Appendix ............................................................................................................................. 17 LIST OF TABLES 1. Project Trip Generation .................................................................................................9 2. Baseline 2020 & Forecast 2023 Peak Hour Level of Service ...................................... 15 3. Estimated Espresso Stand Traffic Impact Fee ............................................................ 16 LIST OF FIGURES 1.Vicinity Map & Roadway System ..................................................................................4 2. Site Plan ........................................................................................................................5 3. Baseline 2020 Peak Hour Volumes ..............................................................................7 4. AM Peak Hour Trip Distribution & Assignment ............................................................ 11 5. PM Peak Hour Trip Distribution & Assignment ............................................................ 12 6. Forecast 2023 AM Peak Hour Volumes ...................................................................... 13 7. Forecast 2023 PM Peak Hour Volumes ...................................................................... 14 2 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com JUMP START ESPRESSO TRAFFIC IMPACT ANALYSIS 1. INTRODUCTION The main goals of this study focus on the assessment of existing roadway conditions and forecasts of newly generated project traffic. The first task includes the review of general roadway information on the adjacent streets serving the subject site and gathering existing vehicular volumes within a defined study area. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. As a final step, appropriate conclusions and mitigation measures are defined, if needed. 2. PROJECT DESCRIPTION Jump Start Espresso proposes for the construction of a new coffee stand located in the city of Federal Way. Development is to encompass a 561 square foot building, 130 square feet of outdoor/covered seating and a single drive-through. The subject site is bordered to the south via SW 320th Street. The site is situated on an undeveloped 0.44-acres parcel (#: 132103-9067). Access to the property is proposed via an existing shared driveway on SW 320th Street. A total of nine parking stalls are proposed with four on-site and five on the adjacent parcel to the north through a shared parking agreement. A site map of the general vicinity is illustrated in Figure 1. A conceptual site design illustrating the overall project configuration is presented in Figure 2. Illustrated below is a site aerial. 3 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 4 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com NFIGURE 2HEATH & ASSOCIATESTRAFFIC AND CIVIL ENGINEERINGSITE PLANJUMP START ESPRESSO5 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 3. EXISTING CONDITIONS 3.1 Existing Street System The major roadway serving the proposed project is SW 320th Street, a multi-lane minor arterial that borders the subject site to the south. The posted speed limit is 35 mph, and lane widths are approximately 11-13 feet. A two-way left turn lane is provided across the project frontage and along the majority of the roadway. This TWLTL transitions into left turn pockets at major intersections. A marked pedestrian crosswalk equipped with a rapid flashing beacon and a center pedestrian refuge island is provided on the roadway approximately 120 feet northeast of the subject site. Shoulders are composed of curb, gutter and sidewalk varying in width. 3.2 Non-Motorist Traffic Pedestrian and bicycle activity were observed on the nearby street segments studied for this project. Observations were made during routine peak hour movement counts and indicated a moderate amount of non-motorist activity across the subject property’s frontage with 10 pedestrians during the AM peak hour and 7 pedestrians during the PM peak hour. No bicyclists were observed during either peak hour. SW 320th Street offers complete sidewalk, providing connection to nearby residential developments and Decatur High School to the northeast. By providing covered, outdoor seating, the espresso stand has the ability to serve pedestrians passing by the development. 