Loading...
20-105047-UP-Correspondence-06.03.2021-V1Reference to Comment or Revision See Attached Shared Parking Agreement Outdoor Waste Receptacle is indicated on Site Plan, Sht. A1.0 Height of the (Retaining) Wall at the Detention Pond is 6' or Less - see Civil for Elevation Pedestrian Path is indicated on Sheets A1.0, C1 &L-1 20-105246-UP Summary of Revisions See Comments & Drawings by AP Consulting See Comments & Drawings by AP Consulting See Request for Waiver by AP Consulting