3.3 Existing Peak Hour Volumes Traffic counts were performed at the proposed shared access intersection on SW 320th Street to determine baseline vehicular activity. Field data was collected in September of 2019 during the peak weekday periods between 7:00-9:00 AM and 4:00-6:00 PM. The one-hour reflecting highest overall volumes (peak hour) for each time period was then used to analyze worst-case conditions. These volumes were grossed up by a compound annual growth rate of 1.5 percent to represent baseline 2020 volumes. This growth rate was derived from the Federal Way Comprehensive Plan, which estimates an average growth rate of 0.65 percent per year by 20351. Baseline 2020 AM and PM peak hour intersection volumes are illustrated in Figure 3 on the following page. Full count sheets have been included in the appendix for reference. 1 Federal Way Comprehensive Plan—Chapter 2: Land Use 6 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 7 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 3.4 Public Transit A review of King County Metro’s service system indicates that a bus stop for Route 187 (Federal Way TC to Twin Lakes) is located directly at the project’s frontage on SW 320th Street. Weekday hours of operation span from 5:03 AM – 10:09 PM, with service approximately every 30 minutes. Saturday service is provided from 8:00 AM – 9:39 PM with 60-minute headways. Sunday service is provided from 9:00 AM – 7:38 PM with 60- minute headways. Refer to the King County Metro Schedule for detailed route information. 3.5 Roadway Improvements A review of the current City of Federal Way 2020-2026 Capital Projects document indicates that improvement projects are currently planned in the vicinity of the site. Descriptions of the nearest projects are provided below. 21st Ave S at S 320th St— Intersection (Project #27): This project intends to install a traffic and signalized pedestrian crosswalk. The project is to be completed from 2021- 2022 with a total estimated cost of $1,035,000. SW 320th St at 47th Ave SW – Intersection (Project #39): This project intends to install a traffic signal and pedestrian improvements. The project is to be completed by 2023 with a total estimated cost of $569,000. 8 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 4. FORECAST TRAFFIC DEMAND AND ANALYSIS 4.1 Project Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. This is usually denoted by the quantity or specific number of new trips that enter and exit a project during a designated time period, such as a specific peak hour (AM or PM) or an entire day. Data presented in this report was derived from the Institute of Transportation Engineer's publication Trip Generation, 10th Edition Manual. Two Land Use Codes (LUC) were found applicable with respect to defining the proposed project: LUC 937 Coffee Shop with Drive-Through Window and LUC 938 Coffee Shop with Drive-Through Window and No Indoor Seating. As the project intends to offer outdoor covered seating area (130 sq. ft.) and given the size of the proposed stand (561 sq. ft.), LUC 937 was deemed most representative of the project. The LUC 938 sample set contains all 90 sq. ft. stands and would therefore present unrealistic forecasts for larger stands/buildings. The LUC 937 sample sizes range from 390 sq. ft. up to about 5,000 sq. ft. and is more applicable for the proposed Jump Start Espresso project. Square footage was used as the input variable and average rates were applied to determine trip ends. The outdoor seating space was included in the trip calculations. It should also be noted that coffee stands generate a majority of trips from pass-by (i.e., customers already on the adjacent street system) in addition to new primary trips. Table 1 summarizes the total estimated project trip generation. Included are the average weekday daily traffic (AWDT) and the AM and PM peak hours as well as pass-by volumes. Refer to the appendix for trip generation output. Table 1: Project Trip Generation Land Use Size AWDT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Coffee w/ Drive-Thru 691 sq. ft. 88 4 3 7 3 3 6 Pass-by (89% AM 2; 80% PM 3) 478 27 27 54 12 12 24 Total Driveway Trips 566 31 30 61 15 15 30 2 Pass-by rates were derived from ITE Trip Generation Handbook, 3rd Edition (2017). 3 Pass-by rates were derived from the city of Federal Way’s Traffic Impact Fee Schedule. AWDT pass-by rate was derived by taking the average of the AM and PM peak hour rates. 9 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com Based on Table 1, the project is anticipated to generate a site total of 61 AM (31 inbound / 30 outbound) and 30 PM (15 inbound / 15 outbound) peak hour trips. As shown, a number of these trips are expected to be in the form of pass-by. Pass-by trips are defined as vehicles already captured on the adjacent roadway and are subsequently attracted to the site for a convenience-based stop. These trips are not considered as new trips but will impact the site’s access point. Coffee stands are largely influenced by location and spur of the moment stops. With SW 320th Street supporting a significant amount of vehicular volumes already passing the site, a number of trips are assumed to use the proposed services. 4.2 Distribution & Assignment Trip distribution describes the anticipated travel routes for inbound and outbound project traffic relative to the local street system. Figures 4 and 5 illustrate AM and PM peak hour intersection trip distributions, which were derived based on existing travel patterns identified from field counts and proximity to nearby arterials. Also illustrated are pass-by trips, which enter and depart the site with the same travel direction. 4.3 Future Peak Hour Volumes A 3-year horizon of 2023 was used for future traffic delay analysis. Forecast 2023 background traffic volumes were once again derived by applying a 1.5 percent compound annual growth rate per year to the baseline 2020 traffic volumes shown in Figure 3. Forecast 2023 AM and PM peak hour volumes without and with project are shown in Figures 6 and 7, respectively. 10 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 11 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 12 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 13 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 14 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 4.4 Future Level of Service Peak hour delays were determined through the use of the Highway Capacity Manual 6th Edition. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. The range4 for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Detailed descriptions of intersection LOS are given in the 2016 Highway Capacity Manual. Level of service calculations were made through the use of the Synchro 10 analysis program. For side-street stop-controlled intersections, LOS is determined by the approach with the highest delay. Table 2 below summarizes calculated delays at the access intersection. Table 2: Baseline 2020 & Forecast 2023 Peak Hour Level of Service Delays Given in Seconds per Vehicle Baseline 2020 Without 2023 With 2023 Intersection Control Peak Hour LOS Delay LOS Delay LOS Delay SW 320th St & Entrance Stop AM A 9.3 A 9.4 B 12.9 PM B 12.9 B 13.2 B 14.9 As indicated in Table 2, forecast 2023 AM and PM peak hour delays are shown to operate with acceptable service levels of LOS B or better conditions. No forecast operational deficiencies are identified at the access intersection with the additional vehicular demand as a result of the proposed development. 4 Signalized Intersections - Level of Service Stop Controlled Intersections – Level of Service Control Delay per Control Delay per Level of Service Vehicle (sec) Level of Service Vehicle (sec) A 10 A 10 B 10 and 20 B 10 and 15 C 20 and 35 C 15 and 25 D 35 and 55 D 25 and 35 E 55 and 80 E 35 and 50 F 80 F 50 Highway Capacity Manual, 6th Edition 15 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 5. CONCLUSIONS AND MITIGATION MEASURES Jump Start Espresso is a proposed drive-through espresso stand in the city of Federal Way encompassing a 561 square foot building and 130 square feet of covered, outdoor seating. The subject property is located on parcel #: 132103-9067 (0.44-acres). Primary access to the site is proposed via one existing, shared driveway entrance extending northwest from SW 320th Street. A total of 4 parking stalls will be provided on-site with an additional 5 provided just north of the subject site via a shared parking agreement, meeting the City’s parking stall requirements. A site plan illustrating the overall configuration of the project is presented in Figure 2. Based on ITE data, the project is estimated to generate 61 total AM and 30 total PM peak hour trips. A portion of site traffic is considered as pass-by (54 AM and 24 PM trips) and do not result in net new traffic to the adjacent street system. Forecast 2023 AM and PM peak hour delays are anticipated to operate at LOS B or better indicating no operational deficiencies at the access intersection. The roadway system is shown to have sufficient capacity to support the incoming project demands. Based on this analysis, recommended mitigation is as follows: 1.Pay traffic impact fees as required by the city of Federal Way. A review of the City’s current 2020 Fee Schedule, indicate the following rates: Espresso with Drive-Through: $34.99/sqft However, this fee was determined based on LUC 938 Coffee Shop with Drive-Through Window and No Indoor Seating. As previously mentioned, LUC 938 was determined to not be most representative of the project given the sample sites contained within the manual are all 90 square feet. LUC 937 Coffee Shop with Drive-Through Window was determined a better fit in terms of sample sizes and project description. As no fee rate is available in the City’s adopted fee schedule for LUC 937, an example using the City’s methodology is shown below. Actual fees will be determined and calculated by the City based on the current fee schedule in effect at time of building permit issuance. Table 3: Estimated Espresso Stand Traffic Impact Fee5 Land Use ITE Land Use Code Unit of Measure Basic PM Peak Hour Rate New Trip Rate* New Trip Rate Average Trip Length* Trip Length Adjustment* Fee Per Land Use Unit Espresso w/ Drive-Thru 937 Sq. Ft. 43.38 20% 8.7 2.0 0.65 $19.78/sf 5 *Values based on City of Federal Way’s Espresso with Drive-Through category under the 2019 Fee Schedule and base rate of $3,503 per PM peak hour trip. 16 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com JUMP START ESPRESSO TRAFFIC IMPACT ANALYSIS APPENDIX 17 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com LEVEL OF SERVICE The following are excerpts from the 2016 Highway Capacity Manual - Transportation Research Board Special Report 209. Six LOS are defined for each type of facility that has analysis procedures available. Letters designate each level, from A to F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions and the driver’s perception of those conditions. Level-of-Service definitions Level of service A represents primarily free-flow operations at average travel speeds, usually about 90 percent of the free-flow speed for the arterial classification. Vehicles are seldom impeded in their ability to maneuver in the traffic stream. Delay at signalized intersections is minimal. Level of service B represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free-flow speed for the arterial classification. The ability to maneuver in the traffic stream is only slightly restricted and delays are not bothersome. Level of service C represents stable operations; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the average free-flow speed for the arterial classification. Level of service D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free-flow speed. Level of service E is characterized by significant delays and average travel speeds of one- third the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. Level of service F characterizes arterial flow at extremely low speeds, from less than one- third to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalized locations, with long delays and extensive queuing. 18 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 10/16/2020 https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=AWDVTE&x=&edition=544&locationCode=General Urban… https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=AWDVTE&x=&edition=544&locationCode=General Urban/Suburban&co…1/1 Coffee/Donut Shop with Drive-Through Window (937) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 2 Avg. 1000 Sq. Ft. GFA: 2 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 820.38 738.66 - 869.00 * Data Plot and Equation Caution – Small Sample Size T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average Rate Fitted Curve Equation: Not Given R²= **** Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers 0 0.5 1.0 1.5 2.00 500 1,000 1,500 2,000 19 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 10/16/2020 https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=TASIDE&x=&edition=544&locationCode=General Urban/S… https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=TASIDE&x=&edition=544&locationCode=General Urban/Suburban&cou…1/1 Coffee/Donut Shop with Drive-Through Window (937) Vehicle Trip Ends vs:1000 Sq. Ft. GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location:General Urban/Suburban Number of Studies:61 Avg. 1000 Sq. Ft. GFA:2 Directional Distribution:51% entering, 49% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 88.99 18.32 - 353.57 48.19 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average Rate Fitted Curve Equation: Not Given R²= **** Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers 0 1 2 3 4 5 60 100 200 300 400 500 20 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 10/16/2020 https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urban/… https://itetripgen.org/PrintGraph.htm?code=937&ivlabel=QFQAF&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urban/Suburban&cou…1/1 Coffee/Donut Shop with Drive-Through Window (937) Vehicle Trip Ends vs:1000 Sq. Ft. GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:26 Avg. 1000 Sq. Ft. GFA:2 Directional Distribution:50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 43.38 2.09 - 92.31 18.88 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average Rate Fitted Curve Equation: Not Given R²= **** Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers 0 1 2 3 4 5 60 100 200 300 21 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 10/16/2020 https://itetripgen.org/PrintGraph.htm?code=938&ivlabel=QFQAF&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urban/… https://itetripgen.org/PrintGraph.htm?code=938&ivlabel=QFQAF&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urban/Suburban&cou…1/1 Coffee/Donut Shop with Drive-Through Window and No Indoor Seating (938) Vehicle Trip Ends vs:1000 Sq. Ft. GFA On a:Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location:General Urban/Suburban Number of Studies:4 Avg. 1000 Sq. Ft. GFA:0.09 Directional Distribution:50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 83.33 55.56 - 111.11 26.45 Data Plot and Equation Caution – Small Sample Size T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average Rate Fitted Curve Equation: Not Given R²= **** Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers 0 0.2 0.4 0.6 0.8 1.00 2 4 6 8 10 22 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com Project Name: Jumpstart Espresso Intersection: SW 320th St & Entrance Date of Count:  Thursday, 9/12/2019 Jurisdiction: City of Federal Way Project Number:  4353 HV R T L HV R T L HV R T L HV R T L Total 7:00 AM 0100518300000302290314 7:15 AM 0200209400000101810277 7:30 AM 0000205500000201582215 7:45 AM 0000304700000101450192 8:00 AM 0300208400000101250212 8:15 AM 0000208400000301311216 8:30 AM 0001306200000101512216 8:45 AM 00006178000001013722189:00 0601252587000001301,257 7 1,860 7:00 AM to  8:00 AM Total 030012127900000707132998 7:00 7:00 7:00 7:00 0.2 314 277 215 33 192 300 1 282 279 280 7:00 AM ‐ 8:00 AM 0 993 997 2 Intersection PHF:0.79 715 713 713 0 1 84 0 229 2 94 0 181 0 55 0 160 0 47 0 145 1 84 0 229 3 84 0 125 2 94 0 181 0 84 0 132 0 55 0 160 1 62 0 153 0 47 0 145 0 79 0 139 Northbound SW 320th St Project Entrance Heath & Associates, Inc. 2214 Tacoma Road Puyallup, WA 98371 6 Peak Hour Peak Total Heavy Veh. PHF Total SW 320th St Soutbound 0.78 Westbound EastboundTime   Period Project Entrance SW 320th St SW 320th St 1.0%0.0% 4.2% 0.38 0.74 23 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com Project Name: Jumpstart Espresso Intersection: SW 320th St & Entrance Date of Count:  Wednesday, 9/11/2019 Jurisdiction: City of Federal Way Project Number:  4353 HV R T L HV R T L HV R T L HV R T L Total 4:00 PM 02000118900000401142308 4:15 PM 0402102080000000962312 4:30 PM 0400002180000030770299 4:45 PM 07002126200000001102382 5:00 PM 0601102100000000925314 5:15 PM 05002022400000001003332 5:30 PM 04000021200000201072325 5:45 PM 020111192000000010333026:00 03404731,715 0000090799192,574 4:45 PM to  5:45 PM Total 02201519080000020409121,353 4:45 4:45 4:45 4:45 0.2 382 314 332 23 13 325 22 0 1 1 930 908 909 4:45 AM ‐ 5:45 PM 0 1,319 1,351 12 Intersection PHF:0.89 421 409 410 0 2 190 0 116 6 208 0 98 4 218 0 77 7 263 0 112 7 263 0 112 7 210 0 97 7 210 0 97 5 224 0 103 5 224 0 103 4 212 0 109 4 212 0 109 3 193 0 106 0.94 Westbound EastboundTime   Period Project Entrance SW 320th St SW 320th St 1.1%0.0% 0.4% 0.82 0.86 Northbound SW 320th St Project Entrance Heath & Associates, Inc. 2214 Tacoma Road Puyallup, WA 98371 36 Peak Hour Peak Total Heavy Veh. PHF Total SW 320th St Soutbound 24 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Baseline 2020 AM Peak Hour 1: SW 320th St & Entrance 09/24/2020 HCM 6th TWSC Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 724 283 1 0 3 Future Vol, veh/h 2 724 283 1 0 3 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 79 79 79 79 79 79 Heavy Vehicles, % 1 14411 Mvmt Flow 3 916 358 1 0 4 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 359 0 - 0 823 180 Stage 1 - - - - 359 - Stage 2 - - - - 464 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 1204 - - - 314 835 Stage 1 - - - - 680 - Stage 2 - - - - 602 - Platoon blocked, %- - - Mov Cap-1 Maneuver 1204 - - - 313 835 Mov Cap-2 Maneuver - - - - 433 - Stage 1 - - - - 679 - Stage 2 - - - - 602 - Approach EB WB SB HCM Control Delay, s 0 0 9.3 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h)1204 - - - 835 HCM Lane V/C Ratio 0.002 - - - 0.005 HCM Control Delay (s)8 - - - 9.3 HCM Lane LOS A - - - A HCM 95th %tile Q(veh)0 - - - 0 25 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Baseline 2020 PM Peak Hour 1: SW 320th St & Entrance 09/24/2020 HCM 6th TWSC Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 12 415 922 1 1 22 Future Vol, veh/h 12 415 922 1 1 22 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 1 11111 Mvmt Flow 13 466 1036 1 1 25 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1037 0 - 0 1296 519 Stage 1 - - - - 1037 - Stage 2 - - - - 259 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 672 - - - 155 504 Stage 1 - - - - 305 - Stage 2 - - - - 764 - Platoon blocked, %- - - Mov Cap-1 Maneuver 672 - - - 152 504 Mov Cap-2 Maneuver - - - - 247 - Stage 1 - - - - 299 - Stage 2 - - - - 764 - Approach EB WB SB HCM Control Delay, s 0.3 0 12.9 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h)672 - - - 482 HCM Lane V/C Ratio 0.02 - - - 0.054 HCM Control Delay (s) 10.5 - - - 12.9 HCM Lane LOS B - - - B HCM 95th %tile Q(veh)0.1 - - - 0.2 26 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Forecast 2023 AM Peak Hour Without Project 1: SW 320th St & Entrance 09/24/2020 09/23/2019 Baseline Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 757 296 1 0 3 Future Vol, veh/h 2 757 296 1 0 3 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 79 79 79 79 79 79 Heavy Vehicles, % 1 14411 Mvmt Flow 3 958 375 1 0 4 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 376 0 - 0 861 188 Stage 1 - - - - 376 - Stage 2 - - - - 485 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 1186 - - - 297 825 Stage 1 - - - - 667 - Stage 2 - - - - 588 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1186 - - - 296 825 Mov Cap-2 Maneuver - - - - 419 - Stage 1 - - - - 665 - Stage 2 - - - - 588 - Approach EB WB SB HCM Control Delay, s 0 0 9.4 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1186 - - - 825 HCM Lane V/C Ratio 0.002 - - - 0.005 HCM Control Delay (s) 8 - - - 9.4 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 27 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Forecast 2023 PM Peak Hour Without Project 1: SW 320th St & Entrance 09/24/2020 09/23/2019 Baseline Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 13 434 964 1 1 23 Future Vol, veh/h 13 434 964 1 1 23 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 1 11111 Mvmt Flow 15 488 1083 1 1 26 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1084 0 - 0 1358 542 Stage 1 - - - - 1084 - Stage 2 - - - - 274 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 645 - - - 141 487 Stage 1 - - - - 288 - Stage 2 - - - - 750 - Platoon blocked, % - - - Mov Cap-1 Maneuver 645 - - - 138 487 Mov Cap-2 Maneuver - - - - 232 - Stage 1 - - - - 281 - Stage 2 - - - - 750 - Approach EB WB SB HCM Control Delay, s 0.3 0 13.2 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)645 - - - 466 HCM Lane V/C Ratio 0.023 - - - 0.058 HCM Control Delay (s) 10.7 - - - 13.2 HCM Lane LOS B - - - B HCM 95th %tile Q(veh) 0.1 - - - 0.2 28 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Forecast 2023 AM Peak Hour With Project 1: SW 320th St & Entrance 10/12/2020 09/23/2019 Baseline Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 24 738 288 10 20 13 Future Vol, veh/h 24 738 288 10 20 13 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 79 79 79 79 79 79 Heavy Vehicles, % 1 14411 Mvmt Flow 30 934 365 13 25 16 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 378 0 - 0 899 189 Stage 1 - - - - 372 - Stage 2 - - - - 527 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 1184 - - - 280 824 Stage 1 - - - - 670 - Stage 2 - - - - 559 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1184 - - - 273 824 Mov Cap-2 Maneuver - - - - 398 - Stage 1 - - - - 653 - Stage 2 - - - - 559 - Approach EB WB SB HCM Control Delay, s 0.3 0 12.9 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1184 - - - 500 HCM Lane V/C Ratio 0.026 - - - 0.084 HCM Control Delay (s) 8.1 - - - 12.9 HCM Lane LOS A - - - B HCM 95th %tile Q(veh) 0.1 - - - 0.3 29 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com HCM 6th TWSC Forecast 2023 PM Peak Hour With Project 1: SW 320th St & Entrance 10/12/2020 09/23/2019 Baseline Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 18 430 956 11 7 32 Future Vol, veh/h 18 430 956 11 7 32 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 - Veh in Median Storage, # - 0 0 - 1 - Grade, % - 0 0 - 0 - Peak Hour Factor 89 89 89 89 89 89 Heavy Vehicles, % 1 11111 Mvmt Flow 20 483 1074 12 8 36 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1086 0 - 0 1362 543 Stage 1 - - - - 1080 - Stage 2 - - - - 282 - Critical Hdwy 4.12 - - - 6.82 6.92 Critical Hdwy Stg 1 - - - - 5.82 - Critical Hdwy Stg 2 - - - - 5.82 - Follow-up Hdwy 2.21 - - - 3.51 3.31 Pot Cap-1 Maneuver 644 - - - 140 487 Stage 1 - - - - 289 - Stage 2 - - - - 744 - Platoon blocked, % - - - Mov Cap-1 Maneuver 644 - - - 136 487 Mov Cap-2 Maneuver - - - - 230 - Stage 1 - - - - 280 - Stage 2 - - - - 744 - Approach EB WB SB HCM Control Delay, s 0.4 0 14.9 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)644 - - - 406 HCM Lane V/C Ratio 0.031 - - - 0.108 HCM Control Delay (s) 10.8 - - - 14.9 HCM Lane LOS B - - - B HCM 95th %tile Q(veh) 0.1 - - - 0.4 30 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com 31 2214 Tacoma Road Puyallup WA 98371 (253) 770 1401 Fax (253) 770 1473 heathtraffic.com